HomeMy WebLinkAbout3263-1Landscape Improvement Plans
44,
C
'BVI �R
NTANA REQUIRED NOTES:
LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO CONTACT
_RING DIVISION'S LANDSCAPE INSPECTOR 48 HOURS
SIRED NSPECTION OF AN ITEM AT (909) 350-6633.
RELEASE OF UTILITIES OR MAINTENANCE PERIOD .
NT THE FOLLOWING NSPECTIONS ARE REQUIRED:
JSTRUCTION MEETING
DN OF RRLGATION SYSTEM EI OPEN TRENCH
N (PRIOR TO BACKFILL). MAINLINE PRESSURE TEST
'.S_I. FOR A THREE (3) HOUR CONTINUOUS PERIOD.
N CCDVERACE TESTS INCLUDING INITIAL AND
STS.
RADE PRIOR TO PLANTING,
ATERIALS PRIOR TO PLANTING AND SOIL
TION.
INCLUDING STREET TREES. CONTACT THE PARKS
AND LANDSCAPE DEVELOPPvIENT SECTION,
,ING DIVISION, FOR SPECIES AND FINAL
S
,11'--E WITH APPROVED PLANS.
�PECTION,
-R'S REPRESENTATIVE AND LAINDSCAPE CONTRACTOR
-SENT AT EACH NSPECTION,
Vicinity Map
not to scale North
&A i N IT9 . I
Title Sheet
d-1
Irrigation
Plan
d -a
Irrigation
Plan
Planting
Plan
Planting
Plan
d_5
Irrigation
Details
L
U
Planting
Details
d_1
Irrigation
Specifications
L=U
Planting
Specifications
d -O
R I C H A R D
0
EMU •
Landscape Architecture
Urban Design & Planning
455 W. 4th St., Ste. C San Bernardino, CA 92401
phone: (909) 888-5568 e-mail: rpa91 gmsn.com
fax: (909)384-9854
Richard Pope, Landscape Architect CA# 2664
N DSCA pF
'��/ `, X. POPE Lis 'P `\
67 y
JA
�� j j
OF GALE
Client:
Western Pacific Development
& Construction Co.
6710 Beryl Street
Alta Loma, CA 91701
(909) 989-2134
Attn: Jack Hall
cc
O
O �
� Q
Q
ca
v EW1
tR O cc
ca 4-0LA
CL)MN � E
R c 7 O
c � _
P" fOrr _O W CL
i
O0 1L
W L16ev
r
16.
G.7 = S
aca v -W'0
o ca LLI o o c
CL 1® U. V J
Sheet Description:
Title Sheet
Date: Aug. 21, 2002
RF'*A Job No.: 02-20
Drawn by: KD SN7c
Revisions:
Sheet:
nor I
Of: 9