Loading...
HomeMy WebLinkAbout3263-1Landscape Improvement Plans 44, C 'BVI �R NTANA REQUIRED NOTES: LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO CONTACT _RING DIVISION'S LANDSCAPE INSPECTOR 48 HOURS SIRED NSPECTION OF AN ITEM AT (909) 350-6633. RELEASE OF UTILITIES OR MAINTENANCE PERIOD . NT THE FOLLOWING NSPECTIONS ARE REQUIRED: JSTRUCTION MEETING DN OF RRLGATION SYSTEM EI OPEN TRENCH N (PRIOR TO BACKFILL). MAINLINE PRESSURE TEST '.S_I. FOR A THREE (3) HOUR CONTINUOUS PERIOD. N CCDVERACE TESTS INCLUDING INITIAL AND STS. RADE PRIOR TO PLANTING, ATERIALS PRIOR TO PLANTING AND SOIL TION. INCLUDING STREET TREES. CONTACT THE PARKS AND LANDSCAPE DEVELOPPvIENT SECTION, ,ING DIVISION, FOR SPECIES AND FINAL S ,11'--E WITH APPROVED PLANS. �PECTION, -R'S REPRESENTATIVE AND LAINDSCAPE CONTRACTOR -SENT AT EACH NSPECTION, Vicinity Map not to scale North &A i N IT9 . I Title Sheet d-1 Irrigation Plan d -a Irrigation Plan Planting Plan Planting Plan d_5 Irrigation Details L U Planting Details d_1 Irrigation Specifications L=U Planting Specifications d -O R I C H A R D 0 EMU • Landscape Architecture Urban Design & Planning 455 W. 4th St., Ste. C San Bernardino, CA 92401 phone: (909) 888-5568 e-mail: rpa91 gmsn.com fax: (909)384-9854 Richard Pope, Landscape Architect CA# 2664 N DSCA pF '��/ `, X. POPE Lis 'P `\ 67 y JA �� j j OF GALE Client: Western Pacific Development & Construction Co. 6710 Beryl Street Alta Loma, CA 91701 (909) 989-2134 Attn: Jack Hall cc O O � � Q Q ca v EW1 tR O cc ca 4-0LA CL)MN � E R c 7 O c � _ P" fOrr _O W CL i O0 1L W L16ev r 16. G.7 = S aca v -W'0 o ca LLI o o c CL 1® U. V J Sheet Description: Title Sheet Date: Aug. 21, 2002 RF'*A Job No.: 02-20 Drawn by: KD SN7c Revisions: Sheet: nor I Of: 9