Loading...
HomeMy WebLinkAbout3254-3t MAIN LINE RCP OR REINFORCED M0140LITHIC ARCH. SEE NOTE 2 r. SEL DTE:I43 I H 80 MM 131 MIN- C LATERAL/ ff 0 2, CONNECTOR PIPE G BARS En ROUND M 15 M 0 15 0 M _j t EDGE IM (04 0 6*) OC Z co ITO 7 Z+ Li IOM 0 450 mfn Z M wa 113 OR 04 0 w IN,- OC TIC BARS Uj to 1-1� w 0 1 Li cn ff� ------ —E AND F SARS fic co 15M 0 75 rmrn I Is 0 31) cc, SEE NOTE 8 L STA. POINT I�LQO CONNECTOR IF TABLE OF T 80 MM SEE NO TE 3 VALUES FOR T (31) MIN. LATERAL SEE NOTE 3 300 Y"#* (121 130 MM Is-) PLAN 375 mm 051 130 mrn t5n 450 mm (161 130 mm 15l) 525 mm 921*) i3o rnfo w) 'SPUR IOM 0 450 MM 600 MM 1241 140 mm 15 1,12') (05 OR 04 0 IS) 675 MM 427-11 140 mm 15 1/2.1 OC TIE BAR' 750 mm Q 09 150 MM w) REINFORCING STEE G BARS 15M0 150 mm I 0 61 OC 825 rnm 133 170 rnm (6 If 900 m- 13 61 170 `mm 46 f/2') 0 8MM f3) MIN'. 975 men (339.1 180L7'1"1 p SPRING 1'�O mrn TIE BARS LINE ROUND C) In 0 ELEV. R ELEV. S ao M Oc MN-0 BARS 6m F BARS 1:5 M (w5} til -1 OC rURBED CONCRETE CRADLE, 265-C-14 (450-C-2000), SEE NOTE 9 SECTION Z -Z SECTION SVC -M` AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER PROMULGATED By TV2 STANDARD PLAIN P LIC WGRKS STAN DAR DS_ JUNCTION STRUCTURE - PIPE TO PIPE INLET METAla UB . INC, G14GOOKOOMMITTEE MIN 19" ID _> 600 mm (2,C) OR OD > 1/2 MAINLINE ID 331 .. 2 REV. 1996 USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION SHEET IOF2 C LATERAL / CONNECTOR PIPE Nw IOM0450 min (03 OR #40401 OC ROUND EDGES TO RADIUS OF APPROXIMATE ID OF LATERAL. MAXIMUM ti 900 MM (36*) 150 A 8B OARS—,, (6.) OUND EDGES TO 75 mm (31 R 156 MM v Isom 11311 fkl AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER PROMULGATED BY THE TRANSITION STRUCTURE TABLE PURUCV40RIKSSTANDARMINC., GREENSOOKCOMMITtEE PIPE TO PIPE METRIC 340-1 1092 KB HOME FOR DIMENSIONS RFV49" SHEET I OF 2 USE WITH STANDARD SPEOIFICATIONS FOR PUBLIC WORKS CONSTRUCTION 801 CORPORATE CENTER DRIVE AND BAR SIZES SUITE 201 POMONA, CA 91768-564.1 BMG 77M, EM CONFORMANCE WITH (909) 802-1154 02 FAX (909) 802-1111 F OR OR co U_ 13 T vc a aw (mm) (INCHES) (mm) ONCHES) 300 Iz 110 4 rn e7 375 15 Ito 4 1/4 450 IS 120 4 1/2 525 21 130 5 Goo 24 140 5I/4 675 2-t 140 51/2 75�0­ 30 160 6 625 31 160 61/+) Soo 36 170 6 1/2 975 39 ISO 7 1050 42 Iso 71/2 c9 0 #P cy v on in '5 !2 15- in 1125 45 200 73/4 1200 48 210 a 1275 51 220 6 1/2 , 1350 54 230 9 - 1425 57 240 9 1/4 1500 60 250 9 1/2 1575 iss 260 to 1650 66 260 10 1/4 1725 69 280 10 3/4' 1800 72 260 It 1950 78 300 It i/4 2100 64 320 121/2 2250 so 340 13 1/4 0 r -01 9 09 0 :1 R 0 2400 96 360 14 2550 102 400 131/2 2700 too 410 16 2850 114 420 16 1/2 3000 120 440 1-r — L11$0 126 440 17 00 132 450 171/2 X300 3450 Ise 450 171/2 1144 460 1 Isom 11311 fkl AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER PROMULGATED BY THE TRANSITION STRUCTURE LA N STANDAR»-P PURUCV40RIKSSTANDARMINC., GREENSOOKCOMMITtEE PIPE TO PIPE METRIC 340-1 1092 KB HOME . RFV49" SHEET I OF 2 USE WITH STANDARD SPEOIFICATIONS FOR PUBLIC WORKS CONSTRUCTION NOTES 1. THIS JUNCTION STRUCTURE SHALL BE USED WHEN THE OUTSIDE DIAMETER OF THE LATERAL IS GREATER THAN 1/2 THE INSIDE DIAMETER 6 OF THE MAIN LINE; OR WHEN THE INSIDE DIAMETER B, OF THELATERAL IS GREATER THAN 600 mm, (24*), B SHALL NOT EXCEED .75 D'QR 975 rnm (39"L 2. IF THE MAIN LINE IS A REINFORCED MONOLITHIC ARCH STORMDRAIN. D SHALL REFER TO THE CLEAR SPAN OF THE ARCH. REINFORCING STEEL SHALL BE CUT AND SENT INTO THE JUNCTION STRUCTURE IN THE SAME MANNER AS FOR A PIPE. A CONCRETE CRADLE IS NOT REOUIRED FOR A REINFORCED MONOLITHIC ARCH. 3. STAT 1ONS SHOWN ON 'THE PROJECT DRAWINGS FOR LATERALS APPI Y AT THE INTERSECTION Or CENTER LINES OF MAIN LINE AND LATERAL. STATIONS SHOWN ON THE PROJECT DRAWINGS FOR CATCH BASIN CONNECTOR PIPES APPLY AT THE INTERSECTION OF THE INSIDE WALL OF THE MAIN LINE WITH THE CONNECTOR PIPE CENTER LINE. 4. VALUES FOR A. B. C AND D SHALL BE SHOWN ON THE PROJECT DRAWINGS. ELEVATION R AND ELEVATION S SHALL BE SHOWN ONLY WHEN REOUIRED PER NOTE 5. 5. 0.ELEVATIONS R AND S NEED NOT BE SHOWN ON THE PROJECT DRAWINGS IF THE IN I -ET PIPE IS TO ENTER THE MAIN LINE RADIALLY - b. ELEVATION R SHALL BE SHOWN ON THE PROJECT DRAWINGS ONLY IF A STUB IS TO BE PROVIDED I,N THE MAIN LINE FOR FUTURE CONNECTION OF AN INLET PIPE. c.ELEVATION S SHALL BE SHOWN ON THE PROJECT DRAWINGS IF AN INLET PIPE IS TO ENTER THE MAIN LINE OTHER THAN RADIALLY. INLET PIPE SHALL BE LAID ON A STRAIGHT GRADE FROM ELEVATION S TO THE CATCH BASIN OR GRADE BREAK IN LINE - 6. THE IN PIPE SHALL ENTER THE MAIN LINE RADIALLY UNLESS OTHc-RWISE' INDICATED. THE INLET PIPE MAY ENTER THE MAIN LINE OTHER THAN RADIALLY IF ANGLE A IS GREATER THAN 45". 6 IS LESS THAN OR EQUAL TO 600 mm (24*) AND THE OUTSIDE DIAMETER OF THE INLET PIPE IS LESS THAN .5 D:, OTHERWISE, STANDARD PLAN 340 SHALL BE USED. 7, NO MORE THAN ONE OPENING SHALL BE MADE, IN ANY ONE SECTION OF PIPE. 8. THE OPENING FOR THE BREAKOUT SHALL BE RECTANGULAR AND CUT NORMAL., TO THE PIPE SURFACE, WITHOUT DAMAGING THE REINFORCING STEEL- THE TRANSVERSE REINFORCEMENT Of` THE MAIN LINE SHALL BE CUT AT THE CENTER 'OF THE OPENING AND, BENT INTO THE TOP AND BOTTOM SLABS OF THE SPUR. 9. THE MAIN LINE SHALL BE REINFORCED WITH A CONCRETE CRADLE AND ENCASEMENT (AS APPLICABLE). A CONCRETE ENCASEMENT IS REOUIRED IF A JOINT IN THE MAIN LINE FALLS WITHIN, THE LIMITS OF THE CRADLE, THE CONCRETE ENCASEMENT SHALL EXTEND 300 mm (12-) ABOVE THE TOP OF THE MAIN LINE AND TO THE LIMITS OF THE CRADLE. IF CONNECTING TO AN EXISTING STORM DRAIN, PORTION OF CRADLE OPPOSITE INLET MAY BE OMITTED. 10. REINFORCING STEEL SHALL CONFORM,TO ASTM A 615M. GRADE 500. (ASTM A 615. GRACE 40), AND BE PLACED 40 mrn (1 1/2*) CL -EAP FROM CONCRETE SURFACES. UNLESS 07HERWISE SHOWN F BARS SHALL BE CARRIED TO A POINT NOT LESS THAN J DISTANCE FROM CENTER LINE WITH J=70/12 + 150 mm (16"). 11. FLOOR OF THE SPUR SHALL BE STEEL -TROWELED TO THE SPRING LINE OF THE SPUR. 12. DIMENSIONS SHOWN ON THIS PLAN FOR METRIC AND ENGLISH UNITS ARE NOT EXACT EQUAL VALUES, IF METRIC VALUES ARE USED. ALL VALUES USED FOR CONSTRUCTION SHALL BE METRIC VALUES. EXCEPT REINFORCING BARS SIZES IN ENGLISH UNITS MAY BE SUBSTITUTED FOR METRIC BAR SIZES. IF ENGLISH UNITS ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE ENGLISH UNITS. AMERICAN PUBLIC WORKS ASSOCIATION -SOUTHERN CALIFORNIA CHAPTERI STANDARD PLAN 331-2 SHEET 2 or 2 JUNCTION STRUCTURE — PIPE TO PIPE INLET ID k 600 mm (24') OR OD> 1/2 MAIN LINE ID NOTES 1. THE HORIZONTAL ANGLE OF CONVERGENCE OR DIVERGENCE, 0, SHALL NOT EXCEED 5045'. 2, VALUES FOR A. B. C. 01 AND D2 ARE SHOWN ON THE PROJECT DRAWINGS. ELEVATION R AND ELEVATIONS ARE SHOWN WHEN REOUIRED BY NOTE 10, 3., FLOOR OF STRUCTURE SHALL BE STEEL TROWELED TO SPRING LINE. 4. REINFORCEMENT STEEL SHALL CONFORM TO ASTM A 615 M (A 615), GRADE- 300(40), AND rSHALL TERMINATE 40 rnm (1 1/2) CLEAR OF CONCRETE SURFACES UNLESS OTHERWISE SHOWN, LONGITUDINAL BARS SHALL BE IOM 0 450 mm 03 OR #4 0 181) OC OR LESS. 5. ELEVATION S APPLIES AT INSIDE WALL OF STRUCTURE. 6. TRANSITION STRUCTURE SHALL BE POURED IN ONE CONTINUOUS OPERATION, EXCEPT THAT THE CONTRACTOR SHALL HAVE THE OPTION OF PLACING AT THE SPRING LINE A CONSTRUCTION JOINT LONGITUDINAL KEYWAY. 7. THE LENGTH OF THE STRUCTURE MAY BE INCREASED AT THE OPTION OF THE CONTRACTOR TO MEET RCP ENOS, USING D BAR$, LONGITUDINAL AND BOTTOM REINFORCEMENT IN EXTENDED PORTION OF SAME DIAMETER AND SPACING AS SPECIFIED IN THE TABLE, BUT ANY CHANGE IN THE LOCATION OF SPUR MUST BE APPROVED BY THE ENGINEER. S. EMBEDMENT P SHALL BE AS SPECIFIED IN THE TABLE, UNLESS OTHERWISE SHOWN ON THE PROJECT DRAWINGS. 9. WHEN THERE IS NO SPUR REOUIRED, A Si 8 BARS SHALL BE OMITTED. 10. WHEN ELEVATION R AND ELEVATION S ARE NOT SHOWN ON PROJECT DRAWINGS, INLET PIPE SHALL ENTER MAIN LINE RADIALLY. WHEN INLET PIPE ENTERS MAIN LINE OTHER THAN RADIALLY, ELEVATION S SHALL BE SHOWN ON PROJECT DRAWINGS, AND INLET PIPE SHALL BE LAID ON A STRAIGHT GRADE FROM ELEVATION S TO CATCH BASIN OR GRADE BREAK IN INLET LINE. ELEVATION R SHALL BE SHOWN ON PROJECT DRAWINGS ?ON- Y WHEN STUB IS TO BE PROVIDED IN MAIN N LINE FOR FUTURE C( NS S�M UCTION OF INLET PIPE. It. THE MAXIMUM COVER ABOVE THIS STRUCTURE SHALL BE 7.5 m (259. IF THE COVER EXCEEDS 7.5:m (25') A SPECIAL STRUCTURE SHALL BE DESIGNED FOR THE COVER AND DETAILED ON THE PROJECT DRAWINGS. 12. DIMENSIONS SHOWN ON THIS PLAN FOR METRIC AND ENGLISH UNITS ARE NOT EXACT EOUAL VALUES. IF METRIC VALUES ARE USED. ALL VALUES USED FOR CONSTRUCTION SHALL BE METRIC VALUES EXCEPT REINFORCING BAR SIZES IN ENGLISH UNITS MAY BE SUBSTITUTED FOR METRIC BAR SIZES. IF ENGLISH UNITS ARE USED. ALL VALUES USED FOR CONSTRUCTION SHALL <BE ENGLISH UNITS. REV. MMION 111"Muorn0 DATE I ENGR. I CITY I DATE n U CD CD CN o Ld DIAL TWO WORKING BEFORE DAYS BEFORE YOU DIG YOU DIG C) TOLL FREE 1 —SZr)OSE )— 0 0-7_13rf)rl A PUBLIC SERVICE BY UNDERGROUND SERVICE ALL C.L WL SHOULD Alt- SHOEW CONSTRUCTION OF REQ UHM METRIC 34o TRANSMIONISTRUCTURE PIPE TO PIPE SHEET 2 OF 2 REV. MMION 111"Muorn0 DATE I ENGR. I CITY I DATE n U CD CD CN o Ld DIAL TWO WORKING BEFORE DAYS BEFORE YOU DIG YOU DIG C) TOLL FREE 1 —SZr)OSE )— 0 0-7_13rf)rl A PUBLIC SERVICE BY UNDERGROUND SERVICE ALL C.L WL SHOULD Alt- SHOEW CONSTRUCTION OF REQ UHM 1WROVEMENTS NOT COCEWff= PREPARED FOR: TWO YEARS OF TRZ DATE OF APPROVAL KB HOME SHOWN KMON AND CARRM FORTH Pf A DRIGENT MANNER, THE CM EN MM MAY 801 CORPORATE CENTER DRIVE REQUME REWONS TO THE PLANS TO SUITE 201 POMONA, CA 91768-564.1 BMG 77M, EM CONFORMANCE WITH (909) 802-1154 CONDITIONS AND STANDARDS IN EFFECT FAX (909) 802-1111 I SE C 1.4TERAVCONNE�CTOR PIP�, tONC� PIPE. RCP OR t MAIN LINE RCP -j 4L MAINLINE RCP too -CLASS C E MORTAR sax STA. P�T� fAB BEDDING OF I--, 114LET 'PIPE A 14 BACIKFILL WITH 456 265 Kg -C-14 M a I# CONCRETE OR COMPACT SOL TO IISMM RELATIVE DENSF REOUIRED BY SPECIFICATIONS CASE I UNDISTURBED EA TH SPECIFICATI PLAN CASEII SECTION B-6 FOR OUTLET SEE STIES, CATCH OAS IN PLANS 44v -CATCH BASIN FLOORO CASE 2 MEE NOTE'S 9 'a 10) -71 1/2 00 MUN. BACKFILL BEDDING CASE I SECTION C—C PLA I YIN SADDLE O�NNECTION STANDAR11PLAN Pa MIMIC 33:2 -1 BEARINGS ARE BASED ON THE CENTERLINE OF HEMLOCK AVENUE, BEING THE EAST LINE OF THE WEST 112 OF THE SOUTHEAST 1/4, SECTION 35, TOWNSHIP I NORTH, RANGE 6 WEST, SAN BERNARDINO BASE AND MERIDIAN, BEING NORTH 00*11'07" EAST AS SHOWN ON TRACT NO. 16009, MAP BOOK 285, PAGES 71 TO 74, OFFICIAL RECORDS OF THE COUNTY OF SAN BERNARDINO. BENCMARKPrepared By: ALLARD ENGINEERING CALTRANS BENCHMARK NO. 8-17 BRASS CAP IN CONCRETE S.C.E. TOWER LEG. Civil Engineering - Land Surveying - Land Planning 343' N10 HIGHLAND AVENUE, 0.2 Mi. W10 8253 Sierra Avenue SAN SEVAINE ROAD, IN SOUTH CONCRETE BASE Fontana, California 92335 OF S.C.E. TOWER 19.5; 2.65 Mi. W. ALONG (909) 356-1815 Fax (909) 356-1795 HIGHLAND AVENUE FROM SIERRA AVENUE I In David S. Hammer, H.C.E. 43976 Date ELEVAT1,9N.- 1428.6090 (expires 6/30/2005) GENERAL NOTE 1, DIMF_N$I0N$ SHOWN ON THIS PLAN FOR METRIC AND ENGLISH UNITS ARE NOT EXACT EOUAL VALUES. IF METRIC VALUES ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE METRIOVALUES. IF ENGLISH UNITS ARE USED, ALL VALUES USED FOR CONSTRUCTION S14ALL BE ENGLISH UNITS. CASE I ANDCASE 2 1. IF ANGLE A IS LESS T14AN 45D OR IF D IS LARGER THAN 600 rmm (24*), THEN ANOTHER STANDARD STRUCTURE SHALL BE SPECIFIED. Z. THE OUTSIDE DIAMETER OF THE INLET PIPE SHALL NOT EXCEED ONE-HALF THE INSIDE DIAMETER OF THE MAIN LINE. 3- THE INLET PIPE S14ALL ENTER THE MAIN LINE RADIALLY. IF THE INLET PIPE CANNOT ENTER RADIALLY, THEN ANOTHER STANDARD STRUCTURE SHALL. BE SPECIFIED. 4. THE SIZE OF THE OPEN ING INTO THE MAIN LINE SHALL..BE THE OUTSIDE DIAMETER OF THE INLET PIPE PLUS 30 mm W) MINIMUM TO 75 mm (3") MAXIMUM. 5. ALL CONNECTOR PIPES FOR CASE 2 SHALL EEENCASED IN CONCRETE IF LAID WITHIN THE MAIN LINE EXCAVATED TRENCH OR IF LAfD ON FILL WHICH HAS NOT BEEN DENSIFIED. 6, BURN OR CHIP END OF CONNECTOR PIPE FLUSH WITH INNER SURFACE OF MAIN LINE, ROUND EDGE Or CONCRETE PIPE OR RCP. 7. ALL CSP AND FITTINGS SHALL BE GALVANIZED. 8_ STATION SPECIFIED ON THE PROJECT DRAWINGS APPLIES AT THE INTERSECTION OF THE INSIDE WALL Or MAIN LINE AND THE CENTER LINE Or INLET PIPE. 9, CASE 2 SHALL NOT BE USED TO CONNECT TO THE: FLOOR OF A GRATING AT BASIN, WHERE THE GRATE WILL BE SUBJECTTO VEHICLE TRAFFIC. 10. FOR CASE 2. NOT MORE THAN 3.5 m (12') OF INLET PIPE SHALL BE LOCATED WITHIN THE MAIN LINE EXCAVATED TRENCH. CAS It. CONNECTIONS TO PIPES 525 mm (218) OR LESS IN DIAMETER WITHOUT JUNCTION STRUCTURES OR PRECAST Y BRANCHES SHALL BIC MADE WITH SADDLES. 12. THE OUTSIDE DIAMETER OF THE INLET PIPE SHALL NOT EXCEED ONE-HALF THE INSIDE DIAMETER OF THE MAIN LINE, 1TRIMOR CUT SADDLE TO FIT SNUGLY OVER THE OUTSIDE OF THE MAIN LINE SO 'ITS AXIS WILL BE ON THE LINE AND GRADE OF THE CONNECTOR PIPE. 14. THE OPENING INTO THE Ill ;SHALL BE CUT AND TRIMMED TO FIT THE SADDLE SO THAT NO PART WILL PROJECT WITHIN THE BORE OF THE SADDLE PIPE. 15.THE-CONNECTOR PIPE SHALL BE SUPPORTED AS SHOWN IN CASES I AND 2 - PROPOSED 24" STORM DRAIN EXISTING 12" WATER MAIN eFNO 5' MIN. 5' MIN. VJATEJR CI?OSSINGDEIrAlL it rz SCALE. l'--3' ESS/ MA-DoLE7,4AjD,4fsoa*ftr Alc. Ilk WtAal CM - Pl. -ctilrP-00, OA17WO, CA - ql�&l ca Ltd NOG 36637 RECORD DRAWING, THESE RECORD DRAWINGS HAVE BEEN PAISPARED, IN PAFM ON THE BASIS OF INFORMATION COMPILED ANO FURNISHED BY OTHERS, THE ENGINCER WILL NOT Ot RESPONSIBLE FOR ANY ERRORS OR 0MISSION9 WHICH HAVE BEEN INCORPORATED INTO THE DOCUMENTAS A RESULT THEREOF CITY AV FONTANA, 1% A )VESS/ %off wa- %oraLIFORNIA L B "LGROVE 11 COQ IMUNIT"Olry PLAN C DRAWN BY. STOW DRAIN SCALE: No. 43976 IT1 AE AS NOTED Exp. 6/30/05 DESIGNED BY. 0PROVEMMAANS, TRACT 16269 DATE. AE AUGUST, 2003 C/Vlk- CHECKED W PP __--7D B 1 — R� TARS CAQ� DRAWING NO.: 3 DS*i CITY ENG fMEER R.C.E.M52 32H 3 Filename: M:\DWG\19201\STORM DRAIN\SD-3.dwg