Loading...
HomeMy WebLinkAbout2769-18I I Virginia Dare Tower 10470 Foothill Blvd. Rancho Cucamonga California 91730-3754 tel: 909 987 0909 fax: 909 980 9980 APPROVED APPROVED Rw' J U L 3 0 2002 APPROVED`t:tt-.ti ARCyi,ji M ^ 'ji ,�. LAR WOLFF � $ 84 Q WINDOW DETAILS DRAWN RG/AM CHECKED— DATE SFPIEUBER 1999 SCALE AN NOTED JOB N0. 98177 « HEADER, SEE 3/4 GYPSUM BOARD i —EXTERIOR PLASTER OVER METAL LATH AND PAPER CEILING FRAMING, SEE STRUCTURAL DRAWINGS FRAMING, SEE STRUCTURAL DRAWINGS a. SHIM STRUCTURAL DRAWINGS EXTERIOR PLASTER OVER METAL LATH AND - PLYWOOD SHEATHING WHERE OCCURS FURRING BOARD ELS R BUILDING PAPER s ` 2X FRAMING, SEE STRUCTURAL DRAWING FRAMING, GURAL PLYWOOD SHEATHING :` C.M.U. WALL ': - °.: 7-4" A.F.F.SEE �. �.•.: ••.. .:.• - DRAWINGS WHERE OCCURS C.M.U. N 1 EXTERIOR PL STER OVER i SHIM F� • METAL LATH AND M i GYPSUM BOARD BUILDING PAPER1 CONT. DRIP MOLDING C.M.U. ANCHORC.M.U. ANCHOR _ SHIM 1 ALUMINUM WINDOW i 7'-4" 3/8" /8» GLAZING PER ---- J CONT. DRIP MOLDING i SCHEDULE CONT. BACKER ROD Miv A. HEAD AND SEALANT -4 A.F.F. , " M N H.M. FRAME f-�.1 �, N L\ �- CONT. BACKER ROD " r� 1 _ .. �..h icI `" CONT. ., .XER ROD AND SEALANT i CONT. WOOD TRIM GLASS BLOCK MASONRY z� - -\ .iJ AND SEALANT L\i _\ �'J i R N SCREEN ' EXTERIOR PLASTER OVER W o H.M. FRAME METAL LATH AND o = a it H.M. FRAME GLASS STOP 1 ALUMINUM WINDOW � BUILDING PAPER 30 s o 'n GLASS STOP SHIM PLYWOOD SHEATHING z w CL z w z W SHIM ♦ CONT. BACKER ROD ? w WHERE OCCURS Z w -r GLASS STOP w D o W SHIM z w o a.0 w 1 15/16 » 1 15/16 ''� AND SEALANT �� w� a o ow CONT. MOLDING a � p w 3 v GLAZING PER o v CONT. MOLDING M 3 CONT. BACKER ROD ALUMINUM FRAME 3 v o v' o SCHEDULE o (n 3 4 a 2X FRAMING,SEE N oo AND SEALANT O GLAZING PER SCHEDULE a z w o STRUCTURAL DRAWINGS Z Cr w H.M. FRAME Z w 1 15/16" a 1 15/16 1 15/16« z * a GLAZING, SEE SCHEDULE INSULATION 1 15/16" GLASS STOP ---- o. EXTERIOR PLASTER OVER GLAZING PER SCHEDULE FIBERGLASS REINFORCED VERIFY 5 3/4 3/4 » METAL LATH AND VERIFY PANEL OVER CEMENTITIOUS BUILDING PAPER BACKING BOARD �/Xx/xx + B: SILL FILE/CSI NUMBER: 14 SI ATE: )0(/XX/XX JOB NUMBER: FILE/CSI NUMBER: 0 018 REMPON DA XX/xx JOB NUMBER: FILE/CSI NUMBER: XWND20 REMSI ATE: JOB NUMBER: FILE/CSI NUMBER: '. 9 N ATE: XX/XX/XX JOB NUMBER: FILE/CSI NUMBER: XWN013 VISIO ATE: XX/XX/XX JOB NUMBER: 1 FILE/CSI NUMBER: XWND08 REVISION DATE: XX/)0(/)Of JOB NUMBER: HEAD/JAMB SI M 3»=1'-0" 21 HEAD 3„=�,_o,, 17 HEAD 3»=�'-o" 13 HEAD/SILL 3„=�,_o„ 9 JAM B 3„_�,_o„ HEAD �c SILL/JAMB SIM. 3„-1,_O«5 1 o LINE OF GYSUM BOARD 2X FRAMING, SEE 400 GYPSUM BOARD 1 15/16" CEILING OR SUSPENDED CEILING WHERE STRUCTURAL DRAWINGS GLAZING, SEE SCHEDULE v -OCCURS .;; 0 w �' EXTERIOR PLASTER OVER VERIFY .._ -----I NSULATION SUSPENDED CEILING PLYWOOD SHEATHING WHERE OCCURS ? z o 3 4 w METAL LATH AND BUILDING PAPER _____ __ PLYWOOD SHEATHING SYSTEM 1 15/1 w 45/1 2X FRAMING, SEE JDOOR z= PER SCHEDULE GYPSUM BOARD 1 3 STRUCTURAL DRAWINGS 0 2X FRAMING, SEE GYPSUM BOARD o ow SHIM PLYWOOD SHEATHING W w p v 3�8 " STRUCTURAL DRAWINGS HEADER, SEE GYPSUM BOARD a 1 :' WHERE OCCURS cn STRUCTURAL DRAWINGS ` GLASS STOP 1 CONT. MOLDING o w CONT TSEALANET ROD " M _ _ r CONT BACKER ROD ; o a 00 • _ T-4 1 k.C4 1 1 i- \ I L\./\�J H.M. FRAME i AND SEALANT r. � �. '' ' <. • ,. T-4" A.F.F. C4 ALUMINUM WINDOW-\ FRAME SYSTEM �J SHIM N AND SEALANT '� '� i i M N �'`-~---- H.M. FRAME N EXTERIOR PLASTER OVER LATH 1» CONT. BACKER ROD BUILDING PAPEMETAL R i ALUMINUM WINDOW 1 1/2» CONT. BACKERROD GLASS STOP 00 i i i >� ao W z H.M. FRAME H.M. FRAME GLAZING PER SCHEDULE z nw. GLAZING, SEE SCHEDULE C.M.U. ANCHOR 1 I CONT. HARD WOOD TRIM III GLASS STOP w O GLASS STOP - TYP. 31 15/16" cn p i i LINE OF SILL BELOWIf W i GLAZING C.M.U. WALL i j PER a r i SCHEDULE —GLAZING PER SCHEDULE 15 1 5 1 CONT. MOLDING EXTERIOR PLASTER OVER i i _ GLAZING PER SCHEDULE 1 15 16" / METAL LATH AND 3 4 BUILDING PAPER VERIFY VERIFY SCREEN FILE/CSI NUMBER: X0023 REVISION DAZE: XX/XX/XX JOB NUMBER: FILE/CSI NUMBER: XWW10 REVISION DATE: XX/XX/XX JOB NUMBER: FIL /CSI NUMBER: 21 EIASION DA0(/XX/)(X JOB NUMBER: FILE/CSI NUMBER: XWN030 REVISION DATE: XX/XX/XX JOB NUMBER: FILE/CSI NUMBER: )0=04 VISI ATE: XX/XX/XX JOB NUMBER: FILE/CSI NUMBER: X0022 1[VISI ATE: XX/XX/XX JOB NUMBER: HEAD 3»=�'-o" 22 JAMB 3„_�,_o” 18 JAMB/SILL SIM.., 3„=�,_o« 14 JAMB 3„-�'_�” 10 JAMB 3» =�'_o„ 6 HEAD 3»=�'-o» 2 INSULATION INSULATION GYPSUM BOARD VERIFY VERIFY EXTERIOR PLASTER OVER FRAMING, SEE PLYWOOD SHEATHING METAL LATH AND BUILDING PAPER STRUCTURAL DRAWINGS 1 15/16” 1 15/16« LINE OF CEILING r--------- - -FINISH FLOOR -SEE GYPSUM BOARD GLAZING PER SCHEDULE WHERE OCCURS PLYWOOD SHEATH FINISH SCHEDULE SCHEDULE ING 1 ALUMINUM WINDOW GLAZING PER SCHEDULE 2X FRAMING, SEE POLYMER FINISH FLOOR. - SEE 3/8« GYPSUM BOARD FRAME SYSTEM STRUCTURAL DRAWINGS SOLID FINISH SCHEDULE SEE EXTERIOR PASTER OVER COUNTERTOP AND SPLASH STRUCTURAL DRAWINGS 1METAL LATH AND GLAZING PER CONT. MOLDING 0 JAMB BUILDING PAPER ALUMINUM FRAME SCHEDULE DRIP MOLDING ® HEAD, i CONT. MOLDING WHERE OCCURS ---+1 _ T-4=