Loading...
HomeMy WebLinkAbout2266-1r (DON al - e i i t S '� 1 fs 3 ,^ ^ A i ' :• oil SO s rw of Z M •� i O J /f11i r IA W/� n 71� M h hrr,,. •v{n 1 N��w, ��\ �� �� • /' • . � t� �'�I' ~tea �; '� J'�► w►~�",11-1. � - ; •' - • — .��— _ — /V► • -.. ,.q�+•.-+"^-'-• �,,,qq �,,,• -mit_ - M PF PAR on n ' - 1 LIST OF INSPECTIONS PROJECT LOCATION MAPSHEET INDEX. _ IRRIGATION AS BUILT FIELD MEASUREMENTS FURNISHED BY: TERRA CAL CONSTRUCTION COMPANY SHEET NO. SHEET TITLE T►e Contractor shall contact the City's General Services Agency and the Owner's Representative in advance of the following inspections (but not L-1 COVER SHEET limited to) in the time indicated: PROJECT 1. Pre -job conference - 5 days. SITE �5 P-1 PHASE MAP a� 2. At completion of finish grading - 72 hours. ��°e LC— LANDSCAPE CONSTRUCTION PLAN Highland Ave _ -- — - ---- APPROVED LC -2 LANDSCAPE CONSTRUCTION PLAN: 3. Layout of walkways but prior to installation - 72 hours. . Y P uthern Pacific Railroad PREPARED FOR: 4. Layout of header but prior Lo installation - 72 hours. � Baseline Road LE -1 LANDSCAPE ELECTRICAL PLAN - e CITY ENGINEER R.C.E. 5. Layout of walls, sign walls, pilasters but prior to installation - � CITY OF FONTANA 72 hours. Foothill Blvd LI -1 LANDSCAPE IRRIGATION PLAN - 6. Hwy ' 6. When trees and shrubs are spaced for planting but before holes are -- - -- excavated - 72 hours. ; e ; L1-2 LANDSCAPE IRRIGATION PLAN 7. At deliver of all plant materials to the site - 72 hours. • : g > < CITY N0. REVISIONS BY DATE APPROVAL DATE Y P c c < a. Y - LP -1 LANDSCAPE PLANTING PLAN RECORD SET ,U,92 _77A L. During entire irrigation installation to verify and inspect the > _ ; ; c i ADD: PHASE MAP NUMBER RAB 5%93'NIL following (but not limited to): _ W W m `P-2 LANDSCAPE PLANTING PLANDA. San Bernardino Freeway 1-10 _ - a. Point of connections - 72 hours. - b. Backflow prevention devices - 72 hours. LD- i LANDSCAPE CONSTRUCTION DETAILS 8101 CHERRY AVENUE/FOHTANA, CA 8233b/(714)888-2581 C. Trenchingfor pipes - 72 hours. ( d. Electrical connections - 72 hours. LD -2 �� tt 1� (ARCHWAY) e. Control valves - 72 hours. LD -3 LANDSCAPE ELECTRICAL, DETAILS PREPARED BY: f. Coverage - 72 hours. 'LD -4 LANDSCAPE IRRIGATION DETAILS 9. At pre -maintenance inspection - 5 days. LD -5 LANDSCAPE PLANTING DETAILS _Landan esu n r10. At final ins ection 5 da s. OP Y ABBI��VIATIONS, -230 16V"RT ,CENTER- DRIVE, SUITE 200/NEWPORT BEACH, CA 82860/(714)720-1.188 ALGIi. Align I.D. Inside Diameter AUTO Automatic MAX Maximum Center Line MIN. Minimum DATE: C.M.U. Concrete Member Unit N.I.0 Not In Contract EONC•. Concrete O.C. On Center Cour. Cot,Ez �. E. Ped Hlevetion DECEMBER, 5,1988 C.O. Conduit I. Property Line C.P. Corner Pilaster P.O.B. Point Of Beginning D,G. Decomposed Granite P.S.I. Pounds per Square Inch ELF' ElectrDia*etic PV PolyVinylChloride 'JUNE 2 6 . i 9 89 ELECT. Electrical PVC. EQ. Equal R, RAD. Radius - - EXIST. Existing SCH. Schedule F.G.•• Finish Grade• SQ. Square F.O.W. Face Of Wali' T.P. Top of Pilaster F:S. Finish Surface T.W.. Top of Wall - i GND. Ground TYP. Typical G.P.R. Callon Per Minute HORIZ. Horizontal DRAWING N0.:2266 SHEET NO.: I OF 14 A�