HomeMy WebLinkAbout3125-1CITY OF FONTANA GENERAL NOTES
FOR STREET IMPROVEMENT
1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE
CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN
BOOK"). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS
OTHERWISE NOTED.
2. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA ENGINEERING DIVISION PRIOR TO
THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS
PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610.
3. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES. CONTRACTOR SHALL
COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS.
4. CURVE DATA REFERS TO THE FACE OF CURB.
5. STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE NOTED.
6. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS.
7. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION. HOWEVER,
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION
AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE
THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227•?( tOOTWO
WORKING DAYS BEFORE EXCAVATION.
8. ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE
PAVING CONTRACTOR UPON COMPLETION OF PAVING.
9. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT
LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION,
DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY
COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES.
10. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL
PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER.
11. TYPE, LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE DETERMINED AT THE TIME OF
CONSTRUCTION AND SHALL CONFORM TO THE CITY OF FONTANA STANDARD DETAILS.
12. WHEN CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY
REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK", THE CONTRACTOR SHALL IMMEDIATELY
REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION.
13. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT.
14. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING
CONCRETE.
15, NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED
AND APPROVED.
16. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY
SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE
DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL
ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT.
17. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5
FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY.
18, NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR,
19, THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED
ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT
PRIOR WRITTEN APPROVAL.
20. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER
TRAFFIC CONTROL AT ALL TIMES.
21. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE
REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED
DENSITY IS OBTAINED.
22. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.
23. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR
TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION,
24. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET
IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY
NON-ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS.
25. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS
WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER.
26. REMOVAL AND REPLACEMENT OF EXISTING SURVEYCONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT
TIES AND BENCH MAEKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR.
SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED.
THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO
MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT.
27. PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND APPROVAL OF THE
CITY ENGINEER AS DETERMINED BY SOILS TESTS TAKEN AFTER COMPLETION OF ROUGH GRADING.
28. ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE MATERIAL FOR STRUCTURAL STREET SECTIONS
SHALL BE RECOMMENDED BY A GEOTECHNICAL REPORT AND SUBMITTED TO THE CITY OF FONTANA FOR
APPROVAL UPON COMPLETION OF ROUGH GRADING.
29. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A
MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CLOSURE AREA FOR RESIDENTS AND
EMERGENCY VEHICLES.
30. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT PRIOR APPROVAL OF
THE INSPECTOR.
31. THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE SEWER
LATERAL.
32. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING
ADEQUATE WATERING, AT ALL TIMES,
33. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES
DESCRIBED IN THE "W.A.T.C.H. MANUAL", LATEST EDITION UNLESS OTHERWISE DIRECTED BY THE CITY
TRAFFIC ENGINEER.
34. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES,
AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER.
35 ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES EXCEED 25 MILES
PER HOUR.
36 CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED BY
THE CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER.
CITY
STREET
OF FONTANA
MPROVEMENTS
4" PCC SIDEWALK
PER. FONTANA CITY
STD. PLAN 101S _
W�
�-�-- 3.68 (12')-
1.52
12')1.52 2.16
(5') (7')
�I
PARKWAY
CURB & GUTTER
PER A.P.W.A.121-1
TYPE A2-8
PLANS
10.36 (34')
7.32 (24') owl
4.57 (15') --0-1--a-- 2.75 (9')
2%
an
7 - - -mom
4" A.C. PVMT. i
"GPINO MIN, OX
OLEANDER AVE.
STA.0+24.99 TO STAO+42.98
TYPICAL CROSS SECTION
NOT TO SCALE
EXISTING
A. C. P VM T.
N �
I .
i
18.20 (60')
14.33 (47') 3.96 (13')
f
`7 P^ f 3' } �-� r� (r ;= 2.44 1.52 f
i SAW CUT &
JOIN EXISTING o
-------------
4"
4" ,PCC SIDEWALK
LLL
0.0.o,o.'p Q o•.. PER. FONTANA CITY
"x ` ` PARKWAY STD. PLAN 10P5
EXISTING OVC-E L IA'r
A.C. PVMT. G%2 A.C. PVMT CURB & GUTTER PER
CALTRANS STD. PLAN A87,
TYPE A2-200
FOOTHILL BLVD.
STA. 0+ 1'7.38TO STA. 0+53.43
TYPICAL CROSS SECTION
QUANTITY ESTIMATE
CURB & GUTTER 237 LF.
DRIVEWAY, W=25' 2 EA.
4" SIDEWALK 1160 SF.
ACCESS RAMP 1 EA.
4" A.C. 3000 SF.
9" AGG BASE 3000 SF.
CATCH BASIN, W=7' 1 EA.
18" R.C.P. 45 LF.
F.H. RELOCATED 1 EA.
STREET LIGHT RELOCATION 1 EA.
REMOVE: EXIST. CURB 110 LF.
REMOVE EXIST. 3"' A.C. PVMT. 2500 SF.
41
NOT TO SCALE
Q
i
INDEX TO
SHEETS
SHEET N0.
REMARKS
1
TITLE SHEET - SECTION,
NOTES & KEY MAP
2
FOOTHILL BLVD. PLAN &
PROFILE
3
OLEANDER AVE. PLAN &
PROFILE
Q
i
Q
Q
PROJECT
FOOTI-lll..L
%
BLVD
-
U
W
�
U
LPL.AI�D
AVE
KEY MAP
STATE OF CALIFORNIA
CONSTRUCTION NOTES
1 -ALL WORK WITHIN STATE RIGHT OF WAY SHALL CONFORM TO CALTRANS' STATE
STANDARD PLANS DATED JULY 1996 AND STANDARD SPECIFICATIONS DATED
JULY 1995 AND THE MANUAL OF TRAFFIC CONTROLS DATED 1996.
2 -TRAFFIC SHALL BE MAINTAINED IN ACCORDANCE WITH SECTIONS 7-1.08 &
7-1.09, AND
OR 86-1.05 & 86-1.06 OF THE STATE STANDARD SPECIFICATIONS.
3-A TRAFFIC CONTROL
SYSTEM SHALL CONSIST OF CLOSING TRAFFIC LANES
AND/OR SHOULDERS IN ACCORDANCE WITH THE DETAILS SHOWN ON THE
FOLLOWING CALTRANS' STANDARD PLANS FOR LANE CLOSURE; T-11, ALL TRAFFIC
CONTROLS USED FOR THE TRAFFIC CONTROL SYSTEM SHALL CONFORM TO
CALTRANS' TRAFFIC MANUAL, CHAPTER 5, "MANUAL OF TRAFFIC CONTROL
FOR CONSTRUCTION AND MAINTENANCE WORK ZONE".
4 -THE PERMITEE SHALL BE RESPONSIBLE FOR REMOVAL OF ANY CONFLICTING
TRAFFIC STRIPES AND PAVEMENT MARKINGS DURING THE LIFE OF THE PERMIT.
ALL CONFLICTING TRAFFIC STRIPS AND PAVEMENT MARKINGS REMOVED SHALL
BE RESTORED TO THEIR ORIGINAL CONDITION OR BETTER PRIOR TO
TO COMPLETING THE PERMIT.
5 -WHENEVER WORK TO BE PERFORMED IS WITHIN 6 FEET OFA TRAFFIC LANE,
THE LANE SHALL BE CLOSED (EXCEPT THE WORK, INSTALLING, MAINTAINING,
AND REMOVING TRAFFIC CONTROL DEVICES.)
6 -ANY REMOVAL OF EXISTING STATE FACILITIES SHALL BE RESTORED
TO THEIR ORIGINAL CONDITION OR BETTER PRIOR TO COMPLETING
THIS PERMIT -
7 -NO EQUIPMENT OR MATERIALS MAY BE STORED ON THE STATE RIGHT
OF WAY.
8 -ALL DISTURBED AREAS IN THE STATE RIGHT OF WAY MUST BE TREATED
FOR ERASION CONTROL (HYDROSEEDlNG OR EQUIVALENT, OR AS
DIRECTED BY THE STATE'S REPRESENTATIVE). THE RESPONSIBILITY
FOR MAINTAINING EROSION CONTROL WILL NOT BE RELEASED UNTIL
THE SEEDING IS WELL ESTABLISHED. THE CONTRACTOR WILL BE
RESPONSIBLE FOR THE COST OF CALTRANS CLEANING ANY DRAINAGE
STRUCTURES /CHANNELS WHICH HAVE BECOME CLUTTERED WITH DEBRIS
AND/OR SILT AS A RESULT OF, OR CAUSED BY, THE CONSTRUCTION
PROJECT.
9 -THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT ANY
STATE DRAINAGE FACILITY WHICH IS CONNECTED TO OR DIRECTLY
AFFECTED BY THE CONTRACTORS OPERATION SHALL BE CLEAN AND
OPERATIONAL PRIOR TO FINAL ACCEPTANCE OF THE PERMIT WORK BY
THE STATE. ADEQUATE CLEAN -OUTS AND ACCESS OPENINGS SHALL BE
PROVIDED IN ANY CONSTRUCTION WITHIN THE STATE'S RIGHT OF WAY
FOR FUTURE MAINTENANCE AND REPAIR WORK AS NEEDED. THIS WORK
SHALL BE FURNISHED AT NO COST TO THE STATE.
10 -THE PAVEMENT SHALL BE SAW -CUT 2' MINIMUM FROM THE EDGE OF
PAVEMENT. THE SAW -CUT MUST BE PERPENDICULAR OR PARALLEL TO
THE STATE HIGHWAY CENTERLINE.
11 -ALL SIGNING, STRIPING AND PAVEMENT MARKINGS SHALL BE IN
CONFERENCE WITH THE CURRANT EDITION OF THE TRAFFIC MANUAL,
PUBLISHED BY THE STATE OF CALIFORNIA, DEPARTMENT OF TRANS-
PORTATION, AND THE SPECIAL PROVISIONS. ALL PAVEMENT MARKINGS
SHALL BE THERMOPLASTIC UNLESS OTHERWISE NOTED ON THE PLANS.
12 -THE EXACT LOCATION OF ALL SIGNS SHALL BE DETERMINED IN
THE
FIELD BY THE STATES REPRESENTATIVES.
13 -ALL CONFLICTING STRIPING AND PAVEMENT MARKINGS NOT SHOWN ON
THE PLANS SHALL BE REMOVED FROM THE PAVEMENT BY SANDBLASTING
BY THE CONTRACTOR.
14 -ALL CONFLICTING SIGNS SHALL BE EITHER REMOVED OR RELOCATED
BY THE CONTRACTOR. RELOCATABLE SIGNS SHALL BE REINSTALLED AS
PUBLISHED BY THE STATE OF CALIFORNIA, DEPARTMENT OF TRANS -
STATE'S REPRESENTATIVE.
15 -ALL SIGNS, ROADSIDE MARKERS, ELECTROLIERS, ETC. SHALL BE
PROTECTED AND/OR REPLACED IN-KIND ACCORDING TO THE CURRENT
STATE STANDARD PLANS AND THE CURRENT TRAFFIC MANUAL, AT NO
COST TO THE STATE.