Loading...
HomeMy WebLinkAbout3096-7el m x V ' AND COVER-- ol^ I { ZIL ��N r 15M O 300 mm(•4012') EACH WAY S mm(1/4.1R � F �1 FACE PLATE ASSEMBLY STREET. GUTTER. OR LOCAL DEPRES- SION SURFACE -7 L r - L 100 mm (4'1R ^m �I �I IL 3` 2 SLOPE OPTIONAL SUBGRADE LCO14NECTOR PIPE 2.0 m(T) 1.8 m(6') 150 mm(61 150 mm(6.) - o OR MONOLITHIC CATCH BASIN B CONNECTION I TO 75 NNe FLOW LINE P' C)' 75 mm - (3 )R N €€ e PFACE LATE e- IL I I CLO STEPS Y-- a-1 �� DOWELi T� 3.5 M021 200 mm(8') 250 MMOO') FOR W > 9 m(289. V > 3.5 rM121 OR 8 > 1.2 m(41) SEE PROJECT PLANS IOM O 450 (TYP.)-' Ell z N25 Tow 145.1 200 w 17 3AI SCORING 1275 w Ism no w N IM F BARS PIPE JOINT o� Ni u W i z W o f CURB LINE ^' j n • ILINE- I to in M09 was 1694 260 w 60 3/4 1630 ae (7271 280 waw (II-) tF EXTRA 15Wo4) (4') OC. SEE NOTE 3.-= e... ;. e. - ' I • :'. '; UNDISTURBED EARTH �� I J' o; . •.n. BACKFILL WITH 263 Kg -C-14 MPa (450-C-2000) MIX CONCRETE. OR COMPACT SOIL TO RELATIVE DENSITY REQUIRED BY SPECIFICATIONS. BACKFILL ON UNDISTURBED EARTH TO STORM MAY BE OMITTED IF STRUCTURE IS LAIDb3600 Z- Z DRAIN WALL. STEPS u C0 a I2 ON 2 SIDES OF , oo 0261 30 w 117'1 w 0321 50 w 07SECTION w 11361 450 w a7 V2•) ISM O 73 mm MANHOLE FRAME I I t 100 mm m AND COVER 415 O 31 OC. (4•)MIN. a I 300 mm 75 m m u BASIN? (12')MAX`l (3')R -� ' ICATCH MANHOLE FRAME o W WALL AND SLAB DIMENSIONS AND REINFORCEMENT REQUIREMENTS ' AND COVER-- ol^ I { ZIL ��N r MAX ItF V F �1 FRONT WALL L =� L : 2.4 m(81 150 mm(61) 150 mm(6') �� 0 I- OPTIONAL SUBGRADE LCO14NECTOR PIPE 2.0 m(T) 1.8 m(6') 150 mm(61 150 mm(6.) - �p = ori OR MONOLITHIC CATCH BASIN B CONNECTION 1.2 m(41 150 mm(6') 150 mm(6.) TO 75 NNe /.- - 4.0 m(141 3.5 W121) 200 min(8.1 250 mm((01 N €€ e At e- IL I I CLO STEPS Y-- a-1 �� SECTION A -A „ J I I / a u I �- 100 mm X200 mm(e•1 -� DOWEL (TYP.) PLAN IOM(•4) 90• � M F DOWEL DETAIL STRUCTURAL DATA WALL AND SLAB DIMENSIONS AND REINFORCEMENT REQUIREMENTS MAX W MAX ItF V REINFORCEMENT REQUIRED IN FRONT WALL REAR WALL IBOTTOMI SLAB END WALL 1.0 m(3.51 2.4 m(81 150 mm(61) 150 mm(6') #4 BAR @ 12 0.C. TYPICAL 1.0 W3.51 3.5 m(121 200 mm(81 200 mm(8') 2.0 m(T) 1.8 m(6') 150 mm(61 150 mm(6.) 2.0 m(71 3.5 In(12') 200 mm(9 1 200 mm(8') 4.0 m(14') 1.2 m(41 150 mm(6') 150 mm(6.) TO 75 NNe 2.4 ml8•) 150 mm(61 200 mm(8.1 4.0 m(141 3.5 W121) 200 min(8.1 250 mm((01 N €€ e -, N Ch 1.2 ihi41 150 mm(6.1 150 mm(61 L8 m(6') 150 "m(6') 200 mm(8.1 2.4 in(W) 200 mWe•) 200 mm(B•3 3.0 m(10') 200 mRdB•) 230 mm(10') 3.5 M021 200 mm(8') 250 MMOO') FOR W > 9 m(289. V > 3.5 rM121 OR 8 > 1.2 m(41) SEE PROJECT PLANS AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER PROMULGATED TA DARDBY PUBLIC WO -KS STANDARDS INC. CURB�OPENING CATCH BASIN STANDARD PLAN METRIC OREENEOOK CO41MfTTEF_ a,9d4.. f1\ ID? 600 mm 24 OR ID > 112 MAIN LII ID 00 - 300-2 REV. 1996 SHEET 1 OF 2 USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION It MAIN LINE RCP OR REINFORCED MONOLITHIC ARCH, SEE NOTE 2 I J r4 ti t LATERAL/ CONNECTOR PIPE W PiiAUNK5 T DARDS JUNCTION STRUCTURE - PIPE TO PIPE /VLET STANDARD " ROUND 10 f1\ ID? 600 mm 24 OR ID > 112 MAIN LII ID MTIC 331-2 REV load BARS USE 1MTN STANDARD BPECIFICATHM FOR MIBLIC WORKS CONSTRUCTION o 1 (EDGE 1 ' ' CONSTRUCTION JOINT PLAN 2. 7 '-" C w n ISM O ISO 111111 (e4 O 61) OC $25 wle (218) 130 ass (5.) 12 c TO 75 NNe 623 w 1339 160 w 15 V41 JI p o ~o .. Z+ 113.1 R - - roso mw (4r) w an 0 Im IOM O 450 ,,I _ t- n z N25 Tow 145.1 200 w 17 3AI 1220 eel (48•) 210 wall (8') 1275 w Ism no w N IM F BARS PIPE JOINT mm (•3 OR s4 a 181) u W i 1350 ww (541 230 Trial (91) W o f T 1500 was (527) 240 w N V41 1500 ww 1609 240 =0 Vr) 1650 w 1631 260 w 609 OC TIE BARS z I^ Lew to in M09 was 1694 260 w 60 3/4 1630 ae (7271 280 waw (II-) 1950 wed (74M 300 w 01 3/41 2100 awn (64.) 320 w 62 V29 (4') OC. SEE NOTE 3.-= e... ;. e. - ' I • :'. '; UNDISTURBED EARTH �� I J' o; . •.n. BACKFILL WITH 263 Kg -C-14 MPa (450-C-2000) MIX CONCRETE. OR COMPACT SOIL TO RELATIVE DENSITY REQUIRED BY SPECIFICATIONS. BACKFILL ON UNDISTURBED EARTH TO STORM MAY BE OMITTED IF STRUCTURE IS LAIDb3600 Z- Z DRAIN WALL. E AND F BARS u C0 2440 wlw (961360 mw 64'1 I , oo 0261 30 w 117'1 w 0321 50 w 07SECTION w 11361 450 w a7 V2•) ISM O 73 mm 415 O 31 OC. SEE NOTE 6 ' u ' STA. POINT TABLE CONNECTOR PIPE 80 mm SEE NOTE 3 VALUES F I (3.1 M4 N. STA. POINT B LATERAL SEE NOTE 3 300 mm an 130 PLAN 375 Raw, 415.1 1 130 450 wed (IS•} 130 523 mm (21_) 130 SPUR IOM O 450 ams 03 OR e4 O 181) OC TIE BAR REINFORCING STEEL I 0 BARS ISM O 150 (Am (e4 O 6.) OC F.t 80 Rwn8013• MIN. SPRING ' I LINE ROUND) (511EDGES ELEV. R 1051 JE BARS .1 OC (sat .\ ELEV. S / 060 Iran t3 "J F BARS ISM 051 O 75 mm (31) OC UNDISTURBED , CONCRETE CRADLE. EARTH HH 265-C-14 (430-C-2000). SEE NOTE 9 SECTION Z -Z SECTION M -M BARS G BARS AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER PiiAUNK5 T DARDS JUNCTION STRUCTURE - PIPE TO PIPE /VLET STANDARD " A PV UC GREENB OSTAN COMMITTEE INC.. GREENBO 19 COMMITTEE ,�4 f1\ ID? 600 mm 24 OR ID > 112 MAIN LII ID MTIC 331-2 REV load SHEET 1 OF 2 USE 1MTN STANDARD BPECIFICATHM FOR MIBLIC WORKS CONSTRUCTION NOTES: I. WHERE THE BASIN IS TO BE CONSTRUCTED WITHIN THE LIMITS OF EXISTING OR PROPOSED t S DEWALKR I 0 5 CONTIGUOUS TO SUCH SIDEWALK. THE TOP SLAB OF THE BASIN MAY BE POURED EITHER MONOLITHIC WITH THE SIDEWALK OR SEPARATELY. USING THE SAME CLASS OF CONCRETE AS IN THE BASIN. WHEN POURED MONOLITHICALLY, THE SIDEWALK SHALL BE PROVIDED WITH A WEAKENED PLANE OR A 25 mm(I•) DEEP SAWCUT CONTINUOUSLY AROUND THE EXTERNAL PERIMETER OF THE CATCH BASIN WALLS. INCLUDING ACROSS THE FULL WIDTH OF THE SIDEWALK. SURFACE OF ALL EXPOSED CONCRETE SHALL CONFORM IN SLOPE. GRADE. COLOR, FINISH, AND SCORING TO EXISTING OR PROPOSED CURB AND WALK ADJACENT TO THE BASIN. 2. ALL CURVED CONCRETE SURFACES SHALL BE FORMED BY CURVED FORMS, AND SHALL NOT BE SHAPED BY PLASTERING. 3. FLOOR OF BASIN SHALL BE GIVEN A STEEL TROWEL FINISH AND SHALL HAVE A LONGITUDINAL AND LATERAL SLOPE OF 1:12 MINIMUM AND I:3 MAXIMUM, EXCEPT WHERE THE GUTTER GRADE EXCEEDS 8 PERCENT, IN WHICH CASE THE LONGITUDINAL SLOPE OF THE FLOOR SHALL BE THE SAME AS THE GUTTER GRADE. SLOPE FLOOR FROM ALL DIRECTIONS TO THE OUTLET. 4. DIMENSIONS; S = 970 mm(3'-2') V = THE DIFFERENCE IN ELEVATION BETWEEN THE TOP OF THE CURB AND THE INVERT OF THE CATCH BASIN AT THE OUTLET - 1.35 m(4.5'). V U = THE DIFFERENCE IN ELEVATION BETWEEN THE TOP OF THE CURB AND THE INVERT AT THE UPSTREAM END OF THE BASIN. AND SHALL BE DETERMINED BY THE REQUIREMENTS OF NOTE 3. BUT SHALL NOT BE LESS THAN CURB FACE PLUS 300 mm(12'). V1 THE DIFFERENCE IN ELEVATION BETWEEN THE TOP OF THE CURB AND THE INVERT OF THE INLET. NOTED ON THE PROJECT PLANS. H NOTED ON THE PROJECT PLANS. W = NOTED ON THE PROJECT PLANS. A = THE ANGLE,IN DEGREES. INTERCEPTED BY THE CENTERLINE OF THE CONNECTOR PIPE AND THE CATCH BASIN WALL TO WHICH THE CONNECTOR PIPE IS ATTACHED. 5. PLACE CONNECTOR PIPES AS INDICATED ON THE PROJECT PLANS. UNLESS OTHERWISE SPECI- FIED, THE CONNECTOR PIPE SHALL BE LOCATED AT THE DOWNSTREAM END OF THE BASIN. WHERE THE CONNECTOR PIPE IS SHOWN AT A CORNER. THE CENTERLINE OF THE PIPE SHALL INTERSECT THE INSIDE CORNER OF THE BASIN. THE PIPE MAY BE CUT AND TRIMMED AT A SKEW NECESSARY TO INSURE MINIMUM 80 mm(3') PIPE EMBEDMENT, ALL AROUND, WITHIN THE CATCH BASIN WALL. AND 75 mm(3•) RADIUS OF ROUNDING OF STRUCTURE CONCRETE, ALL AROUND. ADJACENT TO PIPE ENDS. A MONOLITHIC CATCH BASIN CONNECTION SHALL BE USED TO JOIN THE CONNECTOR PIPE TO THE CATCH BASIN WHENEVER ANGLE *A* IS LESS THAN 70 DEGREES OR GREATER THAN 110 DEGREES, OR WHENEVER THE CONNECTOR PIPE IS LOCATED IN A CORNER. THE OPTIONAL USE OF A MONOLITHIC CATCH BASIN CONNECTION IN ANY CASE IS PERMITTED. MONOLITHIC CATCH BASIN CONNECTIONS MAY BE CONSTRUCTED TO AVOID CUT- TING STANDARD LENGTHS OF PIPE. 6. STEPS SHALL BE LOCATED AS SHOWN. IF THE CONNECTOR PIPE INTERFERES WITH THE STEPS. THEY SHALL BE LOCATED AT THE CENTERLINE OF THE DOWNSTREAM END WALL. STEPS SHALL BE SPACED 300 mm(12') APART. THE TOP STEP SHALL BE 175 mm(71 BELOW THE TOP TO THE MANHOLE AND PROJECT 65 mm(2-I/2'). ALL OTHER STEPS SHALL PROJECT 130 mm(5'). 7. DOWELS ARE REQUIRED AT EACH CORNER AND AT 2 m(7'1 ON CENTER (MAXIMUM) ALONG THE BACKWALL. 8. THE FOLLOWING STANDARD PLANS ARE INCORPORATED HEREIN: 308 MONOLITHIC CATCH BASIN CONNECTION 309 CATCH BASIN REINFORCEMENT 310 CATCH BASIN FACE PLATE ASSEMBLY AND PROTECTION BAR 312 CATCH BASIN MANHOLE FRAME AND COVER 635 STEEL STEP 636 POLYPROPYLENE PLASTIC STEP 9. DIMENSIONS SHOWN ON THIS PLAN FOR METRIC AND ENGLISH UNITS ARE NOT EXACT EOUAL VALUES. IF METRIC VALUES ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE METRIC VALUES. EXCEPT REINFORCING BARS SIZES IN ENGLISH UNITS MAY BE SUBSTITUTED FOR METRIC BAR SIZES, IF ENGLISH UNITS ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE ENGLISH UNITS, AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER STANDARD PLAN 300 - 2 JUNCTION STRUCTURE - PIPE TO PIPE INLET ID Z 600 mm 24" OR > 112 MAIN LINE ID CURB OPENING CATCH BASIN SHEE7 2 Of 2 NOTES 1. THIS JUNCTION STRUCTURE SHALL BE USED WHEN THE OUTSIDE DIAMETER OF THE LATERAL IS GREATER THAN 1/2 THE INSIDE DIAMETER D OF THE MAIN LINE: OR WHEN THE INSIDE DIAMETER B OF THE LATERAL IS GREATER THAN 600 mm (24.1. B SHALL NOT EXCEED .75 D OR 975 mm (39'). 2. IF THE MAIN LINE IS A REINFORCED MONOLITHIC ARCH STORM DRAIN. D SHALL REFER TO THE CLEAR SPAN OF THE ARCH. REINFORCING STEEL SHALL BE CUT AND BENT INTO THE JUNCTION STRUCTURE IN THE SAME MANNER AS FOR A PIPE. A CONCRETE CRADLE IS NOT REQUIRED FOR A REINFORCED MONOLITHIC ARCH. 3. STATIONS SHOWN ON THE PROJECT DRAWINGS FOR LATERALS APPLY AT THE INTERSECTION OF CENTER LINES OF MAIN LINE AND LATERAL. STATIONS SHOWN ON THE PROJECT DRAWINGS FOR CATCH BASIN CONNECTOR PIPES APPLY AT THE INTERSECTION OF THE INSIDE WALL OF THE MAIN LINE WITH THE CONNECTOR PIPE CENTER LINE. 4. VALUES FOR A. B. C AND D SHALL BE SHOWN ON THE PROJECT DRAWINGS. ELEVATION R AND ELEVATION S SHALL BE SHOWN ONLY WHEN REQUIRED PER NOTE 5. 5. a. ELEVATIONS R AND S NEED NOT BE SHOWN ON THE PROJECT DRAWINGS IF THE INLET PIPE IS TO ENTER THE MAIN LINE RADIALLY. b. ELEVATION R SHALL BE SHOWN ON THE PROJECT DRAWINGS ONLY IF A STUB IS TO BE PROVIDED IN THE MAIN LINE FOR FUTURE CONNECTION OF AN INLET PIPE. c. ELEVATION S SHALL BE SHOWN ON THE PROJECT DRAWINGS IF AN INLET PIPE IS TO ENTER THE MAIN LINE OTHER THAN RADIALLY. INLET PIPE SHALL BE LAID ON A STRAIGHT GRADE FROM ELEVATION S TO THE CATCH BASIN OR GRADE BREAK IN LINE. 6. THE INLET PIPE SHALL ENTER THE MAIN LINE RADIALLY UNLESS OTHERWISE INDICATED. THE INLET PIPE MAY ENTER THE MAIN LINE OTHER THAN RADIALLY IF ANGLE A IS GREATER THAN 45• B IS LESS THAN OR EQUAL TO 600 mm (24.1 AND THE OUTSIDE DIAMETER OF THE INLET PIPE IS LESS THAN .5 D: OTHERWISE. STANDARD PLAN 340 SHALL BE USED. 7. NO MORE THAN ONE OPENING SHALL BE MADE IN ANY ONE SECTION OF PIPE. 8. THE OPENING FOR THE BREAKOUT SHALL BE RECTANGULAR AND CUT NORMAL TO THE PIPE SURFACE WITHOUT DAMAGING THE REINFORCING STEEL. THE TRANSVERSE REINFORCEMENT OF THE MAIN LINE SHALL BE CUT AT THE CENTER OF THE OPENING AND BENT INTO THE TOP AND BOTTOM SLABS OF THE SPUR. 9. THE MAIN LINE SHALL BE REINFORCED WITH A CONCRETE CRADLE AND ENCASEMENT (AS APPLICABLE). A CONCRETE ENCASEMENT IS REQUIRED IF A JOINT IN THE MAIN LINE FALLS WITHIN THE LIMITS OF THE CRADLE. THE CONCRETE ENCASEMENT SHALL EXTEND 300 mm 021 ABOVE THE TOP OF THE MAIN LINE AND TO THE LIMITS OF THE CRADLE. IF CONNECTING TO AN EXISTING STORM DRAIN, PORTION OF CRADLE OPPOSITE INLET MAY BE OMITTED. 10. REINFORCING STEEL SHALL CONFORM TO ASTM A 615M. GRADE 300. (ASTM A 615. GRADE 40), AND BE PLACED 40 mm (1 1/2') CLEAR FROM CONCRETE SURFACES. UNLESS OTHERWISE SHOWN F BARS SHALL BE CARRIED TO A POINT NOT LESS THAN J DISTANCE FROM CENTER LINE WITH J■7D/12 + 150 mm (6'). 11. FLOOR OF THE SPUR SHALL BE STEEL -TROWELED TO THE SPRING LINE OF THE SPUR. 12. DIMENSIONS SHOWN ON THIS PLAN FOR METRIC AND ENGLISH UNITS ARE NOT EXACT EQUAL VALUES. IF METRIC VALUES ARE USED. ALL VALUES USED FOR CONSTRUCTION SHALL BE METRIC VALUES. EXCEPT REINFORCING BARS SIZES IN ENGLISH UNITS MAY BE SUBSTITUTED FOR METRIC BAR SIZES. IF ENGLISH UNITS ARE USED. ALL VALUES USED FOR CONSTRUCTION SHAI I RF FMPI ICu IIAIITc AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER STANDARD PLAN METRIC 2 SHEET 2or2 JUNCTION STRUCTURE - PIPE TO PIPE INLET ID Z 600 mm 24" OR > 112 MAIN LINE ID PRIME BENCH MARK: SECONDARY BENCH MARK: p Q CITY OF FONTANA B.M. 581 SOUTHEAST CORNER JURUPA AVE. RAILROAD SPIKE IN EASTERLY & MULBERRY AVE.; SET CHIS. " " AVE.; SET CHIS. " " 0 BCR; DIAL TWO WORKING FACE OF POWER POLE NO. 674320 E 64.0' S 0 JURUPA AVE AT THE NORTHWEST CORNER OF � 6. BEFORE MULBERRY AVE. YOUDDIG DAYS AYGUBDIGRE JURUPA AVENUE AND MULBERRY AVENUE ELEV. = 915.775 A PTOLL FREE ' UBLIC SERVICE BY uNDERGR1-80 -227- ALER ELEV. 918.40OUND T = iiv s O! N {-t MAIN ' LINE RCS 1 1 11 p7, W BARS SEE NOTE 3 ROUND EDGE TO 73Rim (3.1R - STATION POINT, SEE NOTE 2 - ZZ CONSTRUCTION JOINT IOM O 450 mm (•4 O 181) OC LATERAL / P CONNECTOR PIPE F BARS ISM O 450 mm Q (e4 0 18'1 OC ? BOTH WAYS TC BE USED WHEN f y e IS 1500 mm \ OM 0 450 (60.) OR MORE o3s°Roc SECTION G -G BARS -V \ /Z ROUND EDGES TO APPROXIMATE R B T h m STANDARD LAN E OF ID OF LATERAL � I WITH A MAXIMUM ti� InI O B E BARS a O. E.H8IGBARS I1 a a c w r 300 sal (121 130 awn (S') o SHEET T Of 2 375 wed 051 130 Rea (51) 1 ' ' CONSTRUCTION JOINT PLAN 2. 7 '-" C w n 430 two (16'1 130 Ivan 15.1 $25 wle (218) 130 ass (5.) 600 •w• (2111 NO wr 15 1/41 675 two 42r) HO w (5 V21 750 Two (361 160 naw (6.1 623 w 1339 160 w 15 V41 I NEW OR EXISTING RCB. SEE NOTE 6 e n 973 wed (361 170 w 01 IM 990 = (39'1 180 laal (71) roso mw (4r) w an 0 Im W BARS �- D BARS ANY STANDARD 0 0 tP N25 Tow 145.1 200 w 17 3AI 1220 eel (48•) 210 wall (8') 1275 w Ism no w N IM F BARS PIPE JOINT 1350 ww (541 230 Trial (91) 2-H BARS 100 Ran p. (4') OC. SEE NOTE 3 f T 1500 was (527) 240 w N V41 1500 ww 1609 240 =0 Vr) 1650 w 1631 260 w 609 ROUND �+-+- i EDGES IOM O 450 Ron (e3 OR e4 as ELEV. S. O 18') OC ELEV. R. SEE NOTE 8 SEE NOTE 8 E BARS 1 2-G BARS 100 wall T e ,^ - 11M ww 166.1 260 w 60 M09 was 1694 260 w 60 3/4 1630 ae (7271 280 waw (II-) 1950 wed (74M 300 w 01 3/41 2100 awn (64.) 320 w 62 V29 (4') OC. SEE NOTE 3.-= e... ;. e. - ' I • :'. '; UNDISTURBED EARTH �� I J' o; . •.n. BACKFILL WITH 263 Kg -C-14 MPa (450-C-2000) MIX CONCRETE. OR COMPACT SOIL TO RELATIVE DENSITY REQUIRED BY SPECIFICATIONS. BACKFILL ON UNDISTURBED EARTH TO STORM MAY BE OMITTED IF STRUCTURE IS LAIDb3600 Z- Z DRAIN WALL. 2400 wed (90'1340 w 63 U41 : S h ^' c 0 e .•. • 2440 wlw (961360 mw 64'1 2530 wed DWI 400 w 05 VIM 2700 wed 606. 410 own (16•) 3000 was (114.1420 w 06 Vr) 3050 w 0201 430 alw 1171 oo 0261 30 w 117'1 w 0321 50 w 07SECTION w 11361 450 w a7 V2•) w 0441 460 wed I"M AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER KWIC�KSSSTTNBY DARDSINC.. JUNCTION STRUCTURE - PIPE TO RCB STANDARD LAN GREENBOOKCOMIMTTEE I1 333-1 ,0114 saw slop. oa puffer REV. lase SHEET T Of 2 USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION 04 f64 a. Totol-2 aG" -0' thnaafor•7".. barb Into wall3" Fille Reye � xT12._„.. Min 1T_I- ShMIn0 well plps SECTION 8 - IL •H6•' battam bend dash Into .011 sir or ('y ', e Type 2 4 •hoope , 0 12.. I - IS" Lt --I- "t -y - - Total -3 2'-11 Min --LT outside old o1 pipe • 3" TYPE G2 -C•' will very with different Matas curb fyP0 orates. are type•. bee Tao• o Sheen Vieth and woo l tnloxnews for ?"o A I1 tarbovan 64 Tatol-2 saw slop. oa puffer _ •lei band ;; 1 wolf, •4816- f r• Fillet C I T IZ'-111i" Yln 271 T 1 ou+iioe Dto of I, lips 3 : SECTION D -D ••C•• Match Curb type V- 11 �- r ---- - 6 I 1 r SECT A -A IF 1 _ G 1, (C A Typl'nats 24 I; A II « I ITT.I 2•-O•• ITI TYPE GI I,TII2'-11%" Mtn OrIT�� outside Dia Of pipe • 3" t / Match Gua- b�a / Type A Gwen r'1`, F-Vor gutter ficel slopM guttesionr -Saxm stope as putty SECTION C -C n 1 STANDARD PLAN METRIC 333 - 1 JUNCTION STRUCTURE - PIPE TO RCB 9 n I1 . ' ate n, Type 24 _ I 1 ' ;; 1 "'������JJJ N i f n L r I 2•-o I t l TYPE G3 Type E orb only ,._T.. Sam slogs �4" as gutter I l u! O I 2'-0" -1 TI SECTION F -F Fr--'c+a i STANDARD PLAN METRIC 333 - 1 JUNCTION STRUCTURE - PIPE TO RCB 9 1 F Grate Type Is = n L IT 1 2•-0'• ITI TYPE G6 Matas Curb type Type 62 Mown 1•-►.• .Saw slaps t• . ___.�. as gutter E x a i 2 _ = o 1.1 : a 12.3 a IIT I z• -o•' 127 I SECTION E -E 1 nx E - Grote "I ype r L_ 1 N i 1• t n ITI 2' -0' • LT� TYPE G5 "RECORD DRAWIN(Zlxs 99 �_ host updabY07.d 2 IQ 0K 1&� 2oo7sD-c(TYD7.aw9 _ E DATE REVISION DESCRIPTION DATE ENGR aTY DATE ggorm Thiene. Engi�eerin�c. CITY O F FO NTANA, CALIFORNIA ODED SHT 10 & 11, MOVED LINE "C", REVISED CHANNE 4/16/0 •7�6• '�( 6 �'� CONNECTION AND RISER GRADING, ADDED DET. 333-1, SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT �� pK I• q��,F� MWAk �'�'' JURUPA AVENUE STORM DRAIN DELETED DET. 183-A ADDED CONC. APRON. COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL RL04)MI-4911 rMM4)M1- 17J RecoRo DRAWING allelm H -A• "I Ift0• SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER � i z DRAWN BY: SCALE: VERT. 1e = 4t THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO >k R.C.E. No. 253 Prepared Under The Supervision Of : DESIGNED BY' DETAILS DATE. HORIZ t' = 40' BRING THEM INTO CONFORMANCE WITH CONDITIONS AND `nJ`' 3-31-� Bed 5/01/02 go STANDARDS IN EFFECT. 9�F �F /V11- \��Q�zzjwil�� Date : Z •� Z a4ECKED BY: B . Z DRAWING No.: 7 C A HAIDOOK I. AG RCE NO. 43293 HA �'8' 30 8 r_ITY FNr:INFFR R r (_ r%i i �0 nATF- i NOTES I. VALUES FOR A. B AND C SHALL BE SHOWN ON THE PROJECT DRAWINGS. ELEVATION R AND ELEVATION S SHALL BE SHOWN WHEN REQUIRED PER NOTE 8. 2. STATIONS SPECIFIED ON THE PROJECT DRAWINGS APPLY AT THE INTER- SECTION OF CENTER LINES OF MAIN LINE AND LATERALS. EXCEPT THAT STATIONS FOR CATCH BASIN CONNECTOR PIPES APPLY AT INSIDE WALL OF STRUCTURE. 3. REINFORCING STEEL SHALL CONFORM TO ASTM A 615M. GRADE 300, (ASTM A 615, GRADE 40), AND SHALL TERMINATE 40 mm (1 1/2') CLEAR OF CONCRETE SURFACE UNLESS OTHERWISE SHOWN. a. W BARS ARE OF SIZE AND SPACING SPECIFIED FOR WALL STEEL ON PROJECT DRAWINGS, AND SHALL BE CUT IN CENTER OF OPENING AND BENT INTO TOP AND BOTTOM OF JUNCTION STRUCTURE. b. OMIT H BARS WHEN SOFFIT OF SPUR IS 300 Frim (12') OR LESS BELOW SOFFIT OF MAIN LINE, AND OMIT G BARS WHEN INVERT OF SPUR IS 300 mm (12') OR LESS ABOVE FLOOR OF MAIN LINE. 4. JUNCTION STRUCTURE SHALL BE POURED MONOLITHICALLY WITH MAIN LINE. MANHOLE OR TRANSITION STRUCTURE. 5. FLOOR OF STRUCTURE SHALL BE STEEL -TROWELED TO THE SPRING LINE. 6. WHEN CONNECTING TO EXISTING RCB, BREAKOUT LIMITS AND DETAILS SHALL BE SHOWN ON THE PROJECT DRAWINGS. 7. EMBEDMENT, P. SHALL BE 130 mm (5') FOR 8 - 2400 mm (96') OR LESS 200 mm (8') FOR B OVER 2400 mm (961. S. IF ELEVATION R AND ELEVATION S ARE NOT SHOWN ON THE PROJECT DRAWINGS THEN THE INLET OPENING SHALL FALL 150 mm (61 BELOW THE SOFFIT OF THE MAIN LINE WITH THE INLET PIPE LAID ON A STRAIGHT GRADE FROM MAIN LINE TO CATCH BASIN OR TO GRADE BREAK 1N INLET LINE. ELEVATION S SHALL BE SHOWN ON THE PROJECT DRAWINGS IF THE INLET OPENING FALLS MORE THAN 130 mm (6') BELOW THE SOFFIT OF THE MAIN LINE WITH THE INLET PIPE LAID ON A STRAIGHT GRADE AS STATED ABOVE. ELEVATION R SHALL BE SHOWN ON THE PROJECT DRAWINGS ONLY WHEN A STUB IS TO BE PROVIDED FOR A FUTURE CONNECTION. 9. LATERALS OR CONNECTOR PIPES 600 mm (24') OR LESS IN DIAMETER SHALL BE NO MORE THAN 1.5m (51 ABOVE THE INVERT. LATERALS OR CONNECTOR PIPES 675 mm (27') OR LARGER IN DIAMETER SHALL BE NO MORE THAN 450 mm (18') ABOVE THE INVERT. WITH THE EXCEPTION THAT CATCH BASIN CONNECTOR PIPES LESS THAN 15 m (50') IN LENGTH SHALL NOT BE MORE THAN 1.5 m (51 ABOVE THE INVERT. 10. THE NEED FOR AN EDGE BEAM AND/OR ADDITIONAL REINFORCEMENT SHALL BE INVESTIGATED BY THE ENGINEER FOR ANY ONE OF THE FOLLOWING CONDITIONS= a. ANGLE A IS LESS THAN 300 b. TOP OF INLET PIPE IS LESS THAN 150 mm (61 BELOW THE SOFFIT c. FLOW LINE OF INLET PIPE IS LESS THAN 180 mm (71 ABOVE THE THE FLOOR OF THE RCB AT THE INSIDE FACE 11. DIMENSIONS SHOWN ON THIS PLAN FOR METRIC AND ENGLISH UNITS ARE NOT EXACT EQUAL VALUES. IF METRIC VALUES ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE METRIC VALUES, EXCEPT REINFORCING BARS SIZES IN ENGLISH UNITS MAY BE SUBSTITUTED FOR METRIC BAR SIZES. IF ENGLISH UNITS ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE ENGLISH UNITS. AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER STANDARD PLAN METRIC 333 - 1 JUNCTION STRUCTURE - PIPE TO RCB SHEET 2 OF 2 NOTES L -11-16 the difference In devatlen 11414 60 the Ou"Of POPS fled Iwo and "a normal putter graft ws wows "a" L For -T- wall "Ilckness, see Table A hetes. ]. was rewarding not roo&ed what nor is r or wee and the u,wl000rtw each or length Is r or Now. tN exceeding t)oee malts ahs be reinforced with 44 bre • 111"t centre paced Sys-oloar to wlelde of bol unless otherwise shoot 4, wast bettww rsMrcwg rot recuiredsee Staida Pion 074c for aternotwe reMorcod bottom and aternotive haat round bottom. S Steps -Nan rued where 'Iris Ices than Mr. 61ws 'Iris 3d' or more. Untag Naps with lovg west rIr abase the floor and highest ruwno not more then s- below top of wast. The distance, between atom "not *now It" and chs be uniform thral~ tet Union! of the waL Place step. M the waa without an so 8 Stop wuorte may, be Substituted for the bar step•. Stop a0at• Mss Goadly with State wndus I. No safety reoulrwma. See stand. -d Plan or4C for efep Mtawe. L DetaNe www, aspy to both meta and Collets obs. 7. rip" am be paced In any wag L Curb section Mss .latah ad)aoent orb 9. scoo n floors chs low woed trona ft*b and o wkd- Mope of Mai from as directions tows am! t Pbe. % gMwlrri g -s« Stanawd so.afiGNlenn or .Pegg trovwla» IL Cost -gun -SVCS or A alternative in options wlin aa»rostr. See StanOp-d Specifications, R Sat VW se that grate bars ore parallel to dr -tion M W*N*a Mrfece flow. IL Sed Stendord fawn OTTA and OTIS far Veto and +race oeteas ant welMnte at mdeMeneeus iron ww Ste" N. See maisics Plan 076 for gutter depression detoaa TABLE A CONCRETE QUANTITIES N -Y-0- to w -"T•6-1 w+t'i' to 20-0"IT•6-1 Addlflegl Additional Type w•r-o• PCC per Ff. "'r r PCC per ft. OCT) im Its acs CA 0.15 9.220 111 III 6-20 0.2ST 3.45 0.360 6-3 L03 0220 u) 1n 6.4' L2T 91' ST Lao Q360 124"1 @40 1" 0.237 LN O.No ail 6-5 Mot 0220 111 ( n Gi UM 111 wMowloa,w di dada, h ivii s• -o-. Taal boew an r"cor Mob. No deductions ore to be meft to those 4uGMlttee because of Pbe apeawgd.afforent floor 4"ernotIV" or afferent orb typed. • 9uantIflos for Type G-2 and w kosfa .geed an the wlwl== interior ddaelstorm Most STATE OF C"C MA DEFARTIENT OF TRANBPiIRTATID)1 DRAINAGE INLET NO SCALE