1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE 25. THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS CUPT17 1F IFOMPTANA
CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS SHALL BE APPROVED AT THE TIME OF CONSTRUCTION AND SHALL
AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONFORM TO THE CITY OF FONTANA STANDARD DETAILS.
CONSTRUCTION ("GREEN BOOK"). ALL REFERENCE SPECIFICATIONS
AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE 26. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE,
NOTED 15FTR T RHP"TmOV H HT PLANS
lk1CJ'g"wnd Se ice Ment
HE
Cat TOLL FREESHOULD CONSTRUCTION OF NOT COMMENCE WITHIN TWOTYEARSQUIRED EOF THE DA VEFENTS
APPROVAL SHOWN HEREON AND CARRIED FORTH IN A
1-8W DILIGENT MANNER THE CITY ENGINEER MAY REQUIRE
REVISIONS TO THE PLANS TO BRING THEM INTO
227-2600 CONFORMANCE WITH CONDITIONS AND STANDARDS
IN EFFECT.
TWO WORKING DAYS BEFORE YOU DIG
PLANS PREPARED FOR:
OWNER/DEVELOPER/APPLICANT
BCA DEVELOPMENT
ATTN: BEN ANDERSON
17780 FITCH STREET
SUITE 120
IRVINE, CA 92614
(949) 863-1055 - FAX (949) 863-0065
No.
I I'l •� c I
':[I@] 104
N(Ge
n6n(ED7
NOe
1161167
T FUJU
INDEX MAP
SCALE: 1"=100' PROPOSED
42' R/W
32' ., .. 10'
20' 2' 10' 12'
5' 1' 2' 8' 7.25'
COLD JOINT 24
22 25
---------------
-- 2.00%
:.:
12 8" CONC
21 6"95% COMPACTED
CRUSHED AGGREGATE BASE in It
12" MIN. 95% COMPACTED
NATIVE SUBGRADE
EXISTING IMPROVEMENTS PER CITY DWG.
NO. 1880 BRIDLEPATH DRIVE -BUS BAY
STA 31+16.75 TO 31+67.26
NTS
R/W
5' 64'
PUE 32'
I
I
12' 20'
I
4' VARIES VARIES
0.5% MIN
O
I 2% o
----�.------LEVEL.---
11 .
_ Q
RECORD DOCUMENT
r
4.75'
4" SIDEWALK
CURB ONLY
6" C. F.
COLD JOINT
EXISTING IMPROVEMENTS PER
CITY DWG. NO. 1880 R/W I
I
5' I
I
32' PUE
I
20' 12'
I
VARIES VARIES 4'
0.5% MIN
I
27-
LINE
%LINE
r.l
These Record Documents have been prepared BRIDLEPATH DRIVE -0.9 RIW
based on information provided by others. The STA 29+50.94 TO STA 35+42.%
Design Professional has not verified the accuracy T.I.-5.5
and/or completeness of this information and shall
not be responsible for any errors or omissions NTS
w h may be incorporated herein as a result
z BASIS OF BEARINGS
DATE THE BASIS OF BEARINGS FOR THIS MAP WAS TAKEN
FROM THE CENTERLINE OF BRIDLEPATH DRIVE BEING
NORTH 18'00'00" EAST, AS SHOWN ON TRACT 13750,
M.B.250/48-66, RECORDS OF SAN BERNARDINO COUNTY.
REVISIONS Engineer CityBENCHMARK
ADDroval Date: ADDroval Date:
FWE 43 - R.R. SPIKE IN E.P. BY
PP#1536663E S'LY SIDE OF BASELINE
220'± E'LY OF CHERRY AVE.
ELEVATK)N= 1313.04
LEGEND
COLOR AND FINISH TO MATCH EXISTING CONCRETE.
2.
WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT
27.
THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF
•�� •
DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO
CATCH BASIN
THE CURB AT THE LOCATION OF THE SEWER LATERAL.
FIRE HYDRANT
PRECEDENCE PROVISIONS IN THE "GREEN BOOK", THE CONTRACTOR
�_IF
PROPOSED STREET LIGHT
SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER
28.
NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING
EACH
FOR RESOLUTION.
CONSTRUCTION NOTE REFERENCE NUMBER
STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED.
3.
ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE
29.
ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND
LINEAL FEET
CITY ENGINEER.
EXISTING ELEVATION/EXISTING GRADE
APPROVED PRIOR TO PAVING OF STREETS.
4.
CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF
30.
APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT
TRACT BOUNDARY
FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING
POINT OF INTERSECTION
PAVEMENT PRIOR TO PLACEMENT.
MATCHLINE
DIVISION PRIOR TO THE START OF ANY WORK.
POINT OF REVERSE CURVATURE
-SD-
STORM DRAIN
INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO
31.
PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT
WATER MAIN
WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC
BEGIN CURB RETURN
TO REVISION AND APPROVAL OF THE CITY ENGINEER AS DETERMINED
SEWER MAIN
RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610.
END CURB RETURN
BY SOILS TESTS TAKEN AFTER COMPLETION OF ROUGH GRADING.
5.
THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL
32.
ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE MATERIAL
RIGHT OF WAY
POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF
END CURVE
FOR STRUCTURAL STREET SECTIONS SHALL BE RECOMMENDED BY A
PUBLIC UTILITY EASEMENT
CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC
BEGIN VERTICAL CURVE
GEOTECHNICAL REPORT AND SUBMITTED TO THE CITY OF FONTANA
GRADE BREAK
EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER.
END VERTICAL CURVE
FOR APPROVAL UPON COMPLETION OF ROUGH GRADING.
6.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN
33.
ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES
FINISHED SURFACE
BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES.
POINT OF COMPOUND VERTICAL CURVATURE
SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR
FINISHED GRADE
PRVC
POINT OF REVERSE VERTICAL CURVATURE
UPON COMPLETION OF PAVING.
7.
THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION
GRADE IN
OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH
34.
UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE
FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY.
ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC
CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER.
8.
THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5)
FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE
35.
CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING,
GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS
SPRINKLERS AND SIDEWALKS AFFECTED BY THE CONSTRUCTION
OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA.
TO THE SATISFACTION OF THE CITY ENGINEER.
TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN
THE POTENTIAL FOR GROUND MOVEMENT EXISTS.
36.
AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO
THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS
9.
NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC
TO THE CITY ENGINEER.
RIGHT-OF-WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR
THAT PURPOSE.
CITY OF F WMA, LMM NOTFICATiON LIST
10.
THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM
CITY OF FONTANA PACIFIC BELL CO.
AVAILABLE INFORMATION. HOWEVER, IT SHALL BE THE RESPONSIBILITY
ATTN: CARLOS NAVARRO ATTN: VIRGINIA BECKER
OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE
8353 SIERRA AVENUE 3939 E. CORONADO STREET
LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO
FONTANA, CA. 92335 ANAHEIM, CA. 92807
EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE
(909) 350-6632 (714) 666-5467
CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT
1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION.
SO. CALIF. GAS COMPANY UNDERGROUND SERVICE ALERT
ATTN: DENNIS FREEMAN (800) 227-2600
11.
THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL
1981 W. LUGONIA AVENUE
UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS,
REDLANDS, CA. 92374 COMCAST ( CABLE TV )
TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING,
(909) 335-7547 ATTN: JACK HAYES
LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER,
EMERGENCIES: (800) 427-2200 1205 DUPONT AVE.
STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY
ONTARIO, CA. 91761
COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO
SO. CALIF. EDISON COMPANY (909) 390-4738
WORK AROUND THEIR FACILITIES.
300 N. PEPPER AVENUE
RIALTO, CA. 92376 GENERAL TELEPHONE COMPANY
12.
THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER
909820-5598 - UNDERGROUND ATTN: STEVE HOCK
MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION.
909 875-5100 - TRANSMISSION 1400 E. PHILIPS BLVD.
CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER
213 637-1233 - PIPELINES ONTARIO, CA. 91766
COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS.
909 357-6223 - DISTRIBUTION (800) 422-4133
800 422-4133
13.
CURVE DATA REFERS TO THE FACE OF CURB.
FONTANA WATER COMPANY
CRAWFORD CANYON MUTUAL WATER CO. ATTN: MICHAEL J. McGRAW
14.
STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT
ATTN: BILL VANDERKIEFT, JR. 8440 NUEVO AVENUE
WHERE OTHERWISE NOTED.
(619) 868-6040 FONTANA CA. 92235
(909) 822-2201
15.
ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE
FAX: (909) 823-5046
ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK
TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE
R/W R/W
FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION
i
5'
5'
CONTROL STAKING DURING CONSTRUCTION.
PUE
27' 27'
PUE
16.
THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS,
MONUMENT TIES OR BENCHMARKS WITHOUT PRIOR NOTIFICATION TO
1
6'
20' I 20'
6'
1'
THE CITY ENGINEER.
5.5'
5.5'
17.
REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING
SURVEY MONUMENTS, MONUMENT TIES AND BENCHMARKS, SHALL BE DONE
i
O
BY A REGISTERED CML ENGINEER OR LICENSED LAND SURVEYOR.
I
27
--'
o
2%
SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF
-----2�-----LEYEL_ _____URE-__- %-
THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL
NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO
THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER
REPLACEMENT OF THE MONUMENT.
DECOY LANE
18.
THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS
STA 10+00.00 TO 10+90.71
AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL
LOCAL STREET -54' RAW
BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR
RESIDENTS AND EMERGENCY VEHICLES.
TJLZ&5
NTS
19.
THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE
MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT
ALL TIMES.
i R/W R/W
20.
ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED
I 5'
5
S'
WIND VELOCITIES EXCEED 25 MILES PER HOUR.
; PUE
I
25'
25'
PUE
�
21.
THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD,
i
7'
18' I 18'
7'
SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY
ADJACENT TO THE RIGHT-OF-WAY DURING CONSTRUCTION WITHOUT
i it
6'
6'
it
PRIOR WRITTEN APPROVALi
5.5'
0
5.5'
22.
NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL
;
2q,
0
2%
OF THE CITY INSPECTOR.
'-i
LEVEL
LINE
Y
O
.
23.
A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION.
FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE
'
RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED
DENSITY IS OBTAINED.
BISON LANE STA 10+00.00 TO 16+24.86
24.
CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES
RACCOON WAY STA 10+00.00 TO 13+50.00
FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE
DECOY LANE STA 10+90.71 TO 16+45.14
SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODABLE
ARCHERY COURT AND WILDLIFE COURT
SWALES ENTERING OR LEAVING IMPROVEMENTS.
LOCAL STREET -50' R/W
T.L=5.5
NTS
lk1CJ'g"wnd Se ice Ment
HE
Cat TOLL FREESHOULD CONSTRUCTION OF NOT COMMENCE WITHIN TWOTYEARSQUIRED EOF THE DA VEFENTS
APPROVAL SHOWN HEREON AND CARRIED FORTH IN A
1-8W DILIGENT MANNER THE CITY ENGINEER MAY REQUIRE
REVISIONS TO THE PLANS TO BRING THEM INTO
227-2600 CONFORMANCE WITH CONDITIONS AND STANDARDS
IN EFFECT.
TWO WORKING DAYS BEFORE YOU DIG
PLANS PREPARED FOR:
OWNER/DEVELOPER/APPLICANT
BCA DEVELOPMENT
ATTN: BEN ANDERSON
17780 FITCH STREET
SUITE 120
IRVINE, CA 92614
(949) 863-1055 - FAX (949) 863-0065
No.
I I'l •� c I
':[I@] 104
N(Ge
n6n(ED7
NOe
1161167
T FUJU
INDEX MAP
SCALE: 1"=100' PROPOSED
42' R/W
32' ., .. 10'
20' 2' 10' 12'
5' 1' 2' 8' 7.25'
COLD JOINT 24
22 25
---------------
-- 2.00%
:.:
12 8" CONC
21 6"95% COMPACTED
CRUSHED AGGREGATE BASE in It
12" MIN. 95% COMPACTED
NATIVE SUBGRADE
EXISTING IMPROVEMENTS PER CITY DWG.
NO. 1880 BRIDLEPATH DRIVE -BUS BAY
STA 31+16.75 TO 31+67.26
NTS
R/W
5' 64'
PUE 32'
I
I
12' 20'
I
4' VARIES VARIES
0.5% MIN
O
I 2% o
----�.------LEVEL.---
11 .
_ Q
RECORD DOCUMENT
r
4.75'
4" SIDEWALK
CURB ONLY
6" C. F.
COLD JOINT
EXISTING IMPROVEMENTS PER
CITY DWG. NO. 1880 R/W I
I
5' I
I
32' PUE
I
20' 12'
I
VARIES VARIES 4'
0.5% MIN
I
27-
LINE
%LINE
r.l
These Record Documents have been prepared BRIDLEPATH DRIVE -0.9 RIW
based on information provided by others. The STA 29+50.94 TO STA 35+42.%
Design Professional has not verified the accuracy T.I.-5.5
and/or completeness of this information and shall
not be responsible for any errors or omissions NTS
w h may be incorporated herein as a result
z BASIS OF BEARINGS
DATE THE BASIS OF BEARINGS FOR THIS MAP WAS TAKEN
FROM THE CENTERLINE OF BRIDLEPATH DRIVE BEING
NORTH 18'00'00" EAST, AS SHOWN ON TRACT 13750,
M.B.250/48-66, RECORDS OF SAN BERNARDINO COUNTY.
REVISIONS Engineer CityBENCHMARK
ADDroval Date: ADDroval Date:
FWE 43 - R.R. SPIKE IN E.P. BY
PP#1536663E S'LY SIDE OF BASELINE
220'± E'LY OF CHERRY AVE.
ELEVATK)N= 1313.04
PROJECT
LOCATION
SWE ROUE 210
OR
SLOU AVE/ A" SLAW AVE
VICINITY MAP
N.T.S.
FWMA
LEGEND
Ak
EXISTING FIRE HYDRANT
LOC
lap - 4w
•�� •
CB
CATCH BASIN
Ak
FIRE HYDRANT
HP
�_IF
PROPOSED STREET LIGHT
PROJECT
LOCATION
SWE ROUE 210
OR
SLOU AVE/ A" SLAW AVE
VICINITY MAP
N.T.S.
FWMA
® SIDEWALK REMOVAL
11 1 PROPOSED A.C. PAVEMENT
CONSTRUCTION NOTES ESTIMATE OF QUANTITIES
TR 16167-1 TR 16167 TOTAL
la -CONSTRUCT 4" AC PAVEMENT (Min) OVER 12" OF 95% COMPACTED NATIVE
(SEE GENERAL NOTES 31 & 32) 38,184 SF 27,291 SF 65,475 SF
2 CONSTRUCT 6" PCC CURB AND GUTTER PER CITY STD. DWG. NO. 1003 2,111 LF 888 LF 2,999 LF
3 CONSTRUCT PCC CROSS GUTTER AND SPANDREL PER CITY STD. DWG. NO. 104, W=8' - 874 SF 1,540 SF 2,414 SF
4 CONSTRUCT PCC DRIVE APPROACH PER CITY STD. DWG. 102, W=16'
UNLESS NOTED OTHERWISE 4,323 SF 2,321 SF 6,644 SF
5 CONSTRUCT 4" PCC SIDEWALK PER CITY STD. DWG. NO. 1015 ,WIDTH AS SHOWN ON PLANS_ 8,175 SF 5,516 SF 13,691 SF
6 CONSTRUCT CURB RETURN ACCESS RAMP PER CITY STD. DWG. NO. 1006 2 EA 6 EA 8 EA
7 ADJUST MANHOLE FRAME & COVER TO GRADE PER CITY STD. 109 6 EA 5 EA 11 EA
8 INSTALL STOP SIGN PER CITY STD. DWG. NO. 139 1 EA 1 EA 2 EA
9 INSTALL STREET SIGN PER CITY STD. DWG. NO. 139 3 EA 3 EA 6 EA
10 INSTALL STREET LIGHT PER CITY OF FONTANA DWG. NO. 3094
(TO BE INSTALLED BY TR. 16167 & TR. 16167-1) 7EA 6 EA 13 EA
12 SAW -CUT & REMOVE EXISTING A.C. PAVEMENT (SEE DETAIL "A" ON SHEET NO. 5 FOR
INTERSECTION TREATMENT AND SECTION "A -A" ON SHT. NO. 6 FOR TREATMENT AT BUS BAY) 92 SF 144 SF 236 SF
V1413 ONSTRUCT CATCH BASIN PER STORM DRAIN PLAN, CITY DWG. NO. 3093 3 EA 0 EA 3 EA
CONSTRUCT LOCAL DEPRESSION PER A.P.W.A. STD. NO. 313-1, AS SHOWN ON SHEET 8
(CASE AS SHOWN ON PLAN) 3 EA 0 EA 3 EA
16 REMOVE AND RELOCATE STREET LIGHT PER STREET LIGHT PLAN DWG NO. 3094 1 EA 1 EA 2 EA
17 SAW -CUT & REMOVE EXISTING CURB AND GUTTER
(SEE DETAIL "A",SECTION "B" -"B" ON SHEET NO. 5) 92 LF 92 LF 184 LF
N20E
SAW-CUT & REMOVE EXISTING SIDEWALK 368 SF 721 SF 1089 SF
CONSTRUCT PCC CURB (ONLY) 8" CF TO 6" CF PER CITY STD. DWG. NO. 1003 89 LF 144 LF 233 LF
CONSTRUCT 4.5" AC PAVEMENT (MIN.) OVER 12" OF 95% COMPACTED NATIVE
g2 SF 144 SF 236 SF
(SEE GENERAL NOTES 31 & 32)
22 GRIND AND REMOVE EXISTING A.C. PAVEMENT AND OVERLAY WITH NEW SEAL COAT PER 460 SF 712 SF 1172 SF
SECTION "A -A" ON SHEET NO. 6 AND/OR SECTION "B -B" ON SHT. NO. 5 AS APPLICABLE _
24 RECONSTRUCT BUS BAY PER CITY STD. DWG. NO 1014
(SEE CONCRETE PAVEMENT JOINT DETAIL ON SHEET NO. 6) - SF 300 SF 300 SF
25 REMOVE BUS BAY GUTTER PER LIMITS SHOWN ON PLAN - LF 300 LF 300 LF
Prepared By: ESS'0 CITY OF FONTANA, CALIFORNIA
ALLARD ENGINEERING QR°F
"A
Civil Engineering - Land Surveying - Iand Planning 1P STREET IMPROVEMENT PLANS
6253 Sierra Avenue m Drawn By: TRACT NO. 16167 Scale:
Fontana, California 92335 i,r No. 43976 m WF AS SHOWN
9 ) 5s-1 15 Fax (909) 356-1795 � Exp. 6/30/05 TRACT NO. 16167-1
* * Designed By: Date:
Z-7-03 .1 CiV i` .P sF T TLE SHEET- FEB. 2003
David S. Hammer, A.C. 43976 DATE OF CALF F Ch ked B �p �� Dwg. No. 1
(expires 6/30/2005) SH Approved:
60CITY ENGINEER R.C.E. 51152 3 8
File: L:\DWG\13402\Streets\16167\Sht-1.DWG
LEGEND
Ak
EXISTING FIRE HYDRANT
LOC
LENGTH ON CURVE
EXISTING STREET LIGHT
CB
CATCH BASIN
Ak
FIRE HYDRANT
HP
HIGH POINT
PROPOSED STREET LIGHT
O
CURVE DATA REFERENCE LETTER
EA
EACH
10
CONSTRUCTION NOTE REFERENCE NUMBER
SF
SQUARE FEET
LP
LOW POINT
LF
LINEAL FEET
( )
EXISTING ELEVATION/EXISTING GRADE
- - -
CENTER LINE
TAN
TANGENT GRADE
TRACT BOUNDARY
PI
POINT OF INTERSECTION
MATCHLINE
PRC
POINT OF REVERSE CURVATURE
-SD-
STORM DRAIN
MOC
MIDDLE OF CURVE
W
WATER MAIN
BCR
BEGIN CURB RETURN
S
SEWER MAIN
ECR
END CURB RETURN
®
AC PAVEMENT REMOVAL
BC
BEGIN CURVE
R/W
RIGHT OF WAY
EC
END CURVE
PUE
PUBLIC UTILITY EASEMENT
BVC
BEGIN VERTICAL CURVE
GB
GRADE BREAK
EVC
END VERTICAL CURVE
TC
TOP OF CURB
MOVC
MIDDLE OF VERTICAL CURVE
FS
FINISHED SURFACE
PCVC
POINT OF COMPOUND VERTICAL CURVATURE
FG
FINISHED GRADE
PRVC
POINT OF REVERSE VERTICAL CURVATURE
INV
INVERT
G1
GRADE IN
G2
GRADE OUT
® SIDEWALK REMOVAL
11 1 PROPOSED A.C. PAVEMENT
CONSTRUCTION NOTES ESTIMATE OF QUANTITIES
TR 16167-1 TR 16167 TOTAL
la -CONSTRUCT 4" AC PAVEMENT (Min) OVER 12" OF 95% COMPACTED NATIVE
(SEE GENERAL NOTES 31 & 32) 38,184 SF 27,291 SF 65,475 SF
2 CONSTRUCT 6" PCC CURB AND GUTTER PER CITY STD. DWG. NO. 1003 2,111 LF 888 LF 2,999 LF
3 CONSTRUCT PCC CROSS GUTTER AND SPANDREL PER CITY STD. DWG. NO. 104, W=8' - 874 SF 1,540 SF 2,414 SF
4 CONSTRUCT PCC DRIVE APPROACH PER CITY STD. DWG. 102, W=16'
UNLESS NOTED OTHERWISE 4,323 SF 2,321 SF 6,644 SF
5 CONSTRUCT 4" PCC SIDEWALK PER CITY STD. DWG. NO. 1015 ,WIDTH AS SHOWN ON PLANS_ 8,175 SF 5,516 SF 13,691 SF
6 CONSTRUCT CURB RETURN ACCESS RAMP PER CITY STD. DWG. NO. 1006 2 EA 6 EA 8 EA
7 ADJUST MANHOLE FRAME & COVER TO GRADE PER CITY STD. 109 6 EA 5 EA 11 EA
8 INSTALL STOP SIGN PER CITY STD. DWG. NO. 139 1 EA 1 EA 2 EA
9 INSTALL STREET SIGN PER CITY STD. DWG. NO. 139 3 EA 3 EA 6 EA
10 INSTALL STREET LIGHT PER CITY OF FONTANA DWG. NO. 3094
(TO BE INSTALLED BY TR. 16167 & TR. 16167-1) 7EA 6 EA 13 EA
12 SAW -CUT & REMOVE EXISTING A.C. PAVEMENT (SEE DETAIL "A" ON SHEET NO. 5 FOR
INTERSECTION TREATMENT AND SECTION "A -A" ON SHT. NO. 6 FOR TREATMENT AT BUS BAY) 92 SF 144 SF 236 SF
V1413 ONSTRUCT CATCH BASIN PER STORM DRAIN PLAN, CITY DWG. NO. 3093 3 EA 0 EA 3 EA
CONSTRUCT LOCAL DEPRESSION PER A.P.W.A. STD. NO. 313-1, AS SHOWN ON SHEET 8
(CASE AS SHOWN ON PLAN) 3 EA 0 EA 3 EA
16 REMOVE AND RELOCATE STREET LIGHT PER STREET LIGHT PLAN DWG NO. 3094 1 EA 1 EA 2 EA
17 SAW -CUT & REMOVE EXISTING CURB AND GUTTER
(SEE DETAIL "A",SECTION "B" -"B" ON SHEET NO. 5) 92 LF 92 LF 184 LF
N20E
SAW-CUT & REMOVE EXISTING SIDEWALK 368 SF 721 SF 1089 SF
CONSTRUCT PCC CURB (ONLY) 8" CF TO 6" CF PER CITY STD. DWG. NO. 1003 89 LF 144 LF 233 LF
CONSTRUCT 4.5" AC PAVEMENT (MIN.) OVER 12" OF 95% COMPACTED NATIVE
g2 SF 144 SF 236 SF
(SEE GENERAL NOTES 31 & 32)
22 GRIND AND REMOVE EXISTING A.C. PAVEMENT AND OVERLAY WITH NEW SEAL COAT PER 460 SF 712 SF 1172 SF
SECTION "A -A" ON SHEET NO. 6 AND/OR SECTION "B -B" ON SHT. NO. 5 AS APPLICABLE _
24 RECONSTRUCT BUS BAY PER CITY STD. DWG. NO 1014
(SEE CONCRETE PAVEMENT JOINT DETAIL ON SHEET NO. 6) - SF 300 SF 300 SF
25 REMOVE BUS BAY GUTTER PER LIMITS SHOWN ON PLAN - LF 300 LF 300 LF
Prepared By: ESS'0 CITY OF FONTANA, CALIFORNIA
ALLARD ENGINEERING QR°F
"A
Civil Engineering - Land Surveying - Iand Planning 1P STREET IMPROVEMENT PLANS
6253 Sierra Avenue m Drawn By: TRACT NO. 16167 Scale:
Fontana, California 92335 i,r No. 43976 m WF AS SHOWN
9 ) 5s-1 15 Fax (909) 356-1795 � Exp. 6/30/05 TRACT NO. 16167-1
* * Designed By: Date:
Z-7-03 .1 CiV i` .P sF T TLE SHEET- FEB. 2003
David S. Hammer, A.C. 43976 DATE OF CALF F Ch ked B �p �� Dwg. No. 1
(expires 6/30/2005) SH Approved:
60CITY ENGINEER R.C.E. 51152 3 8