HomeMy WebLinkAbout3086-1GENERAL NOTES 1 ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK'). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED. 2 WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK", THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION. 3 ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER. 4 ADVANCE CONSTRUCTION SIGNING INDICATING DURATION OF PROJECT SHALL BE IN PLACE ONE WEEK PRIOR TO IMPLEMENTING DETOURS. 5 CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT—OF—WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610. 6 THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON—METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER. 7 IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES. 8 THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY. 9 THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT. 10 NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE. 11 THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION. 12 THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES. 13 THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS. 14 STATIONING REFERS TO THE CENTERLINE OF STORM DRAIN EXCEPT WHERE OTHERWISE NOTED. 15 ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION. 16 THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER. 17 REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT. 18 THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES. 19 THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES. 20 THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL. 21 NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR. 22 A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE—WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED. 23 CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON—ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS. 24 ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING CONCRETE. 25 NO OPEN TRENCH SHALL BE ALLOWED AT THE END OF THE DAY WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER. 26 PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL EXPOSE EXISTING FACILITIES, AND VERIFY ELEVATION AND LOCATION OF CONNECTIONS. CITY APPROVAL OF CONNECTIONS TO EXISTING FACILITIES DOES NOT IMPLY CORRECTNESS OF ELEVATIONS OR LOCATIONS SHOWN ON THE PLANS. 27 IF EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE PROPOSED IMPROVEMENTS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND ALL AFFECTED AGENCIES IMMEDIATELY. 28 NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED. 29 ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS. 30 APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT. 31 ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON COMPLETION OF PAVING. 32 UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL .RESTORE _ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER. 33 AS—BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE- ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER. 34 MINIMUM D—LOAD FOR STORM DRAIN PIPE IS 1350. ilmCORD DRAW �z THF -SE RECORD DRAWINGS HAVE BEEN PPS'; :` 3,<`<L € AR 0" TI•IE BASIS OF INFOPOATION P IWI!"', -, EY OTHERS. THE ENGINEER N k L c 3PONSIBLE FOR ANY ERRORS OR OMISSI, , WAVE SEN INCORPORATED INTOTHE DOCOW ` t r-eS!jLT TliFRFOR SEE %ff. 2 PRIVATE ENGINEER'S NOTICE TO CONTRACTORS: THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITIES OR STRUCTURES SHOWN ON THESE PLANS ARE OBTAINED BY A SEARCH OF AVAILABLE RECORDS; TO THE BEST OF OUR KNOWLEDGE, THERE ARE NO EXISTING UTILITIES EXCEPT THOSE SHOWN ON THESE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES SHOWN ON THESE DRAWINGS. THE CONTRACTOR FURTHER ASSUMES ALL LIABILITY AND RESPONSIBILITY FOR THE UTILITY PIPES, CONDUITS OR STRUCTURES SHOWN OR NOT SHOWN ON THESE DRAWINGS. THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR THE JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT; INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AND SHALL REPORT ALL DISCREPANCIES TO THE ENGINEER PRIOR TO THE COMMENCEMENT OF WORK. O Q e DIAL TWO WORKING BEFORE DAYS BEFORE YOU DIG YOU DIG TOLL FREE 1-800-227-2600 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT INDEX MAP NOT TO SCALE CITY OF FONTANA UTILITY NOTIFICATION CITY OF FONTANA LIST PACIFIC BELL CO. ATTN: CARLOS NAVARRO ATTN: VIRGINIA BECKER 8353 SIERRA AVENUE 3939 E.CORONADO STREET FONTANA, CA 92335 ANAHEIM, CA 92807 (909) 350-6632 (714) 666-5467 SO. CALIFORNIA GAS COMPANY COMCAST (CABLE TV) ATTN. ALAN KESELOFF ATTN: JACK HAYES 16231 VALLEY BLVD. 1205 DUPONT AVENUE FONTANA, FONTANA, CA. 92335 ONTARIO, CA. 91761 (909) 335-7781 (909) 390-4736 EXT. 3055 EMERGENCIES: (800) 427-2200 REMOVE EXISTING 56" ROP. SO. CALIFORNIA EDISON COMPANY 90-- ATTN: JAIME AMESZCUA I EA . (909) 357-6581 7951 REDWOOD AVENUE FONTANA, CA. 92335 (909) 820-5598 UNDERGROUND (909) 820-5137 TRANSM15SIONS (213) 637-1233 PIPELINES (909) 357-6589 DISTRIBUTION (800) 227-2600 CRAWFORD CANYON MUTUAL WATER CO. FONTANA WATER COMPANY ATTN: BILL VANDERKIEFT, JR. ATTN: AL KROHN (619) 868-6040 8440 NUEVO AVENUE FONTANA, CA 92335 UNDERGROUND SERVICE ALERT (909) 822-2201 EXT. 323 (800) 227-2600 FAX. (909) 823-5046 SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND STANDARDS IN EFFECT. GRANULAR BEDDING FROM SELECTED TRENCH 51M — MATERIAL (I" MAX. SIZE). 5/4:1 SLOPE OR GREATER OR ADEQUATE SHORING cIO% COMPACTED NATIVE BACKFILL 3" MAX. SIZE • . u, j♦II ` STORM DRAIN PIPE VICINITY MAP NOT TO SCALE GRANULAR BEDDING FROM SELECTED TRENCH 51DE MATERIAL FOR PIRE 10' OR GREATER IN DEPTH USE 1/2 CRUSHED STONE BEDDING. TRENCH DETAIL NOT TO SCALE NOTES: I. TRENCH WIDTH SHALL BE CONTROLLED TO TOP OF PIPE ZONE. 2. TRENCH DEPTHS OF GREATER THAN 5' SHALL HAVE ADEQUATE 5HORING. 5. CLASS II AGGBASE ALL TRENCHES LESS THAN 100' IN LENGTH. NOTE: COMPACTION SHALL BE 010% IN ALL ZONES UNLESS OTHERWISE SPECIFIED. TRENCH STABILITY SHALL CONFORM TO CAL—OSHA REQUIREMENTS. GON5TRUGTION NOTES QUANTITIES 0_INSTALL 18" ROP — D LOAD PER PROFILE. 41 LF 2 INSTALL 24" ROP — D LOAD PER PROFILE. 265 LF 33 INSTALL 56" ROP — D LOAD PER PROFILE. 16.'15 LF CONSTRUCT TRANSITION STRUCTURE PER APAA STD 540-1 (ON SHEETS). I LF CONSTRUCT CONCRETE COLLAR PER APWA STD 380-2 (ON SHEET 3). 1 EA 6 JOIN EXISTING CATCH BASIN. I EA O—JOIN EXISTING MANHOLE. 2 EA REMOVE EXISTING 56" ROP. 4 LF 90-- REMOVE EXISTING MANHOLE. I EA . BENCH 1 MK.' No. 615 OF BEAMM RAILROAD SPIKE AT INTERSECTION FS.,B.M. EARING OF N89'30'06"E ALONG OF CITRUS AVE. AND LOS CECROS o. UNE OF SEC. 30, T.1 N.,R.5W.. AVE., IN POWER POLE NO. 9011E PER R.S. 58/5, WAS USED AS ON THE EAST SIDE OF CITRUS AVE. ASIS OF BEARINGS FOR THIS SIERRA LAKES SPECIFIC PLAN B "ATIM 1467.59 Prepared Under The Supervision Of : CITY OF FONTANA, CALIFORNIA PREPARED THE OFFICOF MADO EA DIASSOCIAT SE INC. STORM DRAIN IMPROVEMENT PLANS 10601 CHURCH STREET, SM 107 DRAWN BY: SHO �,"�; ;, MM M,R,A, TRACT No. 161'75 s� SHOWN �/ m L E.R F. TIT SHEET APRIL. 2002 I � O T— CHECKED 81� Y- DRAWING NO.: I A.T. `" ., CI ENGINEER R.C.E. 51152 ! 3086 3 J:\826-1176\StormDrain\sd01.DWG, 04/25/2002 04:26:08 F