Loading...
HomeMy WebLinkAbout3045-1CITY OF FONTANA GENERAL NOTES 1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK"). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED. 2. WHEN A TECHNICAL CONFUCT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK," THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFUCT TO THE CITY ENGINEER FOR RESOLUTION. 3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER. 4. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, EI INEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBUC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610. 5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DEUNEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES. 7. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY. & THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE (MOUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CAUFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR (MOUND MOVEMENT. 9. NO MATERIAL OR EQL""T SHALL BE STORED IN THE PUBUC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE. 10. THE LOCATIONS OF UTIUTIES SHOWN HAVE BEEN DET94 NNED FROM AVAILABLE INFORMATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND EL.EVATKIN OF MY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION. 11. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL ANO CALTRANS. ALL UTWTY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACIUTIES. 12. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS. 13. CURVE DATA REFERS TO THE FACE OF CURB. 14. STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE NOTED. 15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION. 16. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER. 17. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL. ENGINEER OR UCENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABUSHED FOR LATER REPLACEMENT OF THE MONUMENT. 18. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE MAINTAIINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES. 19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES. 20. ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES EXCEED 25 MILES PER HOUR. 21. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL 22. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR. 23. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE WORK UNTE THE SPECIFIED DENSITY IS OBTAINED. 24. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMIING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABI E SWALES ENTERING OR LEAVING IMPROVEMENTS. 0 0 DIAL TWO WORKING BEFORE DAYS BEFORE YOU DIG YOU DIG TOLL FREE 1-800-227-2600 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT CITY OF FONTANA GENERAL NOTES (CONT'D) 25. THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE APPROVED AT THE TIME OF CONSTRUCTION AND SHALL CONFORM TO THE CITY OF FONTANA STANDARD DETAILS. 26. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING CONCRETE. 27. THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE SEWER LATERAL 28. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED. 29. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS. 30. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT. 31. PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND APPROVAL OF THE CITY ENGINEER AS DETERMINED BY SOILS TESTS TAKEN AFTER COMPLETION OF ROUGH GRADING. 32. ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE MATERIAL FOR STRUCTURAL STREET SECTIONS SHALL BE RECOMMENDED BY A GEOTECHNICAL REPORT AND SUBMITTED TO THE CITY OF FONTANA FOR APPROVAL UPON COMPLETION OF ROUGH GRADING. 33. ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON COMPLETION OF PAVING. 34. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER. 35. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER. 36. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER. PRIVATE ENGINEER'S NOTICE TO CONTRACTORS THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE UI ITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE AGENCY AND THE ENGINEER HARMLESS FROM ANY AND ALL UABILTY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGUGENCE OF THE AGENCY OR THE ENGINEER. UNDERGROUND LTTIIJITIES & STRUCTURES THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITIES OR STRUCTURES SHOWN IN THESE PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOVM_EDGE, THERE ARE NO EXISTING UTILITIES EXCEPT THOSE SHOW ON THESE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE ALL PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOWN, AND IS RESPONSIBLE FOR THE PROTECTION OF, AND ANY DAMAGE TO THESE UNES OR STRUCTURES. "CAUTION: THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS." BASIS OF BEARINGS: THE BASIS OF BEARINGS FOR THIS DRAWING IS THE LINE BETWEEN THE NW COR. SEC. 25, R6W, T1 N (PT. 61) AND THE NORTHERLY QUARTER COR. OF SAID SEC. 25 (PT 84). SAID BEARING IS N89'44'05'E AS SHOWN ON RS 30/58-60. BENCH MARK: THE BENCH MARK FOR THIS PROJECT IS CALTRANS BM I8-17. IT IS DESCRIBED AS A BRASS CAP IN THE CONCRETE BASE OF THE SOUTH LEG OF AN SCE TOWER 343' NORTH OF HIGHLAND, 0.2 MI WEST OF SAN SEVAINE RD., 2.65 MI WEST OF SIERRA AVE. ELEVATION IS 1428.609 FEET. BACK OF WALK U � � W F.H., ST. LIGHT -cc us SIGN, MISC. CURB FACE GUTTER UP 31DEWALIC JOG DETAL NM SCALE 10-C REV REVISION DESCR1P1101 REca�o pee,vr�� A •IT TRACT N0. 15844 IY: R/W R/W 50' 54' 1 7' 18' / 20' CL 18' / 20' 7' s' O 113' a +0.03' _ TC (50' R/V 6' 5' O 20 CL -0.01 = TC (SW R/W) 5' PUEI ? Oz 2.0% I 2.0% 10% I PUE I L 6" CONC CURB6" CONC _J CONC & GUTTER OO CURB & GUTTER CONC SIDEWALK@ O SIDEWALK 50' RW CANVASBACK WAY, NIA11AW LME & GADWALL WAY 54' RW WOOD DUCK STREET, PIVTAL WAY, REDHEAD WAY & BRANT DRIVE (STA 9+998 to X67.47) NTS 71 = 5.5 R/W R/W 22' 1 2.0% r 6" CONC CURB CONC & GUTTER 2 SIDEWALK@ CL 58' RW ROSS WAY NM &5 1 22' 7' 1 CL -0.05' _ 7C 6' - [ 5' 2.0%IPUE 2.0% �r� I 6" CONC CURB & GUTTER CONC @ SIDEWALK DAZE ENGR. CITY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT 2704 %A6 COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND STANDARDS IN EFFECT. STREET CONSTRUCTION NOTES do QUANTITIES ffEw I DESM11I N Off. 1 CONST 4" MIN AC OVER 12" OF 95% COMPACTED NATIVE (SEE GENERAL NOTES 31 & 32) 145,731 SF 2 CONST 6" CURB AND GUTTER PER CITY STD PLAN No 1003 7,630 LF 3 CONST 4.5" MIN AC OVER 12" OF 95% COMPACTED NATIVE (SEE GENERAL NOTES 31 & 32) 10,106 SF 4 CONST RESIDENTIAL DRIVEWAY APPROACH (16' MAX) PER CITY STD No 102 104 EA 5 CONST 4" THICK PCC SIDEWALK PER CITY STD PLAN No 1015 48,142 SF 6 CONST CURB RETURN ACCESS RAMP PER CITY STD PLAN No 1006 10 EA 7 INSTALL STREET LIGHT 5800 LUMEN PER CITY STD No 1016 (SCE#7) 18 EA 8 CONST INLET LOCAL DEPRESSION PER CITY STD PLAN No 121 (W=PER PLAN) 8 EA 9 CONST 8' WIDE CROSS GUTTER PER CITY STD No 105 2,547 SF 10 REMOVE EXISTING BARRICADE 3 EA 11 CONST CURB OPENING CATCH BASIN PER APWA STD PLAN No 300-2 (W=PER PLAN)* 8 EA ATTN: STEVE HOOK * SEE SHEET 5 i CITY OF FONTANA UTILITY NOTIFICATION LIST I CITY OF FONTANA PACIFIC BELL COMPANY 8353 SIERRA AVE 3939 E CORONADO ST FONTANA, CA 92335 ANAHEIM, CA 92807 ATTN: CARLOS NAVARRO (714) 666-5500 (909) 350-6632 ATTN: LARRY SIGNAIGO j SOUTHERN CAUFORNIA GAS COMPANY COMCAST (CABLE TV P.O. BOX 3003, SC8031 1205 DUPONT AVE REDLANDS, CA 92373-0306 ONTARIO, CA 91761 ATTN: RICKEY REYES (909) 390-4777 x3055 J (909) 335-7508 ATTN: JACK HAYES (909) 335 7527 (FAX) of EMERGENCIES: (800) 427-2200 WIDGEON WAY & REDHEAD WAY o ONTANA c� SOUTHERN CAUFORNIA EDISON COMPANY I GENERAL TELEPHONE COMPANY 7951 REDWOOD AVE 1400 E PHILLIPS BLVD FONTANA, CA 92335 ONTARIO, CA 91766 ATTN: JAIME AMESZCULA (800) 422-4133 (909) 357-6581 ATTN: STEVE HOOK (909) 820-5598 UNDERGROUND !rwte (909) 820-5137 TRANSMISSIONS FONTANA WATER COMPANY I (213) 637-1233 PIPELINES 8440 NUEVO AVE (909) 357-6589 DISTRIBUTION FONTANA, CA 92335 () 422-4133 (909) 822-2201 WIDTH (909) 823-5046 FAX I ATTN: AL KROHN LY V SAN GABRIEL VALLEY WATER CO. w 11142 GAREY AVE. EL MONTE, CA. 91733 6" CONC �OQ�DI:ESS/0 2 TMtllt 450.00 CURB & GUTTERCONC �Q P.O. BOX 6010 INDICATES PROPOSED ELEVATION EL MONTE, CA. 91734-2010 r (626)448-6183 EXT. 252 ATTN: LUIS MONTENEGRO R�W 72, 5' 1 CL 8'_ 1 6' 1 22' I 22' _ 1 _6' _ 1 8' I 1 8' 6, 5' PUEI ? 0% I I L_ /ESSlQRpF �i\ ���CO �SHUR "'C �'L DO�� Q om No. 31681 Z � * Exp. 12/31/04/* k�e CI VI's �� � CA1.�F�/ 2.0% "--6" CONC CURB CONC & GUTTER O SIDEWALKO R/W CL -mow = 7C1 5c LEGEND 2.PUE BC BEGIN CURVE OX BVC BEGIN VERTICAL CURVE 2.0% BCR BEGIN CURVE RADIUS 1 _ J CB CATCH BASIN CL CENTERUNE 6" CONC & GUTTER EC END CURVE CONC ® SIDEWALK ECR END CURVE RADIUS EL TZ' RW Y EASTERLY WDCfON WAY EP EDGE OF PAVEMENT EVC END VERTICAL CURVE NM FL FLOW UNE 71 = 6.5 FS FINISHED SURFACE CL 22' -I- 2.0% - r 6" CONC CURB CONC & GUTTER 0 SIDEWALK O 1 GB GRADE BREAK INDEX OF SHEETS SHEET DESCRIPTION 1 of 6 TITLE SHEET 2 of 6 WOOD DUCK STREET 3 of 6 BRANT DRIVE 4 of 6 PINTAIL WAY & MALLARD LANE 15 7) of 6 WIDGEON WAY & REDHEAD WAY o ONTANA c� SUMMIT AVE 6 ROSS WAY, CANVASBACK WAY & GADWALL WAY SUMMIT AVE SL STREET UGHT 1 W 0 N 51 STA STATION !rwte P I PUE `� REC_o2D DRPW 1 N�16(i x TOP OF CURB n w w ceU W WIDTH I LY V WESTERLY VERTICAL DEPTH w a INDICATES EXISTING ELEVATION 6" CONC �OQ�DI:ESS/0 2 TMtllt 450.00 CURB & GUTTERCONC �Q INDICATES PROPOSED ELEVATION a9� @SIDEWALK r WATER UNE a SIE PARKWAY4KES N Uj = W a\ m x`,>: PROJECT 1 SITE HIGHLAND AVE COUNTY OF SAN BERNARDINO CL 8'_ 1 6' 1 22' I 22' _ 1 _6' _ 1 8' I 1 8' 6, 5' PUEI ? 0% I I L_ /ESSlQRpF �i\ ���CO �SHUR "'C �'L DO�� Q om No. 31681 Z � * Exp. 12/31/04/* k�e CI VI's �� � CA1.�F�/ 2.0% "--6" CONC CURB CONC & GUTTER O SIDEWALKO R/W CL -mow = 7C1 5c LEGEND 2.PUE BC BEGIN CURVE OX BVC BEGIN VERTICAL CURVE 2.0% BCR BEGIN CURVE RADIUS 1 _ J CB CATCH BASIN CL CENTERUNE 6" CONC & GUTTER EC END CURVE CONC ® SIDEWALK ECR END CURVE RADIUS EL TZ' RW Y EASTERLY WDCfON WAY EP EDGE OF PAVEMENT EVC END VERTICAL CURVE NM FL FLOW UNE 71 = 6.5 FS FINISHED SURFACE CL 22' -I- 2.0% - r 6" CONC CURB CONC & GUTTER 0 SIDEWALK O 1 GB GRADE BREAK INDEX OF SHEETS SHEET DESCRIPTION 1 of 6 TITLE SHEET 2 of 6 WOOD DUCK STREET 3 of 6 BRANT DRIVE 4 of 6 PINTAIL WAY & MALLARD LANE 5 of 6 WIDGEON WAY & REDHEAD WAY 6 of 6 ROSS WAY, CANVASBACK WAY & GADWALL WAY CL 8'_ 1 6' 1 22' I 22' _ 1 _6' _ 1 8' I 1 8' 6, 5' PUEI ? 0% I I L_ /ESSlQRpF �i\ ���CO �SHUR "'C �'L DO�� Q om No. 31681 Z � * Exp. 12/31/04/* k�e CI VI's �� � CA1.�F�/ 2.0% "--6" CONC CURB CONC & GUTTER O SIDEWALKO R/W CL -mow = 7C1 5c LEGEND 2.PUE BC BEGIN CURVE OX BVC BEGIN VERTICAL CURVE 2.0% BCR BEGIN CURVE RADIUS 1 _ J CB CATCH BASIN CL CENTERUNE 6" CONC & GUTTER EC END CURVE CONC ® SIDEWALK ECR END CURVE RADIUS EL TZ' RW Y EASTERLY WDCfON WAY EP EDGE OF PAVEMENT EVC END VERTICAL CURVE NM FL FLOW UNE 71 = 6.5 FS FINISHED SURFACE CL 22' -I- 2.0% - r 6" CONC CURB CONC & GUTTER 0 SIDEWALK O 1 GB GRADE BREAK 0 0_0 HP HIGH POINT R/W INT INTERSECTION LP LOW POINT 0 MVC MIDDLE OF VERTICAL CURVE y Y PCC POINT OF COMPOUND CURVE 22' 7' 1 PRC POINT OF REVERSE CURVE 11 R/W RIGHT OF WAY CL -0.05' = TC 6' SL STREET UGHT 1 W 0 N 51 STA STATION !rwte % I PUE `� REC_o2D DRPW 1 N�16(i TC TOP OF CURB 2.OX W WIDTH I LY V WESTERLY VERTICAL DEPTH INDICATES EXISTING ELEVATION 6" CONC �OQ�DI:ESS/0 2 TMtllt 450.00 CURB & GUTTERCONC �Q INDICATES PROPOSED ELEVATION a9� @SIDEWALK W WATER UNE 66 RW No. 3166 S SEWER UNE D�/E I Exp. kg31 SD STORM DRAIN UNE BRANTC, %I LL LOT UNE (STA 8+10.97 to 9*9M) ��glFOF AUF�OC ON CURB C N 6.5 H HEIGHT ❑❑ ❑� CITY O� FONTANA, CALFORNIA rye Inc.IT HEnHTS N 1:11:117 A Civil Engineering •Planning • Surveying Public Works AWN BY: sT K93ROVBuENT PLM13 1152 N. Mountain Ave. Ste. 100 • Upland, CA 91786-3669.909-982-7777 MSM PREPARED UNDER THE SUPERVISION OF: BY: TffM `T A _ / / MSM TRACT NO. 16844 ( ` MAA) co Z MECKM BY BY: HAROLD A. GARCELON R.C.E. 31681 DATE: RLB 7/S�C Z TE: �/y/� 0 0_0 00 0 y Y NONE I M 00-4- !w a; 11-9-01 �� o No.: 1 W 0 N !rwte N %3 R V C>