Loading...
HomeMy WebLinkAbout3038-2W 39 CURVE TABLE W 151 123 CURVE ANGLE LENGTH RADIUS TANGENT A 11'46'25" 214.74' 1045.00' 107.75' B 91856" 169.90' 1045.00' 85.14' C 1 44'49'29" 17.60' 22.50 9.28' LATERAL TABLE LAT BEARING DISTANCE "A" N3314'40"E 24.91' "B" N63'07'18"E 40.78' 37 36 i i 141 BUCHANAN LANE 1543.5 44N W 151 123 M co co '"_ • • Lo co co N 11 C> M "no �N ,011 ��NLA + +pp � ♦+pp r 35 34 33 N • �N�� F-NDOM N !R" + II N m 4 N m U v3 U Rw, 1546.0 B S 1 CONSTRUCTION NOTES ROOSEVELT 1 CONSTRUCT 36 DIA RCP, D -LOAD PER PROFILE a— CONSTRUCT 18" DIA RCP, D -LOAD PER PROFILE 3O- CONSTRUCT CATCH BASIN PER STREET IMPROVEMENT PLAN. 4� CONSTRUCT JUNCTION STRUCTURE -PIPE TO PIPE PER APWA STD 331-2. SEE DETAIL ON SHT 3. 5a- CONSTRUCT MANHOLE -PIPE TO PIPE PER APWA STD 320-1. SEE DETAIL ON SHT 3. CONSTRUCT CONCRETE COLLAR FOR PIPE PER APWA STD J380-2. SEE DETAIL ON SHT 3. 7� CONSTRUCT 24" DIA RCP, D -LOAD PER PROFILE A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT J��%JJ1 oQN � 30 N O Go 31 r 8_2z J 54'17'18"W 1 _ S SLAT A„ W th O O W 151 123 '"_ '_ —00 C> 1544.5 RW� Z C%q o .�cz F; N 142 �^ 3 v3 n � 1546.0 5 COOLIDGE CT. U CONSTRUCTION NOTES ROOSEVELT 1 CONSTRUCT 36 DIA RCP, D -LOAD PER PROFILE a— CONSTRUCT 18" DIA RCP, D -LOAD PER PROFILE 3O- CONSTRUCT CATCH BASIN PER STREET IMPROVEMENT PLAN. 4� CONSTRUCT JUNCTION STRUCTURE -PIPE TO PIPE PER APWA STD 331-2. SEE DETAIL ON SHT 3. 5a- CONSTRUCT MANHOLE -PIPE TO PIPE PER APWA STD 320-1. SEE DETAIL ON SHT 3. CONSTRUCT CONCRETE COLLAR FOR PIPE PER APWA STD J380-2. SEE DETAIL ON SHT 3. 7� CONSTRUCT 24" DIA RCP, D -LOAD PER PROFILE A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT J��%JJ1 oQN � 30 N O Go 31 r 8_2z J 54'17'18"W 1 _ S SLAT A„ W th O O DR. (LIME "C") LEGEND 0 AT BC BEGINNING OF CURVE CB CATCH BASIN CL CENTERLINE DIA DIAMETER EC END OF CURVE ESMT EASEMENT EX EXISTING FG FINISHED GROUND ELEVATION FL FLOW UNE ELEVATION FS FINISHED SURFACE ELEVATION GB GRADE BREAK H HEIGHT INV INVERT JS JUNCTION STRUCTURE LAT LATERAL LF LINEAL FEET LT LEFT MH MANHOLE NTS NOT TO SCALE 1480.0 PAD ELEVATION POINT OF COMPOUND CURVE PRC POINT OF REVERSE CURVE RCP REINFORCED CONCRETE PIPE n /� RS RIG T K9L'OZD C)�A W SD STORM DRAIN SHT SHEET V 3 ST STREET QA ?.�Z 710 ¢� ST 10+00 STREET STATION QO co STD STANDARD & ,��� N TC TOP OF CURB Z j° o' CD TS TRANSITION JUNCTION STRUCTURE w 01681 W WATER l Zj31 o� 40 0 40 80+�' ` Q, 1 = 40 scale feet l9TFOF CAI�F���` REV. REVISION DESCRIPTION DATE ENGR. MY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT � RF-C.oQD C>2.AW1M6 12-0q NG COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND STANDARDS IN EFFECT. /Q�OFESS/p \ NUR �� z Y, = No. 31681 Z m * Exp. 12/31/0 �. \Clvl\- lF OF CALF 013E317T-Td%1reman Inc. ❑OGS' Civil Engineering •Planning •Surveying •Public Works 1152 N. Mountain Ave. Ste. 100 • Upland, CA 91786-3669.909-982-7777 PREPARED UNDER THE SUPERVISION OF: HAROLD A. GARCELON R.C.E. 31681 DATE: CITY OF FONTANA, CALIFORNIA SUMMIT HEIGHTS 11 NN BY: STOM DRAM IMPROVEMENT PLANS MADS/MFP WCW GNED BY - MADS TWT NO, =41-1 ACED BY: GI C/R 614?16 t ITY ENGINEER R.C.E. 51152 DATE: a v 0 1'=40" 00 TE: 12-07-01 G NO.:co 2 0 co 3038 3 CD 0 0 0 66 N 0 0 r 151 123 � g C> 1544.5 S U C.> N �^ 3 v3 DR. (LIME "C") LEGEND 0 AT BC BEGINNING OF CURVE CB CATCH BASIN CL CENTERLINE DIA DIAMETER EC END OF CURVE ESMT EASEMENT EX EXISTING FG FINISHED GROUND ELEVATION FL FLOW UNE ELEVATION FS FINISHED SURFACE ELEVATION GB GRADE BREAK H HEIGHT INV INVERT JS JUNCTION STRUCTURE LAT LATERAL LF LINEAL FEET LT LEFT MH MANHOLE NTS NOT TO SCALE 1480.0 PAD ELEVATION POINT OF COMPOUND CURVE PRC POINT OF REVERSE CURVE RCP REINFORCED CONCRETE PIPE n /� RS RIG T K9L'OZD C)�A W SD STORM DRAIN SHT SHEET V 3 ST STREET QA ?.�Z 710 ¢� ST 10+00 STREET STATION QO co STD STANDARD & ,��� N TC TOP OF CURB Z j° o' CD TS TRANSITION JUNCTION STRUCTURE w 01681 W WATER l Zj31 o� 40 0 40 80+�' ` Q, 1 = 40 scale feet l9TFOF CAI�F���` REV. REVISION DESCRIPTION DATE ENGR. MY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT � RF-C.oQD C>2.AW1M6 12-0q NG COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND STANDARDS IN EFFECT. /Q�OFESS/p \ NUR �� z Y, = No. 31681 Z m * Exp. 12/31/0 �. \Clvl\- lF OF CALF 013E317T-Td%1reman Inc. ❑OGS' Civil Engineering •Planning •Surveying •Public Works 1152 N. Mountain Ave. Ste. 100 • Upland, CA 91786-3669.909-982-7777 PREPARED UNDER THE SUPERVISION OF: HAROLD A. GARCELON R.C.E. 31681 DATE: CITY OF FONTANA, CALIFORNIA SUMMIT HEIGHTS 11 NN BY: STOM DRAM IMPROVEMENT PLANS MADS/MFP WCW GNED BY - MADS TWT NO, =41-1 ACED BY: GI C/R 614?16 t ITY ENGINEER R.C.E. 51152 DATE: a v 0 1'=40" 00 TE: 12-07-01 G NO.:co 2 0 co 3038 3 CD 0 0 0 66 N 0 0