Loading...
HomeMy WebLinkAbout3033-13CONSTRUCTION NOTES 0 0 00 C4 1� CONST 6 1/2" AC PAVEMENT (MIN OVER 12" COMPACTED NATIVE MATERIAL (SEE GENERAL NOTES 31 do 32)b 22 CONST 8" CURB do GUTTER PER CITY STD PLAN NO. 1003 33 CONST 8" CURB PER CITY STD PLAN NO. 1003 4a— CONST 8" TO 6" CURB & GUTTER TRANSITION PER CITY STD PLAN NO. 1003 55 CONST 4" PCC SIDEWALK PER CITY STD PLAN NO. 1015 6 CONST CURB RETURN ACCESS RAMP PER CITY OF FONTANA STD PLAN NO. 1006 77 INSTALL STREET LIGHT 22,000 LUMEN PER CITY STD PLAN NO. 1016 (SCE #20) 88 CONST CURB OPENING CATCH BASIN PER APWA STD PLAN NO. 300-2 (W=PER PLAN) 99 CONST LOCAL DEPRESSION PER CITY STD PLAN NO. 121 (W=PER PLAN) 12 SAWCUT do REMOVE EXISTING PAVEMENT= 15 RELOCATE STREET LIGHT AND POWER POLE. 16 RELOCATE POWER POLE. 22 SIERRA LAKES JOIN PER DETAIL ON SHEET 2 23 INSTALL 4" AND 6" IRRIGATION SLEEVE 024 4CONST 6 1/2" AC PAVEMENT (1' VIDE) 26 CONST BARRICADE PER CITY STD 118 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT CL INT 20+19.25 IMPROVEMENT PLANS J J \-r--X� J J 'J � J J`_J`J r�- J 1 Tlr1r T 1\1J, J CREEKXEROAD SIERRA LAKES PARKWAY REV. I REVISION DESCRIPTION I DATE ENGR. CITY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND STANDARDS IN EFFECT. /QROFESS/phi\ �O �HUR om = No. 31681 Z � * Exp. 12/31 /04 \sJ CIVly �\Q lF OF Cmt���/ CL INT 23+18.26 SIERRA LAKES PARKWAY BC BVC BCR CB CL EC ECR EL'Y EP EVC FL FS GB HP INT BEGIN CURVE CURVE TABLE BEGIN VERTICAL CURVE MVC CURVE ANGLE LENGTH RADIUS TANGENT A 7'07'30" 39.92 321.00 19.98 B 180'00'00" 6.28 2.00 - C 8979'54" 54.57 35.00 34.59 D 90.40'06" 55.39 35.00 35.41 E 120'00'00' 4.19 2.00 3.46 F 101'24'35" 26.55 15.00 18.33 G 41 *24'35ml 18.07 25.00 9.45 N 180'00'00" 1 6.281 2.00 - CONSTRUCTION NOTES 0 0 00 C4 1� CONST 6 1/2" AC PAVEMENT (MIN OVER 12" COMPACTED NATIVE MATERIAL (SEE GENERAL NOTES 31 do 32)b 22 CONST 8" CURB do GUTTER PER CITY STD PLAN NO. 1003 33 CONST 8" CURB PER CITY STD PLAN NO. 1003 4a— CONST 8" TO 6" CURB & GUTTER TRANSITION PER CITY STD PLAN NO. 1003 55 CONST 4" PCC SIDEWALK PER CITY STD PLAN NO. 1015 6 CONST CURB RETURN ACCESS RAMP PER CITY OF FONTANA STD PLAN NO. 1006 77 INSTALL STREET LIGHT 22,000 LUMEN PER CITY STD PLAN NO. 1016 (SCE #20) 88 CONST CURB OPENING CATCH BASIN PER APWA STD PLAN NO. 300-2 (W=PER PLAN) 99 CONST LOCAL DEPRESSION PER CITY STD PLAN NO. 121 (W=PER PLAN) 12 SAWCUT do REMOVE EXISTING PAVEMENT= 15 RELOCATE STREET LIGHT AND POWER POLE. 16 RELOCATE POWER POLE. 22 SIERRA LAKES JOIN PER DETAIL ON SHEET 2 23 INSTALL 4" AND 6" IRRIGATION SLEEVE 024 4CONST 6 1/2" AC PAVEMENT (1' VIDE) 26 CONST BARRICADE PER CITY STD 118 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT CL INT 20+19.25 IMPROVEMENT PLANS J J \-r--X� J J 'J � J J`_J`J r�- J 1 Tlr1r T 1\1J, J CREEKXEROAD SIERRA LAKES PARKWAY REV. I REVISION DESCRIPTION I DATE ENGR. CITY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND STANDARDS IN EFFECT. /QROFESS/phi\ �O �HUR om = No. 31681 Z � * Exp. 12/31 /04 \sJ CIVly �\Q lF OF Cmt���/ CL INT 23+18.26 SIERRA LAKES PARKWAY BC BVC BCR CB CL EC ECR EL'Y EP EVC FL FS GB HP INT BEGIN CURVE LP LOW POINT BEGIN VERTICAL CURVE MVC MIDDLE OF VERTICAL CURVE BEGIN CURVE RADIUS PCC POINT OF COMPOUND CURVE CATCH BASIN PRC POINT OF REVERSE CURVE CENTERLINE R/W RIGHT OF WAY END CURVE SL STREET LIGHT END CURVE RADIUS TC TOP OF CURB EASTERLY W LY WESTERLY EDGE OF PAVEMENT V VERTICAL DEPTH END VERTICAL CURVE (45000) INDICATES EXISTING ELEVATION FLOW LINE 450.00 INDICATES PROPOSED ELEVATI( FINISHED SURFACE W WATER UNE GRADE BREAK S SEWER LINE HIGH POINT SD STORM DRAIN UNE INTERSECTION = - NEW PAVEMENT - SAWCUT do REMOVE EXISTING PAVEMENT Ri�Ca RD DRcatuwU M Q�oFessm QUO pgtHtlR�' Cz LLJ No. 316811 Cr � Er;.LN V IL%�116�1 � 9lf OF C �j 3�a�o� GUTTER LINE DETAIL "A" —CB #16A NTS 40 0 40 80 1 "= 40' scale feet 1100PTY m Inc.-ncan�SUMMIT a, s , HEIGHTS I CL -- Nto N ap LOLO _0 AWN BY: MsM N 00 M PREPARED UNDER THE S PERVISION OF: 4 O %� O 2 L lV �%�tit HAROLD A. GARCELON R.C.E. 31681 DATE: Oa] (50 w U')V U, � � moo~ o~ v 3i Q� o 0 �: "= ,Lri rn------- rn 10-26-01 0 G NO.: + o I NC> N I N DETAIL "A" —CB #16A NTS 40 0 40 80 1 "= 40' scale feet 1100PTY m Inc.-ncan�SUMMIT OF FONTANA, CALIFORNIA HEIGHTS I CL -- R "A Civil Engineering - Planning - Surveying - Public Works 1152 N. Mountain Ave. Ste. 100 - Upland, CA 91786-3669.909-982-7777 _0 AWN BY: MsM STREET &MovauET PLANS SERRA LAKES PARKWAY SIGNED BY: MSM PREPARED UNDER THE S PERVISION OF: 4 O %� O 2 L lV �%�tit HAROLD A. GARCELON R.C.E. 31681 DATE: FROM #800' ELY OF BEECH AVE - TOL FV. CHECKED BY: arOVE1 RDC CAIlIAICCD D !- C cf 47 nATC. 3 0 i 00 000 2 0 CL -- _0 a� CY O C o Y Q� o 0 �: "= 1 40' c TE- 10-26-01 CDo �N G NO.: 13 N O 3/�/1/� ■V�W� 0 14