Loading...
HomeMy WebLinkAbout3029-12L N I 3 3' 18" MIN. (TYP.) 2 OC 4'-10" L I I I I (2) #5 HORIZONTAL 3» CLEAR I FROM SIGN SEAT I 3 8 / I I F.G I • • ♦ • • ° •� •♦ d .. d. • ' • d \' .• j 24 . '19 ;0 • ..d 24 • •a •_24 cv 4 2" BEYOND 5 5 5 5 7 (TYP.) SECTION 'BB' SECTION 'AA' O1 PRE–CAST CONCRETE CAP 4'-10" 3' _ O 2 PRE–CAST SIGN WALLip O3 FORMED CONCRETE CONSTRUCTION W/ RIVERROCK STONE VENEER (ALL EXP. SURFACES)–TO MATCH CITY STD. USE BRICK TIES 0_ 12" MAX. VERT & O PROVIDE 3'-6" WIDE x 12" THICK 16" O.C. CONCRETE FOOTING HORIZONTAL FOR 7 VENEER TO 1 2" O #5 VERTICAL REBAR CONCRETE ELEVATION SIGN PANEL GROUT POCKET FOOTING BY OTHERS INSTALLATION NOTES: 1. CAST—IN OR CORE DRILL (9) 3"DIA. x 22"DEEP GROUT POCKETS INTO FOOTING PER ANCHOR BOLT PATTERN. (SEE PUN BELOW) 2. TAKE (9) 3/4 -DIA. x 23"L COIL RODS AND THREAD 5" INTO (9) 3/4"DIA. COIL INSERTS, LEAVING 18" OF THE COIL ROD EXPOSED. 3. FILL ALL GROUT POCKETS W/ NON—SHRINK GROUT AND POUR EPDXY ON THE FOOTING WHERE SIGN WILL BE PLACED. INSERT SIGN W/ COIL RODS INTO GROUT POCKETS. 4. SUGGESTED ANCHORING METHOD NOT CALCULATED. PLEASE CONSULT STRUCTURAL ENGINEER. 5. FOOTING A: INSTALLATION BY OTHERS. �9:1X•134WLei ZW_CIDIM R&iLl4W_1>iIs] a�•i':I_l��»:�•31<i" T 18" 12-(TYP) 3/4"DIA. COIL ROD W/NUT EPDXY 4 dd d 'd v d 3 d. a7. SEE BELOW FOR CONNECTION OF v 0 USE BRICK TIES 0 a SIGN TO h ° •I O 12" MAX. VERT & 04–STEEL MONUMENT WALL I • I O 16" O.C. (2) #4 REBAR IN TOP COURSE CONT. HINGES (2 PER GATE) ° I A HORIZONTAL FOR •� IN FOOTING O9 #4 HORIZONTAL REBAR 0 24" O.C. VENEER TO \ CLEAR ° . I : •� W CONCRETE T01 REINFORCE j I 1 1/2 -CLEAR #4 HORIZONTAL • . °. • TO REINFORCE 12„ O.C. U 116" 2 1/2 23 1 /4"O.C. 69 1 /2"C.C. BORDE S (2)3/4"DIA. COIL INSERTS W/1/2" SPACERS FOR LIFTING TO BE — PATCHED IN FIELD BY OTHERS (9)3/4 -DIA. COIL INSERTS FOR ( w_\/ ANCHORING SIGN IN PLACE 10"O.C. 12-(TYP) ELEVATION VIEW 1"L. REBAR WELDED TO ROD 10" w R 36" BACKGROUND INSET: 1/4" SIDE VIEW #4 HORIZONTAL 12" O.C. REAR FRONT I F- i REAR FRONT 10" 1 I I F.G. io d a ~ 10na. 10; d 3"CLEAR (TYP.) 3'-6" SECTION'AA' A. �. #4 VERT 16 O.C. •I • . < A' 1d. (8) #4 a dll i (g) #4 HORIZONTAL CONT. 10 1� a d HORIZONTAL CONT. •d • ' 3 -CLEAR (TYP.) 4 3'-6” SECTION'BB' 18'-0" O 6"X8" CONCRETE CURB O STEEL CHANNEL W 1/2" DIA. ANCHOR .. ; • 3 PERIMETER CURB. SLAB SEE BELOW FOR CONNECTION OF d .I 0 USE BRICK TIES 0 TO MATCH SPLIT FACE BLOCK SIGN TO h ° •I O 12" MAX. VERT & 04–STEEL MONUMENT WALL I • I O 16" O.C. (2) #4 REBAR IN TOP COURSE CONT. HINGES (2 PER GATE) ° I #4 VERT 16" O.C. HORIZONTAL FOR •� IN FOOTING O9 #4 HORIZONTAL REBAR 0 24" O.C. VENEER TO \ CLEAR ° . I : •� W CONCRETE T01 REINFORCE j I 1 1/2 -CLEAR #4 HORIZONTAL • . °. • TO REINFORCE 12„ O.C. U » F.G. io d a ~ 10na. 10; d 3"CLEAR (TYP.) 3'-6" SECTION'AA' A. �. #4 VERT 16 O.C. •I • . < A' 1d. (8) #4 a dll i (g) #4 HORIZONTAL CONT. 10 1� a d HORIZONTAL CONT. •d • ' 3 -CLEAR (TYP.) 4 3'-6” SECTION'BB' 18'-0" PARK SIGN WALL 0 I 30 O1 O 6"X8" CONCRETE CURB O STEEL CHANNEL W 1/2" DIA. ANCHOR ELEVATION VIEW PERIMETER CURB. SLAB BOLTS 024" O.C. O3 0 SPLIT FACE CONCRETE BLOCK WALLS TO MATCH SPLIT FACE BLOCK 04 (3) #4 REBAR CONT. O TO MATCH BUILDING 04–STEEL GATES W/ HEAVY DUTY STEEL O6 O REINFORCED CONCRETE SLAB PER (2) #4 REBAR IN TOP COURSE CONT. HINGES (2 PER GATE) #4 VERT. REBAR 0 16" O.C.; O•as SOIL REPORT •� IN FOOTING PARK SIGN WALL 0 I 30 O1 Bx8x16 SPLIT FACE (OUT SIDE DATE 1/14/02 ONLY)0 O CONCRETE SLAB W/ INTEGRAL PERIMETER CURB. SLAB THICKNESS PER SOILS REPORT O3 10x2x 16 PRECISION CAP, COLOR TO MATCH SPLIT FACE BLOCK 04 (3) #4 REBAR CONT. O COMPACTED SUBGRADE PER SOILS REPORT O6 CONC. FOOTING (TYP.) O7 (2) #4 REBAR IN TOP COURSE CONT. OS #4 VERT. REBAR 0 16" O.C.; O•as CENTERED IN BLOCK; ALT. BENDS •� IN FOOTING O9 #4 HORIZONTAL REBAR 0 24" O.C. FIN. GR. TRASH ENCLOSURE (SECTION) a NOTE: USE (2) #5 VERT. REBAR 0 EACH WALL CORNER & AT ALL ENDS (SPACE REBAR 0 1 1/2" APART.) O 6"X6" CONCRETE CURB O SPLIT FACE CONCRETE BLOCK WALLS TO MATCH BUILDING 0 2"x2"x14 GA. SQUARE STEEL GATE FRAME W/ CROSS SUPPORT SECURE SOLID SHEET 18 GA. STEEL COVER NOTE: 1) PROVIDE ONE THROW LATCH AND ONE 1/2" DIA. CANE BOLT FOR EACH PAIR OF GATES. 2) ALL STEEL TO BE GALVANIZED AND PAINTED FOREST GREEN PER SPECIFICATIONS. 3) PROVIDE SHOP DRAWINGS PER SPECIFICATIONS. n TRASH ENCLOSURE (GATE) VNJ N TRASH ENCLOSURE (PLAN VIEW) MATERIALS A. Concrete blocks shall be lightweight aggregate units, Grade B, ASTM C 90. B. Concrete shall be Portland cement, conforming to the current editions of the ASTM standard specifications for Portland cement -designation C-150, Type I or Type II. C. Cured concrete shall attain minimum comprehensive strength of 2,500 p.s.i. at 28 days. Finish of formed surfaces shall be smooth and free of abrasions. D. All steel, flats and bars shall conform to ASTM A-36. Bolts shall conform to ASTM A307. All bolts shall be standard machine bolts with steel washers. E. Reinforcing steel shall be deformed bars conforming to ASTM A 615-68, grade 40. Deformations shall conform to ASTM A305. F. Galvanizing shall conform to ASTM designation A 123 and A 153, as applicable. G. Zinc -oxide primer conforming to Federal Specifications TT-P641b. Standard brand zinc -dust. H. Wire fabric shall conform to ASTM A 185. Fabric to be 6" x 6" x #10 x #10. I. Tie wire shall be fully annealed, copper -bearing steel wire, 16 gauge minimum. J. Paint shall be Sherman Williams, Sinclair, Tnemec, Dunn -Edwards or approved equal. Color to be selected by the City of Fontana. EXECUTION A. Trash enclosures shall be constructed as shown on drawings prepared by Sitescapes, Inc., 19762 MacArthur Blvd., Suite 130, Irvine, CA 92762, (949) 644-9370 B. Contractor shall submit four (4) copies of complete shop drawings, for the steel gates indicating types of hinges and connections, welds, types of finishes, etc. for review by the City and Landscape Architect prior to start of construction. C. All exposed steel materials shall be hot -dipped galvanized after having been subjected to preparation and cleaning. Galvanizing shall be done after fabrication and assembly and in the largest practical units. Drain well and finish so that completed galvanized items are smooth and free from projections, barbs and icicles. D. All materials and items not encased, embedded in or cast against concrete or masonry shall be shop primed and painted after cleaning, using the specified primers and paint. Apply shop paint evenly by spray to uniformly coat all surfaces, into joints and comers with a minimum wet fihn thickness of 1.5 mils. E. After installation or erection, provide field touch-up to adequately cover all abrasions, scratches, damage areas and weld areas after slogging and removal of burned or blistered paint. Surfaces shall be properly cleaned prior to touch-up. Coat all bolt heads, nuts washers and other connectors. Touch-up primer shall be the specified shop paint. F. Contractor shall submit two (2) paint chip color samples. The contractor shall submit one (1) sample of the concrete block to be used on the project. The samples shall be reviewed by the City and Landscape Architect prior to construction. G. Lay all concrete block units in running bond pattern. Joints shall be 3/8". All cells shall be solid grouted. Install reinforcing bars in conformance with the drawings. Finish surfaces shall be clean and free from marring or staining of any nature, joints shall be true, even, tight and uniform in color. vANDSCAPF 16 P 0(b,� 4f 2782am '9l aft � F of CA���� CITY OF FONTANA LANDSCAPE PLANS BMW" By, SOCCER PARK SULD AS SHOWN IM RUCTI TAILS "AT CHEO= IM ��/-Otvwmm112 C,a� = 3029 39 $ I T E C A P E Landscape Architecture and Planning 19762 MacArthur Blvd., Ste. 130 Irvine, CA. 92612 Richard Polhamus, Uc.ns. CA -J2782 (949) 644-9370 (949) 476-1432 FAX N0. REVISION 00 U NION W / -" Z 7 P 0 W U CL rN � V Z w o ro V 1 F� 1—I cc ZLU F-1 H Z O Q 0 �--� 0 Z U 3 c 0 O V DVM CHK DATE 1/14/02 JOB # 01-017 C=7 of 39 00 C� O•as � •� l W 000 U O Z Z V 1 F� 1—I cc ZLU F-1 H Z O Q 0 �--� 0 Z U 3 c 0 O V DVM CHK DATE 1/14/02 JOB # 01-017 C=7 of 39