Loading...
HomeMy WebLinkAbout2985-1ARCHIT[RRA Anchor Bolt Int. Integral A. C. Asphaltic Concrete J. Box DESIGN GROUP Adjacent Jts. Joints Alt. Alternate L. A. LANDSCAPE ARCHITECTURAL CONSTRUCTION DOCUMENTS FOR 54'r AMORE HILLPe IFI PLAN I CITY REQUIRED NOTES: INSPECTIONS: 1 • It is the Landscape Contractors responsibility to contact the Engineering Division's Landscape Inspector 48 hours prior to desired inspection of an item at (909) 350-6633. 2 Prior to release of utilities or maintenance period commencement, the following inspections are required: 3. Pre -Construction Meeting Inspection of irrigation system in open trench condition (prior to backfill). Mainline pressure test ® 150 P.S.I. for a three (3) hour continuous period. Irrigation coverage tests including initial and final tests. Finish grade prior to planting. Plant materials prior to planting and soil preparation. Planting, including street trees. Contact the Parks Planning & Landscape Development Section, Engineering Division, for species and final locations. Compliance with approved plans. Final Inspection. The Owner's representative and landscape contractor shall be present at each inspection. SCALE: N.T.S. MAINTENANCE GUIDELINES: Landscape shall be maintained in a neat, clean, weed -free and healthy condition. This shall include but not be limited to: 1. Cultivation of planted beds at intervals not to exceed ten (10) days. 2. Regular mowing to maintain lawn height not to exceed recommended height of specific species. 3. Regular pruning of plants as necessary to control and direct growth. 4. Scheduled maintenance of irrigation controller to assure proper application rate of water necessary for proper plant growth. Drip irrigation may require specialized landscape maintenance care. 5. Immediate replacement of irrigation materials as needed to maintain good working conditions. 6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper plant growth. 7. Immediate repair or replacement of irrigation materials as needed to maintain good working conditions. 8. Stakes, guys & ties on trees shall be checked regularly for correct function. Ties are to be adjusted to avoid abrasions or girdling of trunk or branches. 9. Upon completion of three (3) month (90 day) contract maintenance period, an inspection shall be made by the Community Development Department Engineering Division Landscape Inspection Staff. The landscape shall be maintained in accordance with these landscape maintenance standards. 10. The Developer/Builder is responsible to contact the City and schedule the maintenance inspection. FONTANA, ALIFORNIA FORM A T HOMES A. B. Anchor Bolt Int. Integral A. C. Asphaltic Concrete J. Box Junction Box Adj. Adjacent Jts. Joints Alt. Alternate L. A. Landscape Architect Arch. Architect Lic. Licensed Auto. Automatic L. P. Low Point Bldg. Building Max. Maximum Blk. Black M.B. Machine Bolt B.M. Bench Mark Mach. Mechanical B.S. Bottom of Steps Med. Medium C. B. Catch Basin Min. Minimum C. F. Cubic Foot M.H. Manhole C.1. Cast Iron Multi. Multi -branched C.1. P. Cast Iron Pipe Nat. Natural C. J. Cold Joint N.I.C. Not in Contract C. L. Center Line 0. C. On Center Cir. Clearance 0.0. Outside Diameter C. 0. Clean Out P. A. Planting Area C. M. P. Corrugated Metal Pipe Perf. Perforated Comp. Compacted P.O.C. Point of Connection Con. Concrete P.S.I. Pounds Per Square Cond. Condition P. T. Pressure Treated Cont. Continuous P. V. C. Poly Vinyl Chloride Ct. Center R. Radius Ctr. Sink Counter Sink R.C.P. Reinforced Concrete D.D. Deck Drain Rebar Reinforcing Bar D.F. Douglas Fir Rein. Reinforcing D.G. Decomposed Granite Req'd. Required Dia. Diameter Ret. Retardant Dim. Dimension Rgh. Rough Dtl. Detail R.S. Rough Sawn Ea. Each R.S.R. Rough Sawn Redwood E. J. Expansion Joint Rwd. Redwood Elec. Electric Sch. Schedule Elev. Elevation S.F. Square Foot Eng. Engineer Sht. Sheet Esp. Espalier Sht. Mtl' Sheet Metal Eq. Equal Sim. Similar E. W. Each Way S. L. Scoreline E. W. W. M. Electric Welded Wire Mesh Smth. Smooth Ex. Existing Specs. Specifications Exp. Exposed Sq. Square F. F. Finish Floor Elevation Sti. Steel F. G. Finish Grade T.A.D. Top of Area Drain F. H. Fire Hydrant T & B Top and Bottom Fin. Finish T. B. Top of Berm F. L. Flow Line T. C. Top of Curb Flt. Flat Tex. Textured F.S. Finish Surface T. G. Top of Grate Ftg. Footing T. G. D. Top of Grate Drain Ftn. Fountain Thk. Thick Ga. Gauge T. P. Top of Paving Galy. Galvanized T. P. C. Top of Poll Couping G. C. Ground Cover T.S. Top of Steps G. 1. Galvanized Iron T. W. Top of Wall H.B. Hose Bib Twl. Trowel Hdr. Brd. Header Board Typ. Typical Horiz. Horizontal Vert. Vertical H. P. High Point W/ With Hgt. Height W/0 Without 1.D. Inside Diameter W. S. Water Surface Inv. Invert ` W D Z W a a Q cc W Ei SANTA ANA AVE. _ nnIA1n FWY 110) qt OVER AVENUE YWOOD ST. SCALE: N.T.B. T-1 W-1 C-1 C-2 C-3 C-4 C-5 D-1 1-1 1-2 1-3 1-4 1-5 D-2 P-1 P-2 P -3,P - P-5 D-3 S-1 S-2 D-4 TITLE SHEET WATER MASTER PLAN CONSTRUCTION PLAN CONSTRUCTION PLAN CONSTRUCTION PLAN CONSTRUCTION PLAN CONSTRUCTION PLAN CONSTRUCTION DETAILS IRRIGATION PLAN IRRIGATION PLAN IRRIGATION PLAN IRRIGATION PLAN IRRIGATION PLAN IRRIGATION DETAILS PLANTING PLAN Ma NO - 21 85 PLANTING PLAN PLANTING PLAN PLANTING PLAN PLANTING PLAN PLANTING DETAILS CONSTRUCTION SPECS. IRR. AND PLANTING SPECS. PROTO II DETAILS 1/15/01 (wALLs, SHEETS 1, 5, s), 3/30/01 (LANDSCAPE, SHEETS 1, 5, 6, 7) FIRST SUBMITTAL. - 4/13/01 (WALLS, SHEETS 2, 3, 4, 7, 8) SECOND SUBMITTAL - 2/27/01fWALLS. SHEETS 1. 5. ai 7/27j01(JANDsr.APE,�SHEETS 1-51 THIRD SUBMITTAL - 8/29/01fLANDSCAPE. SHEETS 1-51 FOURTH SUBMITTAL Underground Service Alert Call: TOLL FREE 1-800 422-4133 TWO WORKING DAYS BEFORE YOU DIG FORECAST HOMES 10''6'70 CIVIC CENTER DRIVE RANCHO CUCAMONGA, CALIFORNIA cl 1 130 TEL : (9041) 41807-12788 CONTACT PERSON: JIM PERRY/ROV PESZCZ SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND STANDARDS IN EFFECT. �pNp s CA pF �o 0My) y� 4 J w PREPARED UNDER THE SUPERVISION OF: DATE�G.%yrt- CITY OF FONTANA, CALIFORNIA DPAWN air: KPF SYCAMORE HILLS TRACT. #16074 COMMUNITY FACILMES DISTRICT SCALE: N/A ,.3g" * * 4�* Qom`! rF 0 F C A`�FD oESo air. � KPF DATE: 8/29/01 CHECKED BY. RWK App�p BY ✓�, 401DATE%��y rcn't. CfTY erNVEER R.C.I- si rwaP. DATE 1?131/m Ma NO - 21 85 I Z� AW AtS,.V-,so1.1LiMtn4-iT LCSGA�-1tJrJ�•81t91o2 / � A A A LANDSCAPE ARCHITECTURE SITE PLANNING 10621 CHURCH STREET • SUITE 106 RANCHO CUCAMONOA, CALIFORNIA q 1150 PH.(41041) 464-2800 FAX (4041) 464-2602 CONTACT: KEN FRICKE •:NUMBER: 0015-5 T-1 p7pjw OF 2 3 SHEETS