HomeMy WebLinkAbout2985-1ARCHIT[RRA
Anchor Bolt
Int.
Integral
A. C.
Asphaltic Concrete
J. Box
DESIGN
GROUP
Adjacent
Jts.
Joints
Alt.
Alternate
L. A.
LANDSCAPE ARCHITECTURAL CONSTRUCTION DOCUMENTS
FOR
54'r AMORE HILLPe IFI PLAN
I
CITY REQUIRED NOTES:
INSPECTIONS:
1 • It is the Landscape Contractors responsibility to contact the Engineering Division's
Landscape Inspector 48 hours prior to desired inspection of an item at (909) 350-6633.
2 Prior to release of utilities or maintenance period commencement, the following
inspections are required:
3.
Pre -Construction Meeting
Inspection of irrigation system in open trench condition (prior to backfill). Mainline
pressure test ® 150 P.S.I. for a three (3) hour continuous period.
Irrigation coverage tests including initial and final tests.
Finish grade prior to planting.
Plant materials prior to planting and soil preparation.
Planting, including street trees. Contact the Parks Planning & Landscape Development
Section, Engineering Division, for species and final locations.
Compliance with approved plans.
Final Inspection.
The Owner's representative and landscape contractor shall be present at each inspection.
SCALE: N.T.S.
MAINTENANCE GUIDELINES:
Landscape shall be maintained in a neat, clean, weed -free and healthy condition. This shall
include but not be limited to:
1. Cultivation of planted beds at intervals not to exceed ten (10) days.
2. Regular mowing to maintain lawn height not to exceed recommended height of specific species.
3. Regular pruning of plants as necessary to control and direct growth.
4. Scheduled maintenance of irrigation controller to assure proper application rate of
water necessary for proper plant growth. Drip irrigation may require specialized landscape
maintenance care.
5. Immediate replacement of irrigation materials as needed to maintain good working conditions.
6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper
plant growth.
7. Immediate repair or replacement of irrigation materials as needed to maintain good
working conditions.
8. Stakes, guys & ties on trees shall be checked regularly for correct function. Ties are to be
adjusted to avoid abrasions or girdling of trunk or branches.
9. Upon completion of three (3) month (90 day) contract maintenance period, an inspection
shall be made by the Community Development Department Engineering Division Landscape
Inspection Staff. The landscape shall be maintained in accordance with these landscape
maintenance standards.
10. The Developer/Builder is responsible to contact the City and schedule the maintenance
inspection.
FONTANA, ALIFORNIA
FORM A T HOMES
A. B.
Anchor Bolt
Int.
Integral
A. C.
Asphaltic Concrete
J. Box
Junction Box
Adj.
Adjacent
Jts.
Joints
Alt.
Alternate
L. A.
Landscape Architect
Arch.
Architect
Lic.
Licensed
Auto.
Automatic
L. P.
Low Point
Bldg.
Building
Max.
Maximum
Blk.
Black
M.B.
Machine Bolt
B.M.
Bench Mark
Mach.
Mechanical
B.S.
Bottom of Steps
Med.
Medium
C. B.
Catch Basin
Min.
Minimum
C. F.
Cubic Foot
M.H.
Manhole
C.1.
Cast Iron
Multi.
Multi -branched
C.1. P.
Cast Iron Pipe
Nat.
Natural
C. J.
Cold Joint
N.I.C.
Not in Contract
C. L.
Center Line
0. C.
On Center
Cir.
Clearance
0.0.
Outside Diameter
C. 0.
Clean Out
P. A.
Planting Area
C. M. P.
Corrugated Metal Pipe
Perf.
Perforated
Comp.
Compacted
P.O.C.
Point of Connection
Con.
Concrete
P.S.I.
Pounds Per Square
Cond.
Condition
P. T.
Pressure Treated
Cont.
Continuous
P. V. C.
Poly Vinyl Chloride
Ct.
Center
R.
Radius
Ctr. Sink
Counter Sink
R.C.P.
Reinforced Concrete
D.D.
Deck Drain
Rebar
Reinforcing Bar
D.F.
Douglas Fir
Rein.
Reinforcing
D.G.
Decomposed Granite
Req'd.
Required
Dia.
Diameter
Ret.
Retardant
Dim.
Dimension
Rgh.
Rough
Dtl.
Detail
R.S.
Rough Sawn
Ea.
Each
R.S.R.
Rough Sawn Redwood
E. J.
Expansion Joint
Rwd.
Redwood
Elec.
Electric
Sch.
Schedule
Elev.
Elevation
S.F.
Square Foot
Eng.
Engineer
Sht.
Sheet
Esp.
Espalier
Sht. Mtl'
Sheet Metal
Eq.
Equal
Sim.
Similar
E. W.
Each Way
S. L.
Scoreline
E. W. W. M.
Electric Welded Wire Mesh
Smth.
Smooth
Ex.
Existing
Specs.
Specifications
Exp.
Exposed
Sq.
Square
F. F.
Finish Floor Elevation
Sti.
Steel
F. G.
Finish Grade
T.A.D.
Top of Area Drain
F. H.
Fire Hydrant
T & B
Top and Bottom
Fin.
Finish
T. B.
Top of Berm
F. L.
Flow Line
T. C.
Top of Curb
Flt.
Flat
Tex.
Textured
F.S.
Finish Surface
T. G.
Top of Grate
Ftg.
Footing
T. G. D.
Top of Grate Drain
Ftn.
Fountain
Thk.
Thick
Ga.
Gauge
T. P.
Top of Paving
Galy.
Galvanized
T. P. C.
Top of Poll Couping
G. C.
Ground Cover
T.S.
Top of Steps
G. 1.
Galvanized Iron
T. W.
Top of Wall
H.B.
Hose Bib
Twl.
Trowel
Hdr. Brd.
Header Board
Typ.
Typical
Horiz.
Horizontal
Vert.
Vertical
H. P.
High Point
W/
With
Hgt.
Height
W/0
Without
1.D.
Inside Diameter
W. S.
Water Surface
Inv.
Invert
`
W
D
Z
W
a
a
Q
cc
W
Ei
SANTA ANA AVE.
_ nnIA1n FWY 110)
qt OVER AVENUE
YWOOD ST.
SCALE: N.T.B.
T-1
W-1
C-1
C-2
C-3
C-4
C-5
D-1
1-1
1-2
1-3
1-4
1-5
D-2
P-1
P-2
P -3,P -
P-5
D-3
S-1
S-2
D-4
TITLE SHEET
WATER MASTER PLAN
CONSTRUCTION PLAN
CONSTRUCTION PLAN
CONSTRUCTION PLAN
CONSTRUCTION PLAN
CONSTRUCTION PLAN
CONSTRUCTION DETAILS
IRRIGATION
PLAN
IRRIGATION
PLAN
IRRIGATION
PLAN
IRRIGATION
PLAN
IRRIGATION
PLAN
IRRIGATION
DETAILS
PLANTING PLAN
Ma NO -
21 85
PLANTING PLAN
PLANTING PLAN
PLANTING PLAN
PLANTING PLAN
PLANTING DETAILS
CONSTRUCTION SPECS.
IRR. AND PLANTING SPECS.
PROTO II DETAILS
1/15/01 (wALLs, SHEETS 1, 5, s), 3/30/01 (LANDSCAPE, SHEETS 1, 5, 6, 7)
FIRST SUBMITTAL. - 4/13/01 (WALLS, SHEETS 2, 3, 4, 7, 8)
SECOND SUBMITTAL - 2/27/01fWALLS. SHEETS 1. 5. ai 7/27j01(JANDsr.APE,�SHEETS 1-51
THIRD SUBMITTAL - 8/29/01fLANDSCAPE. SHEETS 1-51
FOURTH SUBMITTAL
Underground Service Alert
Call: TOLL FREE
1-800
422-4133
TWO WORKING DAYS BEFORE YOU DIG
FORECAST HOMES
10''6'70 CIVIC CENTER DRIVE
RANCHO CUCAMONGA, CALIFORNIA cl 1 130
TEL : (9041) 41807-12788
CONTACT PERSON: JIM PERRY/ROV PESZCZ
SHOULD CONSTRUCTION OF THE REQUIRED
IMPROVEMENTS NOT COMMENCE WITHIN TWO
YEARS OF THE DATE OF APPROVAL SHOWN
HEREON AND CARRIED FORTH IN A DILIGENT
MANNER, THE CITY ENGINEER MAY REQUIRE
REVISIONS TO THE PLANS TO BRING THEM INTO
CONFORMANCE WITH CONDITIONS AND
STANDARDS IN EFFECT.
�pNp s CA pF
�o 0My) y� 4
J w
PREPARED UNDER THE SUPERVISION OF:
DATE�G.%yrt-
CITY OF FONTANA, CALIFORNIA
DPAWN air:
KPF
SYCAMORE HILLS
TRACT. #16074
COMMUNITY FACILMES DISTRICT
SCALE:
N/A
,.3g"
* *
4�* Qom`!
rF 0 F C A`�FD
oESo air.
�
KPF
DATE:
8/29/01
CHECKED BY.
RWK
App�p BY
✓�, 401DATE%��y
rcn't. CfTY erNVEER R.C.I- si rwaP. DATE 1?131/m
Ma NO -
21 85
I
Z�
AW
AtS,.V-,so1.1LiMtn4-iT LCSGA�-1tJrJ�•81t91o2 / �
A
A A
LANDSCAPE ARCHITECTURE
SITE PLANNING
10621 CHURCH STREET • SUITE 106
RANCHO CUCAMONOA, CALIFORNIA q 1150
PH.(41041) 464-2800 FAX (4041) 464-2602
CONTACT: KEN FRICKE
•:NUMBER:
0015-5
T-1
p7pjw
OF 2 3 SHEETS