HomeMy WebLinkAbout2919-192 ]TYPICAL! <
N4 _t -
W-4 4?M —7-
En cn cn En (n
O
- - - . ........... . . . ........
0
+
rn
NI
LO
ocn F 0 0 T I L L 0 U L E V A R D
Cc
WI
P0P2
+
0
M
uj
LLJ
(n
Ld th-th-tit ih�h_ih_&_ih_ di-th-th-M th-& _i4_i4_ih -th-eh-th th -th-th.
Z-- - - - -
_j
- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - --
_7 - - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - --
L)
LLJ
;
II -cr 11 -c:r
;.�; i m N
+
ccnn WW
< (n
cn
+33
LL
W
cl
z EL
0-
D
W
u W
F- (n
INTERCONNECT GENERAL NOTES
INTERCONNECT CONSTRUCTION NOTES
i
ALL MATERIAL AND WORK SHALL CONFORM TO THE JULY 1999'STANDARD PLANS
5. ALL TRAFFIC CONTROL,WORK ZONES AND LANE CLOSURES SHALL BE COMPLETELY
1I
INSTALL SIZE 53 CONDUIT, NO. 6 PULL BOXES AND NYLON PULL ROPE
AND SPECIFICATIONS OF THE CALIFORNIA DEPARTMENT OF TRANSPORTATION.
DELINEATED BY CHANNELIZATION DEVICES AND SHIELDED BY BARRIERS TO EXCLUDE
AS SHOWN ON THE PLANS.
VEHICLE AND/OR PEDESTRIAN TRAFFIC. THE CONTRACTOR SHALL FOLLOW THE
2.
LOCATIONS OF ALL UNDERGROUND UTILITIES ARE APPROXIMATE. THE CONTRACTOR
MANUAL OF TRAFFIC CONTROL DEVICES FOR CONSTRUCTION AND MAINTENANCE WORK
F2]
INSTALL SIZE 53 CONDUIT, NO. 6 PULL BOXES AND 1-12 PAIR #19
etric
SHALL DETERMINE THE EXACT LOCATIONS AND VERIFY ALL CONDITIONS ON THE JOB
ZONES, CALTRANS STANDARD SPECIFICATIONS AND STANDARD PLANS, LATEST
INTERCONNECT CABLE AS SHOWN ON THE PLANS.
o
EDITIONS. EXACT LOCATION OF ALL,TRAFFIC CONTROL TO BE DETERMINED BY
SEE SHEETS 7 THRU 11
FOR TRAFFIC SIGNAL
0
SERVICE ALERT AT (800) 227-2600 PRIOR TO ANY EXCAVATION.
0
1
0
0
k A
78 CONDUIT AS SHOWN. CONTINUE INTERCONNECT CABLE(S) INTO
3.
+
+
.
CONSTRUCTION.
(D
+
—
Cu
+
1
00
+
F 4]
Iq
+
4.ALL
00
+
t
The information on this drawing is obtained
from others
LO
N
FONTANA ENGINEERING DIVISION PRIOR TO COMMENCEMENT OF WORK.
Nc\j
LID
N
i
cu
00
cy)
Lu
C+I
II
I3
l-_
2
Y ICAL
�064_ W, 4 XP
. . - -,
<
cn
--n
En
En
I �'
En
En
En
cn
Fro- _-: C-1 verf R__ Z7
_2
0 _Lu
7-1
61
0
it
. . . ..... . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . .
...
. . . .. . . .
. .
. . .. . . .
.
00 -
M
M
+
CQ
WN'
+
cn
N
cn 0;
F 0
H I
L L
Lr)
B 0 U L
E V A R D
F—
L.L
(n
(
(nW
' I
I
I_j
+�6
1�7
gg
X
0-
_j
(D
M
CC
3r. z
rG.
-
- - - r!r_,h -h _,h _4 _,h -,h _,h -4
_4 -h
Lu cn
z
0 F-1:
_j I
F-1
_j
LLJ X-----------------------
Uj L)
6T
15T
- -- - --1-----------------------------------
cn F_
— -- — -- —
-- — -- —
-
-- — -\\
I
Q
�, /
I
it
i
i
i
i i
;
2 ]TYPICAL! <
N4 _t -
W-4 4?M —7-
En cn cn En (n
O
- - - . ........... . . . ........
0
+
rn
NI
LO
ocn F 0 0 T I L L 0 U L E V A R D
Cc
WI
P0P2
+
0
M
uj
LLJ
(n
Ld th-th-tit ih�h_ih_&_ih_ di-th-th-M th-& _i4_i4_ih -th-eh-th th -th-th.
Z-- - - - -
_j
- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - --
_7 - - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - --
L)
LLJ
;
II -cr 11 -c:r
;.�; i m N
+
ccnn WW
< (n
cn
+33
LL
W
cl
z EL
0-
D
W
u W
F- (n
INTERCONNECT GENERAL NOTES
INTERCONNECT CONSTRUCTION NOTES
i
ALL MATERIAL AND WORK SHALL CONFORM TO THE JULY 1999'STANDARD PLANS
5. ALL TRAFFIC CONTROL,WORK ZONES AND LANE CLOSURES SHALL BE COMPLETELY
1I
INSTALL SIZE 53 CONDUIT, NO. 6 PULL BOXES AND NYLON PULL ROPE
AND SPECIFICATIONS OF THE CALIFORNIA DEPARTMENT OF TRANSPORTATION.
DELINEATED BY CHANNELIZATION DEVICES AND SHIELDED BY BARRIERS TO EXCLUDE
AS SHOWN ON THE PLANS.
VEHICLE AND/OR PEDESTRIAN TRAFFIC. THE CONTRACTOR SHALL FOLLOW THE
2.
LOCATIONS OF ALL UNDERGROUND UTILITIES ARE APPROXIMATE. THE CONTRACTOR
MANUAL OF TRAFFIC CONTROL DEVICES FOR CONSTRUCTION AND MAINTENANCE WORK
F2]
INSTALL SIZE 53 CONDUIT, NO. 6 PULL BOXES AND 1-12 PAIR #19
SHALL DETERMINE THE EXACT LOCATIONS AND VERIFY ALL CONDITIONS ON THE JOB
ZONES, CALTRANS STANDARD SPECIFICATIONS AND STANDARD PLANS, LATEST
INTERCONNECT CABLE AS SHOWN ON THE PLANS.
SITE. HAND DIG UNTIL CLEAR OF OBSTRUCTIONS. PHONE UNDERGROUND
EDITIONS. EXACT LOCATION OF ALL,TRAFFIC CONTROL TO BE DETERMINED BY
SERVICE ALERT AT (800) 227-2600 PRIOR TO ANY EXCAVATION.
THE ENGINEER, AND ADDITIONAL WARNING AND/OR CONSTRUCTION SIGNING
F3]
ENTER PROPOSED TRAFFIC SIGNAL CONTROLLER FOUNDATION WITH SIZE
MAY BE REQUIRED.
78 CONDUIT AS SHOWN. CONTINUE INTERCONNECT CABLE(S) INTO
3.
THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER FOR EXACT
CONTROLLER CABINET AND TERMINATE AS REQUIRED.
EQUIPMENT LOCATIONS PRIOR TO FINAL PLACEMENT:
6.1 PULL BOXES TO BE INSTALLED ARE TO BEAT 60 METERS MAXIMUM SPACINGRECORD DRAWING
—
UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
F 4]
EXISTING SIZE 53 CONDUIT WITH PULL ROPE. ABANDON IN PLACE.
4.ALL
REQUIRED CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF
t
The information on this drawing is obtained
from others
FONTANA ENGINEERING DIVISION PRIOR TO COMMENCEMENT OF WORK.
GRAPHIC SCALE
IN METERS
I 1 0 2 1 0 3 1 0 4 1 0
1: 500M
ied in the TWO by an
rjr' • constrtiction., WARREN �C.� S I ECKE
-�"
j� jor�
Ponsib ,on erjrk6d facility loca
ejepi�cflons-.�, All, abqy-, fic'i, ties. c4
an `verified v
d I � " " I i f " e'd h" A z 6 " ' n' �a"rz t"ite� Q"" 14 hi a't
ne prior to, use
no
ins or
b6"readily
n do use i�alne.
A NOTE: ALL DIMENSIONS ARE IN METERS U14LESS SHOWN OTHERWISE.
FOR REDUCED PLANS ORIGINAL 0 20 40 60 111)
SCALE IS IN MILLIMETERS EA 317900