HomeMy WebLinkAbout2873-2U
0
0
0
0
0
DWG. DATE=-----------
RECORD DRAWING
AUGUS T"
`
T14ESE RECORD DRAWMIQS HAVE BEEN PREPARED, IN
�
PART ON THE BASIS OF MIFOR:•AATION COMPILED AND
EW. 9' 3�r05 FURNISHED BY OTHERS. THE ENGMIEER WILL NOT BE
BENCH MARK: # G15
BASIS OF BEARINGS:
* * RESPONSIBLE FOR ANY ERRORS OR OMISSIONS WHICH
RAILROAD 5PKE AT INTERSECTION
THE BEARING OF N8gO3O'OG' ALONG
HAVE BEEN INCORPORATED INTO THE DOCUMENTS AS
OF OTRUS AVE. AND LOS CEOROS THE NO. LINE OF SEG. W. T. IN..
A RESULT THEREOF.
AVE.. IN POWER POLE Na CIO1IE
R. 5W - 5.11M. PER R.S. 58/5.
ON THE EAST SIDE OF GTRU!& AVE. WAS USED A5 THE BASIS OF
_
BEARINGS FOR THIS PLAN.
ELEVATION: 1467.59
REV. REVISION DESCRIPTION
DATE ENGR. CITY DATE
Prepared Under The Supervision Of:
CITY
OF
FONTANA,
CALIFORNIA
Underground Service Alert
SHOULD CONSTRUCTION OF THE REOUIRED IMPROVEMENTS NOT
Q��EESSIO,yq
�F
PREPARED IN THE OFFICE OF
MADOLE AND ASSOCIATES, INC_
SEWER
PLAN
CALL
COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL
Q�° �z�TON
��`����yG%
OF THE INLAND EMPIRE
DRAWN BY:
SCALE:
TOLL FREE
SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER,
W Q m
� No 14814 m �
10601 CHURCH STREET, STE. 107
SIERRA LAKES
A5 SHOWN
�
1-800
THE CITY ENGINEER MAY REOUIRE REVISIONS TO THE PLANS TO
.
Exp: 3-31-01
RANCHO CUCAMONGA, CA. 91730
PHONE (909) 948-1311
DESIGNED BY:
TRACT N
15�i08
DATE:
227-2600 ADD YG•P CAr. Pb - P^ /9
�
BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
�/u/ >�M �l�o
* *
sT
AcJ,F
I
�9
N
1011 04
STANDARDS IN EFFECT.
CIVI �.
9lF OF CAL1 pQ��'
(-770-pt
Date:
CHECKED BY:
/
DRAWING NO.
�
TWO WORKING DAYS BEFORE YOU DIG
��
J'14. MADOLE R.C.E.14814 EXP.3-31-01
R��j
�OVEBY.
DATE: p
Q
273 2
z
/4/Q ,
AC INC
CITY EN NEER R.C.E.
51152 EXP. 9-30-01
*P* AIIAIIATA
nR (W) AFWFR-
;HT ?
- ?1 [n_ ?911 PF' 1154
RR -1O? -Jan -01 10: 29
AM / A26-1154-1
DWG. DATE=-----------