Loading...
HomeMy WebLinkAbout2740-7�• L MAIN CONSTRUCTION JOINT ' LINE RCB IOM O 450 mm (•4 0 181) OC F BARS LATERAL / E CONNECTOR PIPE IE c / F BARS o. 0 T I 15M 0 450 mm W BARS ~ Q p (04 O 18') OC SEE NOTE 3 �+ BOTH WAYS TO ' BETS SS00 mmN ROUND EDG` TO h BIS 50 MORE 75 mm (31) ( OM 0 450 m STATION POINT, 03 OR #4 SEE NOTE 2 018•) OC SECTION G -G zL /I � I I /Z ROUND EDGES TO am APPROXIMATE R B T OF ID OF LATERAL o / E� E WITH A MAXIMUM m 0 o OF 1.0 m (3'-0') x a to '� I D 8 E BARS c m D.E.HSGBARS 300 IDIa 112.1 130 mm (5*) 0 0 375 mm (159 130 mm (51) I 450 mm (18.1 130 mm (57 'O 525 mm (21.) 130 mm (5•) ' CONSTRUCTION JOINT 600 Rm 1241 140 m (5 1/41 675 am (27) 140 m (51/211 E PLAN 750 mm (309 160 mm (6-) "- o 825 mm (339 160 Rm (6 1/4.1 975 mm (369 170 mm (61/21 O I NEW OR EXISTING RCB, SEE NOTE 6 990 mm (399 180 mm (7•) a 1050 mm (42') 190 RRR (7 1/2) W BARS 1125 mm (45.1 200 = (7 3/41 0 0 fie- 1220 mm (48'1 210 mm (81) D BARS 1275 RR17 1519 220 m to I/2•) iD �� �� ANY STANDARD O F BARS PIPE JOINT 1350 on (549 230 mm (91 2-H BARS 100 mm 1500 mm (57) 240 m (9 1/41) �o (4') OC, SEE NOTE 3 1500 mm (60.1 240 m (9 V21) E ROUND 1650 m(63.1 260 m (109 N E 1 O P 1680 mm (66'1 260 m (10 1/49 0 EDGES IOM 450 mm � n (#3 OR •4 m 1800 mm (69.1 280 m (10 3/4*1 O ELEV. S. 0 18•) OC ELEV. R. SEE NOTE 8 1850 mm (729 280 mm 011m SEE NOTE 8 E BARS 1950 nm (78.1 300 = (A 3/4.1 !2 2-G BARS 100 mm �2100 mm (849 320 Rm (12 1/2.) (41 OC, SEE NOTE 3 c °;%o. 2400 mm (909 340 m 03 1/4'1 c ' 2440 mm (961) 360 nm 049 ...'a UNDISTURBED EARTH 2550 mm (1029 400 m 05 1/27 tO BACKFILL WITH 265 Kq-C-14 MPa 2700 mm 0081410 mm (161) (450-C-2000) MIX CONCRETE, OR 3000 mm 0141420 =(16 1/r) • COMPACT SOIL TO RELATIVE DENSITY 3050 wm (120) 430 mm (179 REQUIRED BY SPECIFICATIONS. BACKFILL 3190 mm (1291) 130 ma 0,r) N o MAY BE OMITTED IF STRUCTURE IS LAID ON UNDISTURBED EARTH TO STORM 3300 m 032.) 1450 = (17 I/Y) SECTION Z - Z DRAIN WALL. 13450 mm IIUM 1450 =07 I/rl O 3600 m (144•) 460 AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER PROMULGATED BY THESTANDARD PUBLIC WORKS. STANDARDS INC., JUNCTION STRUCTURE - PIPE TO RCB PLAN GREENBOOK COMMITTEE 4f)-51 333RIC 1.,w 1964 4 1-6 REV' 1996 SHEET 1 OF 2 USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION • FINISHED SURFACE O.D.+12' V L- A L t COVER SEE LIFT \ :::.4.:; A BARSQ 2 DETAIL BELOW RCP -'��\` I.D. `� 11 O.D.+12" O.D. ,%/ RCP LA FRONT VIEW SECTION A -A NOTES I. VALUES FOR A, B AND C SHALL BE SHOWN ON THE PROJECT DRAWINGS. ELEVATION R AND ELEVATION S SHALL BE SHOWN WHEN REQUIRED PER NOTE 8. 2. STATIONS SPECIFIED ON THE PROJECT DRAWINGS APPLY AT THE INTER- SECTION OF CENTER LINES OF MAIN LINE AND LATERALS, EXCEPT THAT STATIONS FOR CATCH BASIN CONNECTOR PIPES APPLY AT INSIDE WALL OF STRUCTURE. 3. REINFORCING STEEL SHALL CONFORM TO ASTM A 615M, GRADE 300• (ASTM A 615, GRADE 40). AND SHALL TERMINATE 40 mm (1 1/2") CLEAR OF CONCRETE SURFACE UNLESS OTHERWISE SHOWN. a. W BARS ARE OF SIZE AND SPACING SPECIFIED FOR WALL STEEL ON PROJECT DRAWINGS, AND SHALL BE CUT IN CENTER OF OPENING AND BENT INTO TOP AND BOTTOM OF JUNCTION STRUCTURE. b. OMIT H BARS WHEN SOFFIT OF SPUR IS 300 mm (12") OR LESS BELOW SOFFIT OF MAIN LINE. AND OMIT G BARS WHEN INVERT OF SPUR IS 300 mm (12') OR LESS ABOVE FLOOR OF MAIN LINE. 4. JUNCTION STRUCTURE SHALL BE POURED MONOLITHICALLY WITH MAIN LINE, MANHOLE OR TRANSITION STRUCTURE. 5. FLOOR OF STRUCTURE SHALL BE STEEL -TROWELED TO THE SPRING LINE. 6. WHEN CONNECTING TO EXISTING RCB, BREAKOUT LIMITS AND DETAILS SHALL BE SHOWN ON THE PROJECT DRAWINGS. 7. EMBEDMENT, P. SHALL BE 130 mm (5") FOR B = 2400 mm (96') OR LESS 200 mm (8') FOR B OVER 2400 mm (96'). 8. IF ELEVATION R AND ELEVATION S ARE NOT SHOWN ON THE PROJECT DRAWINGS THEN THE INLET OPENING SHALL FALL 150 mm (6") BELOW THE SOFFIT OF THE MAIN LINE WITH THE INLET PIPE LAID ON A STRAIGHT GRADE FROM MAIN LINE TO CATCH BASIN OR TO GRADE BREAK IN INLET LINE. ELEVATION S SHALL BE SHOWN ON THE PROJECT DRAWINGS IF THE INLET OPENING FALLS MORE THAN 150 mm (61 BELOW THE SOFFIT OF THE MAIN LINE WITH THE INLET PIPE LAID ON A STRAIGHT GRADE AS STATED ABOVE. ELEVATION R SHALL BE SHOWN ON THE PROJECT DRAWINGS ONLY WHEN A STUB IS TO BE PROVIDED FOR A FUTURE CONNECTION. 9. LATERALS OR CONNECTOR PIPES 600 mm (24") OR LESS IN DIAMETER SHALL BE NO MORE THAN 1.5m (5') ABOVE THE INVERT. LATERALS OR CONNECTOR PIPES 675 mm (271 OR LARGER IN DIAMETER SHALL BE NO MORE THAN 450 mm (18') ABOVE THE INVERT, WITH THE EXCEPTION THAT CATCH BASIN CONNECTOR PIPES LESS THAN 15 m (50') IN LENGTH SHALL ,NOT BE MORE THAN 1.5 m (5') ABOVE THE INVERT. 10. THE NEED FOR AN EDGE BEAM AND/OR ADDITIONAL REINFORCEMENT SHALL BE INVESTIGATED BY THE ENGINEER FOR ANY ONE OF THE FOLLOWING CONDITIONS: a. ANGLE A IS LESS THAN 300 b. TOP OF INLET PIPE IS LESS THAN 150 mm (6') BELOW THE SOFFIT c. FLOW LINE OF INLET PIPE IS LESS THAN 180 mm (71 ABOVE THE THE FLOOR OF THE RCB AT THE INSIDE FACE 11. DIMENSIONS SHOWN ON THIS PLAN FOR METRIC AND ENGLISH UNITS ARE NOT EXACT EQUAL VALUES. IF METRIC VALUES ARE USED. ALL VALUES USED FOR CONSTRUCTION SHALL BE METRIC VALUES. EXCEPT REINFORCING BARS SIZES IN ENGLISH UNITS MAY BE SUBSTITUTED FOR METRIC BAR SIZES. IF ENGLISH UNITS ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE ENGLISH UNITS. AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER STANDARD PLAN METRIC 333-1 JUNCTION STRUCTURE - PIPE TO RCB A BARS SHEET 2 OF 2 !.D (IN.) COVER (FT.) t (IN.) A BARS L , P 4f)-51 - - -N - 4 4 1-6 10 4 4 e 6 15 5 4 a 6 54-60 LINE 4 4 1-8, 10 5 4 O 6 15 5 5 m 6 63-66 1650 mm (660 525 mm (211 275 mm (110) 4 1'-10" 10 5 5 e 6 69-72 5 5 4 e 6 2--0- 10 5 50 6 Is 5 f 0 6 75-78 5 5 50 6 2,' 2,r 10 6 e 6 15 6 60 6 81-84 90 5 5 2-4' 10• 1 5 6 It 6 15 1 6 60 5 87-90 5 60 6 2'-5" 10 6 6 B6 68 93-96 2-7' 10 6 6 5 15 6 70 <A - �A. BARS NO SHOWN 6 12 In I ( LIFT DETAIL NOTES: 1. CONCRETE SHALL BE CLASS "B'. 2�REINFORCING STEEL SHALL BE CENTERED IN BULKHEAD WITH HORIZONTAL "A'BARS TOWARDS OUTSIDE FACE OF BULKHEAD. 3. WHERE CONCRETE BULKHEAD IS USED WITH RCB,t 8 "A".BARS SHALL BE DETERMINED BY THE HEIGHT OF THE R.C.B. OLIFTS SHALL BE WOVE`: STEEL CABLE WITH SAME MIN. DIAMETER (d) AS"A' BARS. WEAVE CABLE THROUGH HORIZONTAL "A" BARS. COAT EXPOSED PORTION OF CABLE LIFTS WITH AN APPROVED BITUMINOUS PAINT PRIOR.TO BACKFILLING TRENCH. of V'S.ONi WIVIRSID[ COUNTY PLOOD CONTROL PROJECT NO A1D WATIR CONSIRVATION DISTRICT M►ROVCD RfDaewiNG NO ^,�_ CONCRETE BULKHEAD -- --- - WE n.w. c^a-�t �" r,cn[r• • w 1177 ' SME[T NO Rfr DESCRIPTION►PPR.ONTE c.aRmR. °•" ��-�'�.cJ S STANDARD DFAWING NUMBER IIsi( or REV. REW p o CHANCED SH a z"r DIAL Twu W❑RKING BEF❑RE DAYS BEFORE Y❑U DIG YOU DIG TOLL FREE 1-800-227-2600 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT 15M O 300 mm (#4 O 12' T 4 L/2 (TYP.)- 450 mm 089' 300 mm (12') 125 mm (51 - - -N - -- 0 750 mm (300) 450 mm (180) CUT 900 N0. 2 1050 mm (421) 450 mm (181 LINE 1200 mm (48. 450 mm (18') 250 mm (10') 1425 mm (57') 450 mm 081 250 mm VO l 1500 mm (60' 525 mm (211 275 mm (II-) 1650 mm (660 525 mm (211 275 mm (110) 1800 mm (72'1 600 mm (24' 300 mm (12'1 a 3.14 (DO -D) DETAIL "A' (SEE NOTE 10) I 1 / OF PIPE NEW OR o I t 4 VERSE PLANE. REVERSE ONE SECTION AND TAPE BOTH SECTIONS EXIST. PIPE TOGETHER FORMING THE DEFLECTION ANGLE A. TYPICAL JOINT FOR `� 90 FLOW p BEND THE ENDS OF THE CUT TOGETHER AND INSERT THE N£►y l0 I 7 F F� W <A f 15M O 300 mm (04 O 121 - 3-15M (04) CIRCULAR TIES, SEE NOTE 9 150 mm 6') MIN CUT NO. 2 LINE CUT NO. 1 T 4 100 mm (4') 450 mm 089' 300 mm (12') 125 mm (51 - - -N - -- 0 750 mm (300) 450 mm (180) CUT 900 N0. 2 1050 mm (421) 450 mm (181 LINE 1200 mm (48. 450 mm (18') 330-C-23 (560-C-3250) CONCRETE 25 mm (1') (TYP..) D L T 300 mm (121 300 mm (120) 100 mm (4') 450 mm 089' 300 mm (12') 125 mm (51 600 mm (24.1 300 mm (12') 150 mm (6.1 750 mm (300) 450 mm (180) 175 mm (7.1 900 mm (36.1 450 mm (181 225 mm (91 1050 mm (421) 450 mm (181 225 mm (9•) 1200 mm (48. 450 mm (18') 250 mm (10') 1425 mm (57') 450 mm 081 250 mm VO l 1500 mm (60' 525 mm (211 275 mm (II-) 1650 mm (660 525 mm (211 275 mm (110) 1800 mm (72'1 600 mm (24' 300 mm (12'1 F+ F,0OSE9F,yF AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER PROMULGATED BY THE CONCRETE COLLAR FOR RCP STANDARD PLAN METRIC PUBLIC WORKS STANDARDS INC., GREENBOOK COMMITTEE 300 mm 12" THROUGH 1800 mm 72" 380-2 t9sz REV. 19% 825 mm (33') TO SHEET 1 OF 2 .p. "e e a e 1500 mm (600) TO 1800 mm (720) 5 150 mm 6'1 MIN CUT N0. 2 a 3.14 (DO -D) DETAIL "A' (SEE NOTE 10) INTERIOR SURFACE OF PIPE SONO -TUBE. OR EQUAL, INTERIOR FORM CUT NO. 1: SAW THE TUBE AT AN ANGLE OF A/2 WITH THE TRANS- DETAIL "Bu VERSE PLANE. REVERSE ONE SECTION AND TAPE BOTH SECTIONS TOGETHER FORMING THE DEFLECTION ANGLE A. TYPICAL JOINT FOR CUT NO. 2: SAW THE TUBE LONGITUDINALLY REMOVING A STRIP REINFORCED CONCRETE PIPE 3.14 (DO -D ) WIDE ON THE SIDE OPPOSITE THE OPEN JOINT. BEND THE ENDS OF THE CUT TOGETHER AND INSERT THE TUBE IN THE PIPE. AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER PROMULGATED BY THE CONCRETE COLLAR FOR RCP STANDARD PLAN METRIC PUBLIC WORKS STANDARDS INC., GREENBOOK COMMITTEE 300 mm 12" THROUGH 1800 mm 72" 380-2 t9sz REV. 19% 825 mm (33') TO SHEET 1 OF 2 USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION NOTES I. A CONCRETE COLLAR IS REQUIRED WHERE THE CHANGE IN GRADE EXCEEDS 10 PERCENT. 2. FOR CURVE JOINTS (SEE DETAIL B. SHEET 1) IF THE EXTREME ENDS OF THE PIPE LEAVE A CLEAR SPACE THAT IS GREATER THAN 25 mm (I'). BUT IS LESS THAN 75 mm((3') A CONCRETE COVER IS REQUIRED IN ACCORDANCE WITH SUBSECTION 306-1.2.4 OF THE SSPWC. IF THE EXTREME ENDS OF THE PIPE LEAVE A CLEAR SPACE THAT IS EQUAL TO OR GREATER THAN 75 mm (3'), BUT LESS THAN 150 mm (6'), A CONCRETE COLLAR IS REQUIRED. IF THE CLEAR SPACE IS 150 mm (6') OR GREATER, A TRANSITION STRUCTURE IS REQUIRED. 3. CONCRETE COLLAR SHALL NOT BE USED FOR A SIZE CHANGE ON THE MAIN LINE. 4. CONNECTOR PIPES A. WHERE PIPES OF DIFFERENT DIAMETERS ARE JOINED WITH A CONCRETE COLLAR, L AND T SHALL BE THOSE OF THE LARGER PIPE. D=DI OR 02. WHICHEVER IS GREATER. B. WHEN DI IS EQUAL TO OR LESS THAN Qz, JOIN INVERTS AND WHEN DI IS GREATER THAN D2, JOIN SOFFITS. 5. FOR PIPE LARGER THAN 1800 mm (72') SPECIAL COLLAR DETAILS ARE REQUIRED. 6. FOR PIPE SIZE NOT LISTED USE NEXT SIZE LARGER. 7. REINFORCEMENT SHALL CONFORM TO ASTM A 615 M (A 615) GRADE 300(40). 8. WHERE REINFORCING IS REQUIRED THE DIAMETER OF THE CIRCULAR TIES SHALL BE D+(2X WALL THICKNESS) + T. 9. REINFORCING SHALL BE USED WHERE THE PIPE DIAMETER IS GREATER THAN 525 mm (21') AND ON ALL PIPES WHERE THE SPACES BETWEEN THE EXTREME OUTER ENDS IS 75 mm (3') OR LARGER. CIRCULAR TIES PIPE DIAMETER N0. OF CIRCULAR TIES 525 mm (210) OR LESS 3 600 mm (24') TO 750 mm (30') 3 825 mm (33') TO 1425 mm (57') 4 1500 mm (600) TO 1800 mm (720) 5 WHERE THE SPACE BETWEEN PIPE ENDS EXCEEDS 75 mm (3'). THE NUMBER OF CIRCULAR TIES SHALL BE INCREASED TO MAINTAIN AN APPROXIMATE SPACING OF 150 mm (6') O.C. 10. WHERE THE PIPE IS 525 mm (21') OR LESS IN DIAMETER AN INTERIOR FORM OF UNSEALED SONO -TUBE OR EQUAL SHALL BE USED TO PROVIDE A SMOOTH INTERIOR JOINT. THE PAPER FORM MAY BE LEFT IN PLACE (SEE DETAIL A). WHEN THE PIPE IS 600 mm (24') OR LARGER A REMOVABLE INTERIOR FORM SHALL BE USED OR THE INTERIOR JOINT SHALL BE COMPLETELY FILLED WITH MORTAR AND NEATLY POINTED. 11. DIMENSIONS SHOWN ON THIS PLAN FOR METRIC AND ENGLISH UNITS ARE NOT EXACT EQUAL VALUES. IF METRIC VALUES ARE USED. ALL VALUES USED FOR CONSTRUCTION SHALL BE METRIC VALUES, EXCEPT REINFORCING BAR SIZES IN ENGLISH UNITS MAY BE SUBSTITUTED FOR METRIC BAR SIZES. IF ENGLISH UNITS ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE ENGLISH UNITS. AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER STANDARD PLAN METRIC 380 - 2 SHEET 2 OF 2 CONCRETE COLLAR FOR RCP380-2 300 mm 12" THROUGH 1800 mm 72" 11 v >* 0'