Loading...
HomeMy WebLinkAbout5132-2S-3 S-1 Know whams be'kw Call bekw a you dig. HOA MAINTAINED- REFER TO SHEETS CL -1, CL -2, CL -3, SEPARATE SET PREPARED BY SUMMERS, MURPHY AND PARTNERS, INC S-2 D.R.HORTON TRACT 18245 CFD LANDSCAPE PLANS DRAWN BY:. SC ALE: CN CONSTRUCTION AS SHOWN DESIGNED BY: YOUT DATE: RH 06-16-14 CHECKED B Y: PPRovE !� DRAWING NO: 17131 5132 SMP CITY ENGINEER RCE NO. 51152 DATE KEYMAP N.T.S. FINISH SCHEDULE SYMBOL DESCRIPTION DETAIL / SHEET S-1 CURB AND GUTTER ---- REFER TO ENGINEERING PLANS BY PHB & ASSOC. S-2 CONCRETE WALK REFER TO ENGINEERING PLANS BY PHB & ASSOC. S-3 DECOMPOSED GRANITE W/ BINDER AND 11 LCD -1 BEND -A -BOARD EDGING D.G: CALIFORNIA GOLD AVAIL @: KRC ROCK (krcrock.com) WALL AND FENCE LEGEND REFER TO WALL AND FENCE PLANS SYMBOL LEGEND SYMBOL DESCRIPTION SYMBOL DESCRIPTION ELECTRIC JUNCTION CABINET ELECTRIC SERVICE BOX STREET LIGHT ® ELECTRIC JUNCTION CABINET TRANSFORMER SLAB BOX FIRE HYDRANT 0 0 NOTE: REFER TO SEPARATE CIVIL ENGINEERING PLAN PREPARED BY PHB & ASSOCIATES CONSTRUCTION NOTES: 1. CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND ADJUST AS NECESSARY WHILE MAINTAINING THE DESIGN CONCEPT. 2. CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR TO BEGINNING ANY WORK AND CONTACT LANDSCAPE ARCHITECT FOR AUTHORIZATION IF .MODIFICATIONS ARE NECESSARY. 3. PAVING CONTRACTOR SHALL COORDINATE WITH DRAINAGE CONTRACTOR, IRRIGATION CONTRACTOR AND ELECTRICIAN TO ENSURE THAT ALL SLEEVES AND CROSSINGS ARE PROVIDED PRIOR TO PLACING OF PAVING, CONCRETE, ETC. 4. VERIFY WITH THE PROJECT SOILS ENGINEER THE NEED FOR REINFORCING, BASE MATERIALS, PRESATURATION, ETC., FOR WALKS, PATIOS, FOOTINGS, ETC. 5. EXPANSION JOINTS OCCUR AT BOTTOM OF STEPS, CHANGE IN DIRECTION OF CONCRETE WALKS, ADJACENT TO BUILDINGS AND WHERE NEW CONCRETE PAVING ABUTS EXISTING SIDEWALKS AND/OR CURBS. THE RECOMMENDED SPACING FOR EXPANSION JOINTS IN WALKS IS 16'-0" O.C. FOR CONTINUOUS WALKS UNLESS OTHERWISE RECOMMENDED BY SOILS ENGINEER. 6. SCORE JOINTS OCCUR WHERE SHOWN ON PLAN AND AS NECESSARY TO MINIMIZE AND CONTROL CRACKING OF CONCRETE PAVING. 7. ALL CONSTRUCTION SHALL CONFORM TO ALL LOCAL CODES AND ORDINANCES. 8. ALL PRODUCTION WALKS, STOOPS AND DRIVEWAYS ARE TO RECEIVE A MEDIUM BROOM FINISH UNLESS OTHERWISE NOTED. 9. INISH SURFACE OF CONCRETE TO BE 1/2 MINIMUM BELOW STUCCO SCREED; ERIFY IN FIELD AND ADJUST GRADES IF NECESSARY TO ACHIEVE THIS. 10. TEP TREADS TO BE 12" WIDE (TYPICAL). STEPS GROUPED TWO OR MORE TOGETHER ARE TO RECEIVE HANDRAILS. 11. LL HORIZONTAL CONTROL FOR WALLS OR FENCES BY OTHERS. REFER TO CIVIL ENGINEER'S PLANS. SCALA : I ORTH 0 :20 _. 40 60 80 SUMMERS/MURPHY & PARTNERS, INC LANDSCAPE ARCHITECTS 34197 COAST HIGHWAY, SUITE 200 DANA POINT, CALIFORNIA 92629 (949) 443.1446 FAX (949) 443.1631 VG 14DSC PF G 0. Murph q,Q +s q, Signature 7-31-14 * ne I Datq J'T Date �P �rFOF CAl.1F0�� These drawings and/or the accompanying specifications are the exclusive property of Summers/Murphy & Partners, Inc. and their use and publi— cation shall be restricted to the original site for which they were prepared. Re—use, repro— duction or publication by any method, in whole or part, is prohibited except by written permission from Summers/ Murphy & Partners, Inc. SHEET D CRIPTI N CFD CONSTRUCTION LAYOUT PLAN DESIGNED SMP DRAWN CN CHECKED WP DATE 10/30/13 10B NO. 616005 GD FILE SHEEP NUMBER LC -1 OF 13 SHEETS (V 0 W D 0 W Z CL H Z 2 W Z W 0 O W Z 0 W Zr 9 J 0 ._ O � O O uale Z v Z tr o Z co W 0 tV Z 0 Oo� SHEET D CRIPTI N CFD CONSTRUCTION LAYOUT PLAN DESIGNED SMP DRAWN CN CHECKED WP DATE 10/30/13 10B NO. 616005 GD FILE SHEEP NUMBER LC -1 OF 13 SHEETS (V 0 W D 0 W Z CL H Z 2 W Z W 0 O W Z 0 W J U tr o V co tV Z 0 Oo� V a: cc Q %-%%1 . zcco W 0 00 p O tV V to W a O a. W C� T <z _0 z:5 0 Ma o. U. a. Q NVQ Tco z j.. z . --, o Z Oto, V t!) F- LL. 0 SHEET D CRIPTI N CFD CONSTRUCTION LAYOUT PLAN DESIGNED SMP DRAWN CN CHECKED WP DATE 10/30/13 10B NO. 616005 GD FILE SHEEP NUMBER LC -1 OF 13 SHEETS (V 0 W D 0 W Z CL H Z 2 W Z W 0 O W Z 0