Loading...
HomeMy WebLinkAbout5041-251ERRA AVENUE I EXISTING P4& VAULT WITH SPLICE GANN15TER, ab-SHFO CABLE AND 45-5HFO GABLE ------------- ------ -- — - — - —----- - —-—-—- -—---- -7—C - — - — - ------ LL Z C) OL Z < Lu FOOTHILL BOULEVARD OL O LLI SIERRA AVENUE m LL LU MANOO AVENUE LLJ OL 12-5MFO rl a5 V 2 10 — — — — — — — — — — — — — — — — — — — — ----- - — — — — — — Lu U— > tu 0 z G/- I I I 12-5MFO Z Lu UJ a: > UJ 0(3 T V CD < LLI << q) Lu tu I Lu Lu .... ......... . ......... .............. ...................... I 12-5MFO C) FOOTHILL BOULEVARD � m MANOO AVENUE SHOPPINO OENTER CONSTRUCTION NOTF-5 T Fil INSTALL ab-5MFO CABLE IN EXISTING CONDUIT, UNLE55 OTHEfRHI5E NOTED. F2 INSTALL #bE PULL BOX, UNLESS NOTED OTHERWISE. FURNISH AND INSTALL SPLICE ENCLOSURE AND FU51ON 5PLIGE5IX (b) 5TRANP5 OF 416-5MFO CABLE TO DESIGNATED STRANDS OF LL u� 12-5MFO CABLE PER FIBER ASSIGNMENT 5GHEOULE. d) F31 REMOVE EXISTING PULL BOX AND INSTALL #6 PULL BOX AND INSTALL 4" PVG LEGEND CONDUIT BETWEEN PULL BOXES, COIL 50- OF ab-5MFO CABLE. F 41 INSTALL 3" CONDUIT AND ab-SMFO CABLE. SIGNALIZED INTERSECTION < F5 REMOVE DAMAGED CONDUIT AND INSTALL 1 1/2" RIGID STEEL CONDUIT, LENGTH 7 AS NOTED. ADJUST PULL BOX TO GRADE. 1-61 ry -71 REMOVE DAMAGED PULL BOX LID AND REPLACE WITH NEW.F M Fa -1 INSTALL #&E FULL BOX AND INSTALL 4" PVG CONDUIT BETWEEN TH15 BOX AND EXISTING P45 VAULT. COIL 50' OF ab-5MFO CABLE IN #&E FULL BOX. FURNISH AND INSTALL SPLICE �,E ENCLOSURE AND FUSION SPLICE DESIGNATED 5TRAND5 FROM NEW ab-SMFO CABLE TO EXISTING ab-5MFO CABLE PER FIBER A55IONMENT 5GHEOULE. PLANS PREPARED BY: C.ITY OF FONTANA/ CALIFORNIA 7= I—ql FURNISH AND INSTALL WALL INTERCONNECT CENTER (VslIG).AND SPLICE TRAY IN EXISTING -1 your SIGNAL CONTROLLER CABINET. INSTALL AND TERMINATE DESIGNATED STRANDS OF 12-SMF0 SA extending exendng FIBER OPTIC., INSTALLATION PLAN Engineering reach GABLE PER FIBER ASSIGNMENT SCHEDULE. LIT 151cil CROSSROADS I -ARK Nown-i, SUITE 405 DRAWN BY: SCALE 40' u - FURNISH AND INSTALL FIBER OPTIC MODEMS IN SIGNAL CONTROLLER CABINET. COMPLETE NO.bl 70 BB I Fol INDUSTRY, CA 411146-54dil FOOTHILL BOULEVARD z D DIAL TWO WORKING EXP.06- -15 (�62) 41OZ-6200 CONNECTION BETWEEN WIG AND CONTROLLER MODEM. BEFORE DAYS BEFORE DESIGNED BY: 51ERRA AVENUE TO MAPLE AVENUE DATE: tL YOU Die YOU DIG SoLNOEIRVISION OF: BB 20 10 0 20 40 60 F 1-1 1 REMOVE EXISTING BROKEN PULL BOX AND LID. INSTALL #5 PULL BOX. (OD cjv1\, d) TOLL bOO-22-1-2600 CHECKED BY: APPROVED BY DRAWING NO.: A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT e)11(9113 i�100, DATE: 2 OF ot, DATE ENGR. CITY dDATE VM 4( 5 REV. V F REVISION DESCRIPTION Vone,55e—noz FICE ICITY 'ENGINEER---' R. C. E. 5111/24 A (3