HomeMy WebLinkAbout5041-251ERRA AVENUE
I EXISTING P4& VAULT WITH SPLICE GANN15TER,
ab-SHFO CABLE AND 45-5HFO GABLE
------------- ------ -- — - — - —----- -
—-—-—- -—----
-7—C - — - — - ------
LL
Z
C) OL
Z
<
Lu
FOOTHILL BOULEVARD
OL
O
LLI
SIERRA AVENUE m
LL
LU
MANOO AVENUE LLJ
OL
12-5MFO
rl a5
V 2
10
— — — — — — — — — — — — — — — — — — — — ----- - — — — — — — Lu
U— >
tu 0
z G/- I I I 12-5MFO Z
Lu
UJ
a: > UJ
0(3 T V
CD < LLI
<< q)
Lu
tu I Lu
Lu
.... ......... . ......... .............. ...................... I 12-5MFO
C)
FOOTHILL BOULEVARD � m
MANOO AVENUE SHOPPINO OENTER
CONSTRUCTION NOTF-5 T
Fil INSTALL ab-5MFO CABLE IN EXISTING CONDUIT, UNLE55 OTHEfRHI5E NOTED.
F2 INSTALL #bE PULL BOX, UNLESS NOTED OTHERWISE. FURNISH AND INSTALL SPLICE ENCLOSURE
AND FU51ON 5PLIGE5IX (b) 5TRANP5 OF 416-5MFO CABLE TO DESIGNATED STRANDS OF LL u�
12-5MFO CABLE PER FIBER ASSIGNMENT 5GHEOULE. d)
F31 REMOVE EXISTING PULL BOX AND INSTALL #6 PULL BOX AND INSTALL 4" PVG LEGEND
CONDUIT BETWEEN PULL BOXES, COIL 50- OF ab-5MFO CABLE.
F 41
INSTALL 3" CONDUIT AND ab-SMFO CABLE. SIGNALIZED INTERSECTION <
F5 REMOVE DAMAGED CONDUIT AND INSTALL 1 1/2" RIGID STEEL CONDUIT, LENGTH 7
AS NOTED.
ADJUST PULL BOX TO GRADE.
1-61 ry
-71 REMOVE DAMAGED PULL BOX LID AND REPLACE WITH NEW.F
M
Fa -1 INSTALL #&E FULL BOX AND INSTALL 4" PVG CONDUIT BETWEEN TH15 BOX AND EXISTING P45
VAULT. COIL 50' OF ab-5MFO CABLE IN #&E FULL BOX. FURNISH AND INSTALL SPLICE �,E
ENCLOSURE AND FUSION SPLICE DESIGNATED 5TRAND5 FROM NEW ab-SMFO CABLE TO
EXISTING ab-5MFO CABLE PER FIBER A55IONMENT 5GHEOULE.
PLANS PREPARED BY: C.ITY OF FONTANA/ CALIFORNIA 7=
I—ql FURNISH AND INSTALL WALL INTERCONNECT CENTER (VslIG).AND SPLICE TRAY IN EXISTING -1
your
SIGNAL CONTROLLER CABINET. INSTALL AND TERMINATE DESIGNATED STRANDS OF 12-SMF0 SA extending exendng FIBER OPTIC., INSTALLATION PLAN
Engineering reach
GABLE PER FIBER ASSIGNMENT SCHEDULE.
LIT 151cil CROSSROADS I -ARK Nown-i, SUITE 405 DRAWN BY: SCALE 40' u -
FURNISH AND INSTALL FIBER OPTIC MODEMS IN SIGNAL CONTROLLER CABINET. COMPLETE NO.bl 70 BB I
Fol INDUSTRY, CA 411146-54dil FOOTHILL BOULEVARD z
D
DIAL TWO WORKING EXP.06- -15 (�62) 41OZ-6200
CONNECTION BETWEEN WIG AND CONTROLLER MODEM. BEFORE DAYS BEFORE DESIGNED BY: 51ERRA AVENUE TO MAPLE AVENUE DATE: tL
YOU Die YOU DIG SoLNOEIRVISION OF: BB
20 10 0 20 40 60 F 1-1 1 REMOVE EXISTING BROKEN PULL BOX AND LID. INSTALL #5 PULL BOX. (OD cjv1\, d)
TOLL bOO-22-1-2600 CHECKED BY: APPROVED BY DRAWING NO.:
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT e)11(9113 i�100, DATE:
2
OF ot,
DATE ENGR. CITY dDATE VM 4( 5
REV. V
F REVISION DESCRIPTION Vone,55e—noz FICE ICITY 'ENGINEER---' R. C. E. 5111/24 A (3