Loading...
HomeMy WebLinkAbout5035-2GENERAL NOTES: 1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK"). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED. 2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK", THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION. 3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER. 4. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN THE PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610. 5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES. 7. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OF TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFTY. 8. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE EFFECTIVELY GUARDED BY A SHORING SYSTEM, SLOPING OF THE GROUND OR OTHER EQUIVALENT MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT. 9. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE. 10. LOCATIONS OF PUBLIC UTIU11ES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION. HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION IN THE FIELD OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTIONS TO AVOID INJURY OR DAMAGE THERETO. CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFOR EXCAVATION. 11. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO: GAS, TELEPHONE, ELECTRICAL, LIGHTING, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, 'SEWER, STROM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAY NOTICE PRIOR TO WORK AROUND THEIR FACILITIES. 12. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS. 13. CURVE DATA REFERS TO THE FACE OF CURB. 14. STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE NOTED. 15. ADEQUATE CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONTRUCTION CONTROL STAKING DURING CONSTRUCTION. 16. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER. 17. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT. 18. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES. 19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES. 20. ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES EXCEED 25 MILES PER HOUR. 21. THE CONTRACTOR SHALL NOT NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED INTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURNING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL. 22. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR. 23. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQURE RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED. 24. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS. 25. THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE APPROVED AT THE TIME OF CONSTRUCTION AND SHALL CONFORM TO THE CITY OF FONTANA STANDARDS DETAILS. 26. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING CONCRETE. 27. THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE SEWER LATERAL. GENERAL NOTES (CONT.) 28. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED. 29. ALL UNDERGROUND UTILITES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS. 30. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT. 31. PAVEMENT STRUCTURAL SEC11ONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND APPROVAL OF THE CITY ENGINEER AS DETERMINED BY SOILS TESTED TAKEN AFTER COMPLETION OF ROUGH GRADING. 32. ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE MATERIAL FOR STRUCTURAL STREET SEC11ONS SHALL BE RECOMMENDED BY A GEOTECHNICALREPORT AND SUBMITTED TO THE CITY OF FONTANA FOR APPROVAL UPON COMPLETION OF ROUGH GRADING. 33. ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON COMPLETION OF PAVING. 34. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER. 35. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER. 36. AS BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER. R/W 41.25' - 66' RIGHT-OF-WAY 36' - 58' I 34.5' - 56.5' EXISTING EDGE OF PAVEMENT ��--- ^- 0.0447 S=0.003; ZZZZZ! R/W 41.25' - 75' R/W � RIGHT-OF-WAY 36' - 65' EXISTING CURB AND GUTTER 34.5' - 63.5' EXISTING EDGE OF PAVEMENT 49 29 A V nt TT 0 - 7S=0.01,31 .0445 .:.. ° -z _� � L /_� TYPICAL SECTION - NORTH TURN POCKET N.T.S. � 41.25' - 66' i _ 41.25' - 75' R/W RIGHT-OF-WAY 36' - 58' EXISTING CURB AND GUTTER 34.5' - 56.5' EXISTING EDGE OF PAVEMENT 7 S-0.0034 -- RIGHT-OF-WAY 36' - 65' EXISTING CURB AND GUTTER 34.5' - 63.5' EXISTING EDGE OF PAVEMENT ')' Z� 0.0445 7L// Z��lz .. ° a \/ Zff 1 V y I TYPICAL SECTION - FULL MEDIAN N.T.S. R/W � R/W 41.25' - 66' 41.25' - 75' RIGHT-OF-WAY RIGHT-OF-WAY 36' - 58' 36' - 65' Underground Service Alert SECTION 4216/4217 OF THE GOVERNMENT Y CODE REQUIRES A DIG ALERT IDENTIFICATION NUMBER BE ISSUED BEFORE A PERMIT TOi � EXCAVATE WILL BE VALID ~ No.699M A FOR YOUR DIG ALERT I.D. NUMBER CALL Ev•9-30-08 UNDERGROUND SERVICE ALERT '� c► V %\- ` TOLL FREE 1-800-227-2600 OF TWO WORKING DAYS BEFORE YOU DIG REV. REVISION DESCRIPTION DATE ENGR. CITY DATE WE JOB k 101-16 EXISTING CURB AND GUTTER 34.5' - 56.5' EXISTING EDGE OF PAVEMENT n• A• 2' 4' S=0.0034 - 0.0' EXISTING CURB AND GUTTER 34.5' - 63.5' EXISTING EDGE OF PAVEMENT 5=0.0131 _ 7-��ZZZ - 0.0445 1 ° TT Lzlf TYPICAL SECTION - SOUTH TURN POCKET N.T.S. STREET IMPROVEMENT CONSTRUCTION NOTES: QUANTITIES: 1O CONSTRUCT 8" CURB PER CITY OF FONTANA STANDARD PLAN NO. 1000. . . . . . . . 7,253 LF O2 CONSTRUCT 0.50' OF ASPHALT CONCRETE PAVEMENT OVER 1.0' MINIMUM OF . . . . . . 710 TONS 95% COMPACTED NATIVE SUBGRADE. O3 SAWCUT EXISTING PAVEMENT.. . . . . . . . . . . . . . . . . . . . . 7,553 LF O4 CONSTRUCT 4" ELECTRICAL CONDUIT WITH PULL ROPE.. . . . . . . . . . . . 150 LF O5 CONSTRUCT 6" C900 POLYVINYL CHLORIDE PIPE, CLASS 350.. . . . . . . . . . 150 LF DEMOLITION NOTES: 11 REMOVE EXISTING MEDIAN CURB AND HARDSCAPING.. . . . . . . . . . . . . . 2,365 SF <REMOVE ASPHALT CONCRETE PAVEMENT AND UNDERLYING PCC CONCRETE . . . . . . 55,110 SF PAVEMENT AS REQUIRED. SIGNING AND STRIPING CONSTRUCTION NOTES: 1O APPLY THERMOPLASTIC, 8" SOLID WHITE STRIPE, DETAIL 38. O2 APPLY THERMOPLASTIC, 12" SOLID WHITE CROSSWALK LINE. O3 APPLY THERMOPLASTIC, DOUBLE YELLOW LINE STRIPING PER CALTRANS STANDARD PLAN A20A, DETAIL 29. ® APPLY THERMOPLASTIC, LANE STRIPE, DETAIL 14A. O5 APPLY THERMOPLASTIC, TYPE IV ARROW AS SHOWN. © FURNISH AND INSTALL SIGN AS NOTED. O7 APPLY THERMOPLASTIC, 4" SOLID WHITE STRIPE, DETAIL 38. DETECTOR LOOP NOTES: ( FURNISH AND INSTALL TYPE E DETECTOR LOOPS AND DLC TO EXISTING PULLBOX AS SHOWN PER CALTRANS STANDARD PLAN ES -513. MODIFY SPACING PER PLAN. LEGEND: °:• EXISTING SIDEWALK EXISTING AC PAVEMENT A°►` PROPOSED CURB PROPOSED AC PAVEMENT 0 NATIVE GROUND TKE ENGINEERING, INC. SHOULD CONSTRUCTION OF THE 4446 CENTRAL AVENUE STREET IMPROVEMENTS REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF RIVERSIDE, CA 92506 FOOTHILL BOULEVARD APPROVAL SHOWN HEREON AND CARRIED DRAWM BY (951) 680-0440 FORTH IN A DILIGENT MANNER, THE CITY' IVEERING FAX (951) 80-0490 OLEANDER AVENUE TO SIERRA AVENUE ENGINEER MAY REQUIRE REVISIONS TO DESIGNED BY 31Z�, THE PLANS TO BRING THEM INTO TMR \ - T. RRY M. RENNER R.C.E. No. 69984 PHASE II CONFORMANCE WITH CONDITIONS AND CHECI® BY: EXPIRES: 9-30-08 STANDARDS IN EFFECT. MPT CITY OF FONTANA, CALIFORNIA STREET IMPROVEMENT PLANS FOOTB` HILL BOULEVARD MEDIAN IMPROVEMENTS SCA AS SHOWN NOTES AND SECTIONS DAT; MAR. 2007 17CV BY DATE: DRAWING NO.: •/r-�� 5©35 2 7 ENGINEER R.C.E. No. 51152