Loading...
HomeMy WebLinkAbout4773-1t U t -- m 0 ( Com; m d- Co 00 CD cc 0 S TREE T IMPR 0 VEAlfEN NS SO,. HIGHLA ND A VE. & SAN SE VA INE CONSTRUCTION NOTES 1U CONSTRUCT 8" CURB & GUTTER PER CITY STD. 1000 O2 CONSTRUCT 6.5" THK. (MIN.) A.C. PAVEMENT OVER 12" MIN. OF 95% COMPACTED NATIVE SOIL O3 CONSTRUCT COMMERCIAL DRIVEWAY PER CITY STD. 1002 (4 SAWCUT EXISTING A.C. PAVEMENT TO FORM SMOOTH JOIN PER DETAIL, SHT. 1 O5 CONSTRUCT P.C.C. SIDEWALK PER CITY STD. 1006 © CONSTRUCT ACCESS RAMP PER CITY STD. 1003 (D RELOCATE EXISTING POWER POLE ® CONSTRUCT CATCH BASIN PER CITY STD. 3004, WIDTH PER PLAN Og CONSTRUCT LOCAL DEPRESSION AT CATCH BASIN PER CITY STD. 3003, CASE "B" 10 INSTALL 24"0 R.C.P. STORM DRAIN PIPE 10a CONSTRUCT MANHOLE PER CITY STD. 3013 11 INSTALL STREET LIGHT 22,000 LUMEN HPSV (200 WATT; #20) LUMINARE ON 8' MAST ARM ON 30' MARBLELITE POLE, OR EQUAL, PER CITY OF FONTANA STD. DWG. NO. 404 12 INSTALL STREET LIGHT 16,000 LUMEN HPSV (150 WATT; #15) LUMINARE ON 8' MAST ARM ON 30' MARBLELITE POLE, OR EQUAL, PER CITY OF FONTANA STD. DWG. NO. 404 NOTE: THE QUANTITIES ARE NOTED ON THIS PLAN BY THE ENGINEER SOLELY AS AN ESTIMATE OF THE WORK REQUIRED FOR THE PROJECT. THE CONTRACTOR IS HERE -BY NOTIFIED TO PROVIDE A BID BASED ON HIS OWN DETERMINATION OF QUANTITIES AND A COMPLETE JOB. PRIVATE ENGINEER'S NOTICES TO CONTRACTORS THE EXISTENCE AND APPROXIMATE LOCATION OF ANY UNDERGROUND UTILITIES OR STRUCTURES SHOWN ON THESE PLANS ARE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE, THERE ARE NO EXISTING UTILITIES OR STRUCTURES EXCEPT AS SHOWN ON THESE PLANS. THE ENGINEER ASSUMES NO LIABILITY AS TO THE EXACT LOCATION OF SAID LINES NOR FOR UTILITIES OR IRRIGATION LINES WHOSE LOCATIONS ARE NOT SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL UTILITY AND IRRIGATION COMPANIES PRIOR TO WORK ON EXCAVATION TO DETERMINE EXACT LOCATION OF ALL LINES AFFECTING THIS WORK, WHETHER OR NOT SHOWN HERON, AND FOR ANY DAMAGE OR PROTECTION OF THESE LINES. THE CONTRACTOR SHALL CALL IN A LOCATION REQUEST TO USA (UNDERGROUND SERVICE ALERT) TWO DAYS PRIOR TO EXCAVATION ON THIS PROJECT. TOLL FREE 1-800-422-4133 NO CONSTRUCTION PERMIT ISSUED BY PUBLIC WORKS DEPARTMENT SHALL BE VALID INVOLVING UNDERGROUND FACILITIES UNLESS THE APPLICANT HAS AN INQUIRY IDENTIFICATION NUMBER ISSUED BY U.S.A. PRIVATE ENGINEER'S NOTE THE PRIVATE ENGINEER SIGNING THESE PLANS IS RESPONSIBLE FOR ASSUMING THE ACCURACY AND ACCEPTABILITY OF THE WORK HEREON. IN THE EVENT OF DISCREPANCIES ARISING DURING CONSTRUCTION THE PRIVATE ENGINEER SHALL BE RESPONSIBLE FOR DETERMINING AN ACCEPTABLE SOLUTION AND REVISING THE PLANS FOR APPROVAL BY THE CITY. BASIS OF BEARINGS THE NORTH LINE OF THE NORTHEAST QUARTER OF SECTION 35, TOWNSHIP 1 NORTH, RANGE 6 WEST, SAN BERNARDINO MERIDIAN, SHOWN AS N 89'39'56" W ON TRACT MAP NO. 16078, FILED IN BOOK 281, PAGES 69 THROUGH 72, INCLUSIVE, OF MAPS, RECORDS OF SAN BERNARDINO COUNTY. CITY OF FON TANA QUANTITIES 682 L.F. 14,700 S.F. BENCH MARK: CALTRANS BENCHMARK NO. 8-17 BRASS CAP IN CONCRETE S.C.E. TOWER LEG 343' N/0 HIGHLAND AVE., 0.20 MI. W/O SAN SEVAINE RD. IN SOUTH CONCRETE BASE OF S.C.E. TOWER 19.5', 2.65 MI. W ALONG HIGHLAND AVE. FROM SIERRA AVE. ELEVATION: 1428.6090 (FT.) 2 EA. 1,207 L.F. 4,950 S. F. 1 EA. 1 EA. 2 EA. 2 EA. 57 L.F. 2 EA. 2 EA. 3 EA. LEGEND -- CENTERLINE - - - - PROPERTY LINE & RIGHT-OF-WAY LINE EXISTING CURB, GUTTER OR SIDEWALK PROPOSED CURB, GUTTER OR SIDEWALK - - - --- - - - - EDGE OF PAVEMENT O SMH SEWER MANHOLE AC ASPHALT CONCRETE PCC PORTLAND CONCRETE CEMENT G GUY ANCHOR bi > Q BASELINE RD. POWER POLE > Q PROPOSED A.C. PAVING Z Q PROPOSED CONCRETE PAVEMENT TC TOP OF CURB FL FLOW LINE FS FINISHED SURFACE C.B. CATCH BASIN D/W DRIVEWAY PROPOSED FIRE HYDRANT VICINITY MAP 210 FRWY SO. CALIFORNIA EDISON COMPANY (800) S. HIGHLAND AVE. 9500 CLEVELAND AVE PROJECT SITE RANCHO CUCAMONGA, CA GAS: W (909) 889-9711 Z 16231 VALLEY BLVD. bi > Q BASELINE RD. w cn > Q >_ Of Z Q 2 U m LTJ v7 W W U m UTI LITI ES O `1r' 14907 Ll -i SO. HI GHLA ND LLJ V) I I SHEET 2 OF 3 I SO. HIGHLAND A VE. _ / TRACT 17824 N.T.S. ELECTRICITY: SO. CALIFORNIA EDISON COMPANY (800) 684-8123 9500 CLEVELAND AVE RANCHO CUCAMONGA, CA GAS: SO. CALIF. GAS COMPANY (909) 889-9711 16231 VALLEY BLVD. FONTANA, CA 92335 SO. CALIF. GAS COMPANY (909) 529-2889 TRANSMISSION DIVISION 2191 E. BIRCH ST. BREA, CA 92621 TELEPHONE: SBC (962) 999-5639 3939 E. CORONADO ST. ANAHEIM, CA 92807 WATER: FONTANA WATER CO. (909) 822-2201 8440 NUEVO AVE. FONTANA, CA SEWAGE: CITY OF FONTANA (909) 350-6632 8353 SIERRA AVE. FONTANA, CA 92335 WARNING!!!! THE LOCATION AND ELEVATION OF EXISTING PIPELINES SHOWN ON THESE PLANS ARE APPROXIMATE ONLY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXACT LOCATION AND ELEVATION OF THE PIPELINES PRIOR TO ANY GRADING OR CONSTRUCTION NEAR EXISTING PIPELINES. TOLL FREE -800-227-2600 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT REV. REVISION DESCRIPTION Gvl INDEX MAP N.T.S. GRIND 0.10' MIN. 5' 11 SAWCUT & REMOVE EXIST. PAVEMENT & EXIST. PAVEMENT OVERLAY 0.10' MIN. MIN. MIN. REIviOVE REDWOOD HEADER WHERE APPLICABLE 7F _yff _ /� I NEW PAVEMENT yl EXISTING PAVEMENT REMOVE EXIST. A.C. DIKE WHERE APPLICABLE JOIN DETAIL N.T.S. STREET IMPROVEMENT INDEX SHEET 1: TITLE SHEET SHEET 2: SO. HiGH __AND AVENL'F PLAN & PROFILE SHEET 3: SAN SEV� .NE ROAD PLAN & PROFILE DATE I ENGR. I CITY I DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND STANDARDS IN EFFECT. GENERAL NOTES 1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK"). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED. 2. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909)350-7610. 3. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS. 4. CURVE DATA REFERS TO THE FACE OF CURB. 5. STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE NOTED. 6. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS. 7. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION. HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-422-4133 TWO WORKING DAYS BEFORE EXCAVATION. 8. ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE CANS SHALL BE CONSTRUCTED 6" BELOW FINISH GRADE BY SEWER CONTRACTOR AND SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON COMPLETION OF PAVING. 9. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES 10. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER. 11. TYPE, LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE DETERMINED AT THE TIME OF CONSTRUCTION AND SHALL CONFORM TO THE CITY OF FONTANA STANDARD DETAILS. 12. WHEN CONFLICT IF FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK", THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION. 13. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL ASPHALT PAVEMENT PRIOR TO PLACEMENT. 14. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO ALL ADJOINING CURBS AND SIDEWALKS. 15. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED. 16. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT. 17. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY. 18. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR. 19. THE CONTRACTOR SHALL BE CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT-OF-WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL. 20. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL AT ALL TIMES. 21. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED. 22. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER. 23. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION. 24. CARE SHOULD BE TAKEN TO PREVENT GRADES DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY GUNITE SWALES ENTERING OR LEAVING IMPROVEMENTS. 25. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCHMARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER 26. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCHMARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT. 27. PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND APPROVAL OF THE CITY ENGINEER AS DETERMINED BY SOILS TESTS TAKEN (BY DEVELOPER'S GEOTECHNICAL ENGINEER) AFTER COMPLETION OF ROUGH GRADING. SHOULD THE STREET CONSTRUCTION START MORE THAN 3 MONTHS AFTER THE PLANS ARE APPROVED AND IF FIELD CONDITIONS CHANGE; THEN THE DEVELOPER SHALL BE REQUIRED TO UPDATE THE DESIGN TO ACCOMMODATE ACTUAL FIELD CONDITIONS. 28. ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE MATERIAL FOR STRUCTURAL STREET SECTIONS SHALL BE RECOMMENDED BY A GEOTECHNICAL ENGINEERING REPORT AND SUBMITTED TO THE CITY OF FONTANA FOR APPROVAL UPON COMPLETION OF ROUGH GRADING. THE PROJECT DEVELOPER IS IN GENERAL, REQUIRED TO BRING HIS HALF STREET SECTION FRONTAGES UP TO A 20 YEAR DESIGN LIFE BETWEEN SITE PROPERTY LINES, PLUS REASONABLE JOINS TO EXISTING PAVEMENT SUBJECT TO FINAL APPROVAL. 29. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CLOSURE AREA FOR RESIDENTS AND EMERGENCY VEHICLES. 30. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT-OF-WAY WITHOUT PRIOR APPROVAL OF THE INSPECTOR. 31. THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE SEWER LATERAL. 32. THE CONTRACTOR SHALL PROVIDED AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES. 33. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE "W.A.T.C.H. MANUAL", LATEST EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER. 34. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER. 35. ALL PIPES OR SUBSTRUCTURES OF ANY KIND AND ALL TELEPHONE OR POWER POLES, WATER METERS, VALVES, HYDRANTS, IRRIGATION STRUCTURES, ETC., SHOWN OR NOT SHOWN ON THIS PLAN AND LOCATED WITHIN AREAS TO BE IMPROVED AND INTERFERING WITH CONSTRUCTION, SHALL BE RELOCATED BY OTHERS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY ALL OF THE AGENCIES CONCERNED BEFORE CONSTRUCTION BEGIN. 36. ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES EXCEED 25 MILES PER HOUR. 37. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER. 38. CONTRACTOR TO INSTALL PAVEMENT MARKINGS AND STRIPING AS REQUIRED BY THE TRAFFIC CITY ENGINEER. 39. IS EXISTING FACILITIES CONFLICT WITH THE PROPOSED IMPROVEMENTS, WORK SHALL STOP AND ENGINEER NOTIFIED IMMEDIATELY. 40. BACKFILL MATERIALS SHALL BE VERIFIED BY CONTRACTOR AND APPROVED BY PUBLIC WORKS INSPECTOR PRIOR TO THE PLACEMENT OF ANY PERMANENT PAVEMENT. 41. REFER TO THE CITY OF FONTANA, UNDERGROUND UTILITY LOCATION STANDARD DETAIL NO. 129. 42. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE ENGINEER AFTER THE BASE COURSE OF PAVEMENT HAS BEEN CONSTRUCTED AND BEFORE THE FINAL PAVING CAP HAS BEEN INSTALLED SO THAT THE ENGINEER MAY INSTALL THE STREET CENTERLINE MONUMENTS AS REQUIRED BY THE CITY OF FONTANA. ;� GUTIERREZ u � No. 28501 'Qr_�EXP. 3-31-10 1� i Prepared Under The Supervision Of : SANDERSON-GUTIERREZ CML ENrl-AlEERS & LAND SURVEYORS, INC DRAWN BY: 10050-A b TH STREET, RANCHO CUCAMONGA, CA 91730 CAT (9n9) 980-1211 J.N 06-038 ate LOUIS UTIERREZ R.C.E. 28501• D`.-IGNED BY: EBB - - CHECKED BY- /31/10 Y:/31X10 LTG CITY OF FONTANA, CALIFORNIA STREET IMPROVEMENT PLAN 14907 S0. HIGHLAND DR07-035/CUP 07-026 TITLt/��.HEET .C. ?f rc DATE: SCALE: 1" = 20' DATE: 6/5/07 DRAWING NO.: 1 4773 3