HomeMy WebLinkAbout4763-1SIERRA GUARD RAIL PHASE II
GENERAL NOTES
1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS, CALTRANS STANDARD PLANS
DATED JULY 2006, AND THE SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK-). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL
BE THE LATEST EDITION UNLESS OTHERWISE NOTED.
2. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.
3. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT AND ENGINEERING DIVISION PRIOR TO START OF WORK.
INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN IN PUBLIC RIGHT OF WAY WITHIN THE CITY LIMITS
CALL (909) 350-7610
4. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC
CONTROLS, LATEST NON—METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY ENGINEER.
5. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES.
6. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE.
7. THE LOCATION OF UTILITIES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF
ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE
ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION.
8. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION,
LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE
GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES.
9. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION.
10. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER.
11. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCH MARKS, SHALL BE DONE BY THE CITY.
SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE
WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT.
12. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY
ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL.
r
ILOPE Z 00 2 4
SIERRA 5a
w F_
EX. R/W m � — —
EX. AC CURB
0
89+00
— — 86+00 — — —
87+00
7 0 — — s8ioo�_ — —
EX. AC CURB
EX. R/W
GENERAL NOTES (CONT.)
13. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE—WORKING OF THAT PORTION OF
THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED.
14. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER
MAY REQUIRE TEMPORARY NON—ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS.
15. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE
SATISFACTION OF THE CITY ENGINEER.
16. AS—BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE CITY ENGINEER.
17. CONTRACTOR SHALL EXPOSE AND PROTECT IN PLACE EXISTING ADJACENT IRRIGATION SYSTEMS. MODIFY IRRIGATION AS NECESSARY TO ACHIEVE PROPER METAL
BEAM RAILING INSTALLATION.
CONSTRUCTION NOTES:
aINSTALL METAL BEAM GUARD RAILING PER CALTRANS STD
PLAN A77E3, TYPE 11G LAYOUT.
a INSTALL END TREATMENT, BURIED POST
ANCHOR PER CALTRANS STD PLAN A7712.
3] INSTALL METAL BEAM GUARD RAILING DELINEATION AT 50'
SPACING PER CALTRANS STD PLAN A77C4. REFLECTORS TO BE
WHITE.
® CLEAR, GRUB AND GRADE EXISTING VEGETATION AS
NECESSARY TO ACHIEVE PROPER SUPPORT MATERIAL.
INSTALL METAL BEAM GUARD RAILING TYPE SRT END
TREATMENT.
SECTION A -A
Project
Location
LV
LL
Q
JURUPA AVE JURUPA AVE
W
JURUPA HILLS O
REGIONAL PARK (`^^
v1
VICINITY MAP Q
Q
EX. CONCRETE
AVE14UE ENCASED DRAIN.
f2.5' DIA. EX. R/W
Toe of Slope-
1':�..1.: O
Hinge Point — — '• r
— — — — EX. AC CURB
A _ZLd
-J co
A 94 00 95100 — — 96 J O
00
0 w
00 s2+00 —
90+00 --- EX. C&G
ao
00 — — —
�n — — — —
LO _ _ — — EX. R/W
— M
o(0
of +
Q N
0 O
AVENUE o<
w cn
-- -- -- —
Hinge Poin---
Toe of Slope
g
CUT SLOPE
37'
REGIONAL
PARK
EX. DRAIN I EX. R/W — — —_ — ------ I 1 11 11111 I C11 s
t 10' DIA. —�
_ ,
Toe of Slope EX. C&G
— ' A 4 5
7::
1
103+00 — — -
s� EX. AC CURB 101+00 — — 102+00
— — 104+00
I—
to -CO
98+00
W
JW oo
0�- — ,
�� � EX. R/W
A Q SHOULD CONSTRUCTION OF THE REQUIRED
LEGEND ���11 n IMPROVEMENTS NOT COMMENCE WITHIN TWO
0 EXISTING SPRINKLER HEAD
*See General Note No. 17
AUTOCAD FILENAME: SIERRA GUARDRAIL PHASE Il.dwg
vl
W �
Z J
W
> C�
a z
Q
Q
V
Q
Q
m W
� Op
7 � J
1 " = 40' Q
40 20 0 40 80 120 W