Loading...
HomeMy WebLinkAbout4752-4E!\Projects\07 773-1167PHELANJURUPASUSCTR\HLDRW(16\ge.ech—Mediari4IPRIGAVONDETAILS,dv4, 9111/260812:MSI PM, HPDesigMetSRO FAS7,pc-.3 `{76 1 It• 1 L J FINISH GRADE . .......... F. -O ........ CONC. WALK POP—UP SHRUB HEAD WALK OR CURB RISER PLAN VIEW OR CURB 1 /2" MAIN OR LATERAL LINE FINISH GRADE PTION 4% FINISH GRADE TEE OR ELL ELEVATION ELIE 12" NIPPLE > A A 1.L.1, T_T't AW NIPPLE SIZE TO MATCH HEAD SIZE q HI POP SHRUB HEAD.— F I'If 1174=11 1,1 11=;a TEE' OR ELL 12' MAIN OR LATERAL LINE TYP. CONCRETE TO REST ELEVATION SCH 80 PVC NIPPLE THREADED. BOTH ENDS• MARLEX STREET ELL(PRIVATE) AGAINST UNDISTURBED PVC STREET ELL PVC STREET ELL(PUBLIC) SOIL PVC PVC STREET 'ELLS LATERAL LINE WITH NIPPLE SIZE TO, MATCH HEAD SIZE ,,000 PVC TEE OR ELL PLA -MARLEX STREET ELL(PRIVATE) P DOUBLE SWING JOINT t SCR 40 PVC STREET ELL(PUBLIC) 31 2 EA. PVC STEET ELLS SCHEDULE 40 STREET ELL SCHEDULE 80 PVC RISER 4 NOTE: TYP. CONCRETE 0 INSTALL 12" SHRUB POP—UP HEAD 1 1/2 THRUST BLOCKS ROTE: -ABOVE F.G. INSTALL HI—POP IRR. HEAD.1 1/2- ABOVE F.G.' 0 •F.G. — 1 1/2" BELOW WALK OR. CURB NOTE: ALL PIPE AND FITTINGS SHALL BE SCHEDULE F.G. 1 1-/2" BELOW HARDSCAPE 4 0 PVC UNLESS. OTHERWISE SPECIFIED 'RE15-A K DETAIL CHECK VALVE FOR LOW HEAD DRAINAGE USE - PVC STREET ELLS W/TEFLON TAPE FOR ALL PUBLIC JOBS INSTALL CHECK VALVES FOR LOW HEAD DRAINAGE •0 NOTE: THRUST BLOCKS SHALL BE IN -STALLED IN, ACCORDANCE WITH PIPE MANUFACTURER'S RECOMMENDATION FOR SIE OF PIPING REQUIRED. Z J. UTILIZED IN -ALL (2 1/2" AND LARGER MAINLINE PIPE) .#3 REBAR TO BE PLACED AROUND" PIPE INTO THRUST :BLOCK TY -P. w APPROVED BY: -CITY- OF- FONTTANIA ESSI APPROVED BY: volESst MY OF FONTANA. AP oRovem-BY: -ANA CITY OF. FONT APPROVEUBY: CITY OF FONTANA •-A4 Nn 25126 CITY -ENGINEER DATE: Zrry ENGINEER1&1'(- No. 25126 DATE: LAWN 4�'ro 5HK-U[5 POP-UP HEAD Ac ENGINEER DA -TE: Na11& 25125 ROSERTW.WED' SWING JOINT DLE Na 251-26 CITY ENGINEER DATE: THRU-15T.13LOCK ROBERT W. WEDDLE .4 Mr. I 1/01 HI- POP 5HRUE5 HEAD ROsmRTw wrrbDLE -DRAVW, BY: 11MOTHY RA5TEDT rvo villu"phs DRAWN, BY: __�DIAQTHY RASTEDT, ROBERT, W. VVEDDLE EXP. DRA~-SY: TIMOTHY RASTEDT, A55EMOLY J ORAWN BY: TIMOTHY RA5TIEDT if FF DATE,OF LAST R&M810k: or 'WE DATE OF LAST REVISION. 10 PLAR, No. 523 SHT. Fi. I DATE REVISION: STD. PLAX-NO. 1OF1 DATE OF. LAST -REVISION: STD LA. -NO.! 10171 chirSTD STD, PLAN NO. 524- SHT. I 0 -Ir I SHOULD CONSTRUCTION OF THE REQUIRED 0 ITY OP FONTANA9 CALIFORNIA • IMPROVEMENTS NOT COMMENCE WITHIN TW 0 BEECH AVENUE MEDIAN BENCH MARK* HUNTER LANDSCAPE cm FO AM'Mr* YEARS OF THE DATE OF. APPROVAL SHOWN HEREON; AND: CMMD FORTH IN A DIUGENT MANNER THE F;ww—a oit_m AS NOTED rKZPmWWN OR n Detail' Ir S atr9 SAN KRNARDINQ COUNTY TBM PER FIELD B(X* 4015/M�Jr Pbov* Cdfoi* =70-M. C" ENGINEER" REQUIRE REVISIONS TO THE. PATE Aug 26, 2008 ELEVATION 1019.83, DATUM 1929 Ftc 7%,OW2400 0 PLANS TO BRING THEM IWO CONFORMANCE WITH ct�ru4 By.. RAILROAD SPIKE IN POWER POLE #71833, N.E. CORNER POPLAR AVE. & SANTA ANA AVE. MT. FROM 9M 8 –38, Pox, 714M2408 *LL E&cj2ff=D Z�EINQIQC_a:� .14-1 KA �Ww co STANDARDS IN EFFECT. PAM ---------- 2- - REV. DESCRIPTION DATE j om. CITY 'I DATE I R R. 51 M DATE E!\Projects\07 773-1167PHELANJURUPASUSCTR\HLDRW(16\ge.ech—Mediari4IPRIGAVONDETAILS,dv4, 9111/260812:MSI PM, HPDesigMetSRO FAS7,pc-.3 `{76 1 It• 1