HomeMy WebLinkAbout4752-12
a
Ln
et:
o)
M
v
0
14
0
J
r
23
W
Sheet Index
D
B I CHAV EN
U E
Cover Sheet
oFE
.1
2
Irrigation Plan
3
Irrigation Details
MED N
4
Irrigation Details
5
Planting Plan
6
Planting Details
LANDSCAPE PLANS
7
Specifications
8
Specifications
Y
9
Specifications
Fontana, a
ABBREVIATIONS
General Notes
Field Inspection Requirements
Vicinity Map
ACASPHALT
CONCRETE
PIP
POURED IN PLACE
IRRIGATION
CJ COLD JOINT PROPERTY LINE
THE CONTRACTOR SHALL CONTACT THE CITY'S COMMUNITY DEVELOPMENT ENGINEERING DEPT.
ONC
CENTERLINE
CONCRETE
R or RAD
R
RADIUS
RISER
1. FINAL LOCATION OF CONTROLLER TO BE DETERMINED IN THE FIELD WITH APPROVAL OF OWNER AND LANDSCAPE
ARCHITECT.
PUBLIC WORKS INSPECTION SECTION (909)350-6633 AT LEAST 48 HOURS TO INSPECT THE
CONT
DIA
CONTINUOUS
DIAMETER
RWD
RS
REDWOOD
ROUGH SAWN
2. REFER TO GENERAL IRRIGATION NOTES ON IRRIGATION PLAN.
FOLLOWING::
1. PRE -JOB CONFERENCE ONSITE.
D.F.
DOUGLAS FIR
SL
SCORELINE
2. COMPLETION OF FINISHED GRADE.
L1J
EA
EJ
EACH
ION JOINT
SHT
SPQECS
SHEET
ATIONS
PLANTING
3. LAYOUT OF WOOD OR CONCRETE HEADERS BUT PRIOR TO INSTALLATION.
EQ
EQUAL
SQUASPECIRE
4. IRRIGATION INSTALLATION AT HE FOLLOWING POINTS:fi
EXIST.
FRH
EXISTING
FIRE HYDRANT
STD
STRUCT
STANDARD
STRUCTURAL
1. ALL BOX TREES ARE TO BE SELECTED BY THE LANDSCAPE ARCHITECT.
A. POINT OF CONNECTION TO MAIN.
B. BACKFLOW PREVENTION INSTALLATION PRIOR TO BACKFILL.
FS
FT
FINISH SURFACE
FEET
S4S
T
SURFACE FOUR SIDES
TREAD
2. CONTRACTOR IS TO SPOT ALL PLANT MATERIAL AND HAVE LANDSCAPE ARCHITECT APPROVE THE SPOTTING PRIOR TO THE
C. TRENCHING (TO CHECK DEPTH).
Q
FTG
FOOTING
THK
THICK
EXCAVATION OF ANY PLANT PIT. ALLOW 48 HOURS LEAD TIME. ANY TREE, SHRUB, OR VINE THAT IS PLANTED WITHOUT
D. METER AND CONTROLLER PEDESTAL LOCATION.
CL
GA
GAUGE
TOC
TOP OF CONCRETE or CURE
APPROVAL OF THE LANDSCAPE ARCHITECT MAY BE MOVED AT THE CONTRACTOR'S EXPENSE.
E. CONTROL VALVE INSTALLATION.
GALV
GB
GALVANIZE(D)
GRADE
TYP
TOW
TYPICAL
TOP OF WALL
3. REMOVE STAKES FROM ALL ESPALIERS AND VINES AND ATTACH TO WALLS, POST, ETC.
F. MAINLINE INSTALLATION WITH PRESSURE TEST AT 150 PSI FOR 4 HOURS.
HP
HIGH POINT
TOF
TOP OF FOOTING
G. HEAD AND SWING JOINT INSTALLATION.
-
--Xm
MAX
MIN
MAXIMUM
MINIMUM
LINO
VEH
UNLESS NOTED OTHERWISE4.
VEHICULAR
PRIOR TO PLANTING INSTALLATION, CONTRACTOR SHALL HAVE SOIL TESTED AND SEND RESULTS TO PUBLIC WORKS
H. HEAD COVERAGE.
NIC
NOT IN CONTRACT
VERT
VERTICAL
INSPECTOR. REFER TO SPECIFICATIONS FOR SOIL PREPARATION INFORMATION.
I. SLEEVING.
NTS
OC
NOT TO SCALE
ON CENTER
WWM
Wl
WOVEN WIRE MESH
WROUGHT IRON
5. CONTRACTOR TO CONTACT LANDSCAPE ARCHITECT AND CITY INSPECTOR FOR FINAL INSPECTION WHEN INSTALLATION
5. WEED ABATEMENT.
6. ACCEPTANCE OF PLANT QUALITY AT DELIVERY SITE.
i
---
PA
PLANTING AREA
d
NAIL PENNY SIZE
IS COMPLETE, AND FOR A FINAL MAINTENANCE INSPECTION AT THE END OF THE MAINTENANCE PERIOD.
7. PLANT LAYOUT.HULL
?z
MAINTENANCE NOTES
8. PLANT INSTALLATION.
9. FINAL INSPECTION.
,
1. ALL CFD/LMD AREAS ARE TO BE MAINTAINED BY THE CONTRACTOR/DEVELOPER FOR A PERIOD OF 90 DAYS AND REQUEST
A WALK-THRU EVERY 30 DAYS BY THE PUBLIC WORKS INSPECTION SECTION, ENGINEERING DIV. COM. DEV. DEPT.
2. ALL AREAS MUST BE MAINTAINED IN A HEALTHY, WEED FREE, AND VIGOROUS CONDITION PRIOR TO ACCEPTANCE BY THE CITY.
-.
Turnover Items
•
3. A MINIMUM OF ONE PUNCH LIST WILL BE DEVELOPED BY THE CITY TO NOTE DEFICIENCIES TO BE CORRECTED PRIOR
TO
ACCEPTANCE.
Hold Harmless & Indemnification Clause
"AS-BUILTS"
1. PHOTO MYLAR
2. LAMINATED CONTROLLER CHARTS.
CONTRACTOR AGREES THAT HE SHALL ASSUME SLOE RESPONSIBILITY FOR JOB SITE CONDITIONS
3. BACKFLOW CERTIFICATION.
DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS
4. QUICK COUPLER KEYS WITH SWIVEL HOSE ADAPTER
AND PROPERTY, THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO
5. CONTROLLER KEYS (2)
NORMAL WORKING HOURS, AND HOLD THE CITY AND THE LANDSCAPE ARCHITECT HARMLESS
6. VALVE BOX KEYS (2)
FROM ANY AND ALL LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER, CITY OR
7. 1 YR. WRITTEN IRRIGATION GUARANTEE - INCLUDE COMPANY NAME, CONTACT PERSON,
LANDSCAPE ARCHITECT.
TELEPHONE NUMBER AND BUSINESS ADDRESS.
SHOULD CONSTRUCTION OF THE REQUIRED
IMPROVEMENTS NOT COMMENCE WITHIN TWO
O
�oVNNSc�p�
�- ��g,
CITY OF FONTANA, CALIFORNIA
BEECH AVENUE MEDIAN
OF THE DATE OF APPROVAL SHOWN HEREON
BENCH MARK:
HUNTER LANDSCAPE
711 S. FeeAna Street
YEARS
AND CARRIED FORTH IN A DILIGENT MANNER, THE
W o -
MVM 9f.
CO Sheet
sciuF:
NOTED
FPAM u� 7W �, OR
°�D 81'`
DAM
SAN BERNARDINO COUNTY TBM PER MD BOOK 4015/848
•
Placentia, California 92870-6706
arl lrro
Mts ifON:
CITY ENGINEER MAY REQUIRE REVISIONS TO THE
AW 26, 2008
ELEVATION ' 1016.83 • DATUM ' 162°
�� SPIKE � PowER POLE M!WF- coRNER
Ph: 714.986.2400
you w rou oeo
PLANS TO BRING THEM INTO CONFORMANCE WITH
�P
r e.�
� of cA�`F°
RECORD DRAWINGS
5130
cN� �'�'i
°�N0N0»
�POKM
AVE. & SANTA
ANA AVEBM 8-36.
Fax: 714.986.2408
� rsa � � saw sr
.5.1
�
STANDARDS IN EFFECT.
aM
4752
9
REV.
DESCRIP110N
DATE
OCR.
CITY
DATE
ENGMEER R.C.E. 51152 DATE
r
23
W