Loading...
HomeMy WebLinkAbout4290-1N SCALE 1"=40' I-------------/ rrr V w 0 m Q w w w O O O O co lf� 1 w Z J U Q w�� why O O POPLAR AVENUE VALLEY EXIST. CURB & GUTTER EXIST. CURB & GUTTER BOULEVARD N SCALE 1"=40' F1 INSTALL 6-1.5" SCHEDULE 40 HDPE CONDUITS PER DETAIL "C", WITH ORANGE YELLOW, RED, BLACK, BLUE AND GREEN CONDUITS AND PULLROPE (NO CABLE). F2 INSTALL PULLBOX, P48 �Q?'OFESS/pN 3 INSTALL 2" CONDUIT TO CONTROLLER (WITH PULLROPE) o 0,01- V�N� �S' Fye c z C-9 � No. 37356 `w m cf- Exp. 6-30-2010 `P�q> CIVIL F OF CNS-�F� Underground Service Alert Call: TOLL FREE 1-800 227-2600 TWO WORKING DAYS BEFORE YOU DIG "CA.,NYON C O N S U L T f IY G PLANNING • ENGINEERING • SURVEYING 11860 PIERCE ST., SUITE 200, RIVERSIDE, CA 92505 951/343-8686 VOICE, 951/343-9931 FAX Q "RECORD DRAWING" REV. REVISION DESCRIPTION LL w J> O J w m w w O O O d" co L0 Q 1 w Z J U Q INTERCONNECT GENERAL NOTES: 1. ALL INTERCONNECT WORK SHALL CONFORM TO THE STATE OF CALIFORNIA STANDARD SPECIFICATIONS SECTION 86 AND STANDARD PLANS (DATED MAY 2006) 2. LOCATION OF ALL UNDERGROUND FACILITIES ARE APPROXIMATE. THE CONTRACTOR SHALL POTHOLE TO DETERMINE THE EXACT LOCATIONS AND VERIFY ALL CONDITIONS ON THE JOB SITE. HAND DIG FOUNDATIONS UNTIL CLEAR OF OBSTRUCTIONS. PHONE UNDERGROUND SERVICE ALERT AT (800) 227-2600, TWO (2) WORKING DAYS BEFORE DIGGING. 3. ALL INTERCONNECT PULLBOXES SHALL BE TYPE P48" X 3(5" X 30— DEEP- (INSIDE) PRE -CAST -CONCRETE. HAVE LOCKING FIBERGLASS UDS, AND BE LABLED "COMMUNICATIONS". 4. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER FOR EXACT EQUIPMENT LOCATIONS PRIOR TO FINAL PLACEMENT. 5. ALL REQUIRED CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA ENGINEERING DIVISION PRIOR TO COMMENCEMENT OF WORK. 6. THE ALIGNMENT OF THE INTERCONNECT DUCTS SHALL BE AS STRAIGHT AS POSSIBLE, HOWEVER, WHEN CHANGES IN ALIGNMENT ARE NECESSARY, SWEEPS SHALL HAVE RAD11 OF AT LEAST 10". EXISTING OR PROPOSED CURB & GUTTER J o M NATIVE SOIL AT 90% --------COMPACTION (IF SIDEWALK DOES NOT EXIST, COMPACTED NATIVE SOIL SHALL BE FLUSH DO WITH SURROUNDING SURFACE.) �6-1.5" (41mm) SCH 40 HDPE CONDUITS AND 4—SACK ORANGE PEA GRAVEL BACKFILL DETAIL "C" DUCT INSTALLATION AND TRENCH REPAIR DETAIL (INSTALLATION IN PARKWAY) N.T.S. 0 20 40 80 120 160 SCALE: 1 INCH = 40 FEET QROFESS Prepared Under The Supervision Of : CITY OF FONTANA CALIFORNIA /pN NUL �iNTRAFFIC SIGNAL INTERCONNECT PLAN I DRAWN BY: SCALE: VALLEY BOULEVARD SCALE: w - No. 37356 `� m 1 "=40' I D- Exp. 6-30-2008 yt tit DESIGNED BY: DATE: C1VI�_ ��� MM POPLAR AVE. TO CATAWBA AVE. JANUARY 2007 h�Og �`,,'��OF CN��F/ �/ Date 007 CHECKED BY: APPROVED BY-*- It DWG. NO.: 1 I TRAVIS P. VINCENT JR. RCE NO.: 37356 TV �� il_x A,04 �il�N�' • �f/�f/� ���D 1 DATE ENGR. CITY DATE CITY TRAFFIC ENGINEER R.C.E. 68819 I