HomeMy WebLinkAbout4147-72
4
BASELINE AVENUE
NOTES:
A
COBBLE PAVING
#1,
SEE DET, A ON SHEET LD1
B
COBBLE PAM NG
#2,
SEE DET. B ON SHEET LD -1
C
COBBLE PAM NG
#3,
SEE SHEET C ON LD -1
D
BOULDERS, SEE
DET.
D ON SHEET LD1
TOLL FREE `=�— 1-800-227-2600
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT
2'-0"
REV. REVISION DESCRIPTION DATE ENGR. CITY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT
AS -BUILT 10 MDQ
COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL
SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER,
THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO
BRING THEM INTO CONFORMANCE WITH CONDITIOA S AND
STANDARDS IN EFFECT.
FBI
i
254
j\_ANDSCgp\\
� o. 384 v �
--i
* xp. 11/30/08
\TF 0F
I
2'--0"
AS -BUILT
Prepared Under The Supervision Of :
JHA CONSULTING, INC.
PLANN ING ENTITLEMENTS
LANDSCAPE ARCHITECTURE
420 EXCHANGE , • SUITE 100
IRVINE . CALIFORNIA • 92602
(714)665-4540 • FX(714)379-4440
FBI
i
255
I
CITY OF FON TAN A
APPROVED BY DATE
,Tc CITY OF FONTANA., CALIFORNIA
LANDSCAPE IMPROVEMENTS - CONSTRUCTION PLAN
DRAWN BY:
JHA BASELINE AVENUE SCALE:
AS SHOWN
DESIGNED BY: JHA S A. 249+50 TO TA. 262+50 DATE:
OC"f. 2006
CHECKED BY: APPRO D BY: DRAWING NO.: Y221 JHA 4147
MICHAEL T. HARADA R.L.A. N0. 3848 Date CI ENGINEER C.E. 51152 DATE: LC -6