Loading...
HomeMy WebLinkAbout4147-72 4 BASELINE AVENUE NOTES: A COBBLE PAVING #1, SEE DET, A ON SHEET LD1 B COBBLE PAM NG #2, SEE DET. B ON SHEET LD -1 C COBBLE PAM NG #3, SEE SHEET C ON LD -1 D BOULDERS, SEE DET. D ON SHEET LD1 TOLL FREE `=�— 1-800-227-2600 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT 2'-0" REV. REVISION DESCRIPTION DATE ENGR. CITY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT AS -BUILT 10 MDQ COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIOA S AND STANDARDS IN EFFECT. FBI i 254 j\_ANDSCgp\\ � o. 384 v � --i * xp. 11/30/08 \TF 0F I 2'--0" AS -BUILT Prepared Under The Supervision Of : JHA CONSULTING, INC. PLANN ING ENTITLEMENTS LANDSCAPE ARCHITECTURE 420 EXCHANGE , • SUITE 100 IRVINE . CALIFORNIA • 92602 (714)665-4540 • FX(714)379-4440 FBI i 255 I CITY OF FON TAN A APPROVED BY DATE ,Tc CITY OF FONTANA., CALIFORNIA LANDSCAPE IMPROVEMENTS - CONSTRUCTION PLAN DRAWN BY: JHA BASELINE AVENUE SCALE: AS SHOWN DESIGNED BY: JHA S A. 249+50 TO TA. 262+50 DATE: OC"f. 2006 CHECKED BY: APPRO D BY: DRAWING NO.: Y221 JHA 4147 MICHAEL T. HARADA R.L.A. N0. 3848 Date CI ENGINEER C.E. 51152 DATE: LC -6