HomeMy WebLinkAbout4147-11PC
97
CONTROLLER "G" - INSTALL NEW 36 -STATION
CONTROLLER AT THIS LOCATION INSIDE NEW STRONGBOX
ENCLOSURE AND ELECTRIC METER; REMOVE & SALVAGE
EXISTING 12 -STATION CONTROLLER; AND CONNECT
CONTROL WIRES TO EIGHT (8) EXISTING VALVES FOR NEW
STATIONS G-23 THROUGH G-30.
98
1 -
SIERRA AVENUE
S.S.
/'7� ,�,�,�2�.,� C div T•ev�c�� ��Cc vs rJ�� sr2o�G13o c�
G/101�7 (246�
5e!F1LJ71_,).� E,�? �S.S'4-fes-3� - XX - 6�s¢ "
GE/V�'/2gL ./UDT �'=_IRRIGATION
NOTES:
/�l�I�,�i T/D/� c'Ort%/l�ocL� /e� �E//V �
7.
AS -BUILT DRAWINGS AND SPECIFICATIONS SHALL BE MAINTAINED ON SITE AT ALL
TIMES. AS -BUILT DRAWINGS SHALL BE UPDATED ON DAILY BASIS. NO SITE
4S 11VA01e4r4ellO 01V %��5e
REVIEWS ARE TO BE CONDUCTED WITHOUT THESE DRAWINGS.
D.C'AGJ/VG'S �.��9Lc �3E.S,9L//,9GEd
1.
INSTALL ALL PRESSURE AND NON -PRESSURE LINES AND ANY EQUIPMENT INSIDE
7_61,0tiEd
PLANTING AREAS WHEREVER POSSIBLE. (ITEMS SHOWN OUTSIDE SUCH AREAS
g
AREAS RECEIVING AN IRRIGATION SYSTEM SHALL BE REVIEWED AND VERIFIED
_4tiz? 0 Tv 7h, _ e_1 TY
FOR PURPOSES OF CLARITY ONLY.)
BY THE INSTALLING CONTRACTOR FOR ACCURACY OF SIZE AND CONFIGURATION.
Q� /Cd/L)
IF DISCREPANCIESARE FOUND THAT WOULD PROVE DETRIMENTAL TO FINAL
2.
ALL EQUIPMENT SHALL BE SELECTED AND INSTALLED IN ACCORDANCE WITH
COVERAGE, THIS SHALL BE BROUGHT TO THE OWNER'S ATTENTION BEFORE
SPECIFICATIONS AND CONSTRUCTION DETAILS. SEE SHEET NO. LD -2.
INSTALLATION. BY FAILING TO DO SO, THE CONTRACTOR MAY BE RESPONSIBLE
FOR ANY ADJUSTMENTS REQUIRED.
3.
WHERE PRESSURE REGULATING VALVES ARE USED, VALVES ARE TO BE ADJUSTED
FOR OPTIMUM PRESSURE, OR AS NOTED ON DRAWING.
g
CONTRACTOR SHALL BE RESPONSIBLE FOR WATER AND ELECTRICAL
CONSUMPTION UNTIL THEAUTHORIZED CITY REPRESENTATIVE ACCEPTS PROJECT.
4.
ADJUST ALL SYSTEMS TO AVOID SPRAY Oi11_0 WALLS, WALKS, AND ROADWAYS
BY INDIVIDUALLY ADJUSTING SPRINKLER HEADS AND CONTROL VALVES.
10.
IRRIGATION SYSTEMS ARE BASED ON CITY STATIC WATER PRESSURE OF 50 P.S.I.
AVERAGE PRESSURE DATA WAS OBTAINED FROM THE FONTANA WATER COMPANY
5.
AREAS THAT NEED TO BE DEFINED IN ORDER TO DETERMINE EXACT LOCATION
WHOSE PHONE NUMBERS IS (909) 822-2201. CONTRACTOR IS TO VERIFY THIS
OF SPRINKLER HEADS ARE THE RESPONSIBILITY OF THE INSTALLING CONTRACTOR
INFORMATION BEFORE INSTALLATION IF DATA VARIES FROM THIS INFORMATION.
TO SEE THEY ARE DEFINED PRIOR TO INSTALLATION.
CONTRACTOR IS TO NOTIFY OWNER FOR INSTRUCTIONS. FAILURE TO DO SO
COULD RESULT IN CONTRACTOR BEING RESPONSIBLE FOR CHANGES THAT MIGHT
6.
CONTRACTOR SHALL CONNECT 110V ELECTRICAL SERVICE TO NEW CONTROLLERS
OCCUR.
FROM ADJACENT EXISTING CONTROLLER AS SHOWN ON PLAN. CONTRACTOR
SHALL PROVIDE ALL LABOR AND EQUIPMENT AS NECESSARY TO PROVIDE
11
ALL PIPING UNDER SIDEWALKS SHALL BE SLEEVED WITH 2X DIAMETER PVC
PROPER CONNECTIONS.
SCH. 40 PIPES TYP.
7m==7�7
0 10' 20' 40'
AS -BUILT
Prepared Under ine supervision Of :
JHA CONSULTING, INC.
PLANN I NG ENTITLEMENTS
LAN DSC SPE ARCHITECTURE
420 EXCHANGE , • SUITE 100
IRVINE , CALIFORNIA • 92602
(714)665-4540 • FX (714).1-19-4440
MICHAEL T. HARADA R.L.A. N0. 3848 Date