Loading...
HomeMy WebLinkAbout4122-7GENERAL NOTES 1. ADVANCE CONSTRUCTION SIGNING INDICATING DURATION OF PROJECT SHALL BE IN PLACE ONE WEEK PRIOR TO IMPLEMENTING DETOURS. 2. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT—OF—WAY WITHIN THE CITY. CALL (909) 350-7610. 3. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE MUTCD 2003 CALIFORNIA SUPPLEMENT SECTION 6 UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER. 4. THE CONTRACTOR SHALL NOTIFY THE CITY TRAFFIC SECTION TWO WORKING DAYS PRIOR TO IMPLEMENTING THE TRAFFIC CONTROL PLAN TO ALLOW CITY STAFF TIME TO ADJUST TRAFFIC SIGNAL DETECTION. 5. THE CONTRACTOR SHALL MAINTAIN TWO WAY TRAFFIC AT ALL TIMES UNLESS OTHERWISE APPROVED BY THE CITY TRAFFIC ENGINEER. QUALIFIED FLACGERS SHALL BE USED WHEN THE ROADWAY IS REDUCED TO A SINGLE LANE OR WHERE TRAFFIC MUST STOP FOR MOVEMENT OF EQUIPMENT. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES. 7. THE WORK ZONE SHALL BE ROUTINELY INSPECTED AND MAINTAINED TO ENSURE PROPER VISIBILITY AND OPERATION OF ALL TRAFFIC CONTROL AND ADVANCE WARNING DEVICES. 8. ALL EXISTING SIGNS, STRIPING OR PAVEMENT MARKINGS THAT ARE IN CONFLICT AND/OR NO LONGER APPLICABLE SHALL BE REMOVED BY SANDBLASTING. 9. SIGNS SHALL NOT BE PLACED IN EXCESS OF 15 FEET FROM THE EDGE OF THE TRAVELLED WAY. PORTABLE SIGN STANDARDS SHALL BE TIED DOWN OR WEIGHTED TO PREVENT TOPPLING. 10. THE EXACT LOCATION OF ALL TRAFFIC CONTROL DEVICES IS SUBJECT TO APPROVAL OF THE CITY TRAFFIC ENGINEER ADDITIONAL WARNING CONSTRUCTION SIGNS OR TRAFFIC SAFETY EQUIPMENT MAY BE SIGNS & B PER PHASE BASELINE AVENUE SCALE: 1"i =40' REQUIRED BY THE CITY TRAFFIC ENGINEER.�� 11. ALL WORK AREAS SHALL BE CLEARLY IDENTIFIED AND DELINEATED WITH CONES, PORTABLE DELINEATORS AND/OR BARRICADES. ALL CONES OR PORTABLE DELINEATORS SHALL BE A MINIMUM OF 28 INCHES IN HEIGHT. SPACING SHALL BE 50', UNLESS OTHERWISE NOTED. , PA ,, E 12. TRAFFIC SIGN DIMENSIONS, COLOR AND LETTERING SHALL CONFORM TO THE 2003 MUTCD AND CALIFORNIA SIGNS & BARRICADES SUPPLEMENT. SIGN CODES SHOWN HEREON ARE TO CONFORM TO 2003 MUTCD AND CALIFORNIA SUPPLEMENT. PER PHASE 4 TYPE G CROSSWALK MARKER 6" TYP%_4" WHITE LINE DETAIL "A" NTS zoHm SCALE: 1"=40' INSTALL DETAIL 22 — 7z — SIERRA 73 IC30(CA INSTALL DETAIL 12 NOTE TO CONTRACTOR: Traffic Control shown hereon is concept only. Traffic lanes may have to be modified per Contractor's schedule or construction methods. Contractor shall submit detailed traffic control plans for approval by the City Traffic Engineer ten (10) working days in advance of any proposed modification to these plans or construction phasing. y, I C17(CA)(35) 30(CA) ` PA � Z F 10 U) + X Lr) ' z Q ._ ---I_-1 -- - O L BASELINE AVENUE SIGNS & BARRICADES PER PHASE 2 INSTALL r ETAIL 22 SIERRA YAGWITM SCALE: 1"=40' INSTALL DETAIL 12-1 PA -------- --- ===� co PROTECT EX. HDPE AND FIFER Ir WORK ZONE. 1 + BAPPROAMATE EX. EP DEPTH IS 24 —36 AND LOCATED I cn R11H 2 R11-2 7 AVENUE SIERRA ARRAY 'TB' 900' TRANSITION INSTALL DETAIL 22—A cV d' 0 N z �0 X W z z CL 0 I W1-8(LT) C17(CA)(35) 500' — it MICALLEF STREET 500' _ it L0 0 r` M AVENUE TRAFFIC SIGN SIZE SHALL BE FOR CONVENTIONAL ROADWAYS UNLESS OTHERWISE SHOWN ON THE PLANS. Ln 0 TYPE II BARRICADE 13. TEMPORARY STRIPING SHALL BE PAINT, 2 COATS. � LL � (7 14. ALL FLASHING YELLOW WARNING LIGHTS SHALL BE TYPE "A" PORTABLE, LENS DIRECTED, ENCLOSED AND ry Q (f) W > MOUNTED AT A MINIMUM HEIGHT OF THREE FEET, MEASURED FROM THE BOTTOM OF THE LENS TO THE W 0 Z m _m -- = W 0 W Q UNDERLYING SURFACE. z m 12 1 ----- =, 15. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A W Cn 0 WORK AREA MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES. 0 16. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER, AND INSTALL O + WORK AREA — USING DAILY LANE CLOSURES —_ SIGNING AND STRIPING PER THE SIGNING AND STRIPING PLANS. 0 COMMUNICATION CONDUIT PLAN 1 OF 3 —► DIRECTION OF TRAVEL 17. ALL SIGNS SHALL BE REFLECTORIZED. 0 18. CONTRACTOR TO CONTACT TIM RASTEDT AT (909) 350-6649 TWO WORKING DAYS PRIOR TO ANY SIGN Q Iy - — — STREET IMPROVEMENT PLANS 13,14 OF 29 19. 20. INSTALLATION TO ALLOW CITY STAFF TO LOCATE EXISTING UNDERGROUND FACILITIES. ALL W20-1 AND G20-2 CONSTRUCTION SIGNS SHALL REMAIN IN PLACE FOR THE DURATION OF THE PROJECT, UNLESS OTHERWISE SHOWN TO BE RELOCATED ON THESE PLANS OR AS DIRECTED BY THE ENGINEER IN THE FIELD. CONTRACTOR SHALL MAINTAIN PEDESTRIAN ACCESS AT ALL TIMES. WHEN PEDESTRIAN ACCESS CAN NO LONGER BE MAINTAINED DUE TO CONSTRUCTION, CONTRACTOR SHALL INSTALL "SIDEWALK CLOSED" AND "SIDEWALK CLOSED AHEAD" SIGNS AT LOCATIONS AS DIRECTED BY THE ENGINEER IN THE FIELD. L!J z W > 0 M Q 3 PHASE 2) 3 OF 20 =W=_ TEMPORARY CRASH CUSHIONS, ARRAY AS NOTED. 0 W 'No 2ND MARKER DIRECTION OF TRAVEL NOT USED AT LIMIT LINE OF' 1 U) TYPE G CROSSWALK MARKER 6" TYP%_4" WHITE LINE DETAIL "A" NTS zoHm SCALE: 1"=40' INSTALL DETAIL 22 — 7z — SIERRA 73 IC30(CA INSTALL DETAIL 12 NOTE TO CONTRACTOR: Traffic Control shown hereon is concept only. Traffic lanes may have to be modified per Contractor's schedule or construction methods. Contractor shall submit detailed traffic control plans for approval by the City Traffic Engineer ten (10) working days in advance of any proposed modification to these plans or construction phasing. y, I C17(CA)(35) 30(CA) ` PA � Z F 10 U) + X Lr) ' z Q ._ ---I_-1 -- - O L BASELINE AVENUE SIGNS & BARRICADES PER PHASE 2 INSTALL r ETAIL 22 SIERRA YAGWITM SCALE: 1"=40' INSTALL DETAIL 12-1 PA -------- --- ===� co PROTECT EX. HDPE AND FIFER Ir WORK ZONE. 1 + BAPPROAMATE EX. EP DEPTH IS 24 —36 AND LOCATED I cn R11H 2 R11-2 7 AVENUE SIERRA ARRAY 'TB' 900' TRANSITION INSTALL DETAIL 22—A cV d' 0 N z �0 X W z z CL 0 I W1-8(LT) C17(CA)(35) 500' — it MICALLEF STREET 500' _ it L0 0 r` M AVENUE 0 Ln 0 TYPE II BARRICADE � LL � (7 J ry Q (f) W > 6 W 0 Z m _m -- = W 0 W Q z m 12 1 ----- =, TYPE G CROSSWALK MARKER 6" TYP%_4" WHITE LINE DETAIL "A" NTS zoHm SCALE: 1"=40' INSTALL DETAIL 22 — 7z — SIERRA 73 IC30(CA INSTALL DETAIL 12 NOTE TO CONTRACTOR: Traffic Control shown hereon is concept only. Traffic lanes may have to be modified per Contractor's schedule or construction methods. Contractor shall submit detailed traffic control plans for approval by the City Traffic Engineer ten (10) working days in advance of any proposed modification to these plans or construction phasing. y, I C17(CA)(35) 30(CA) ` PA � Z F 10 U) + X Lr) ' z Q ._ ---I_-1 -- - O L BASELINE AVENUE SIGNS & BARRICADES PER PHASE 2 INSTALL r ETAIL 22 SIERRA YAGWITM SCALE: 1"=40' INSTALL DETAIL 12-1 PA -------- --- ===� co PROTECT EX. HDPE AND FIFER Ir WORK ZONE. 1 + BAPPROAMATE EX. EP DEPTH IS 24 —36 AND LOCATED I cn R11H 2 R11-2 7 AVENUE SIERRA ARRAY 'TB' 900' TRANSITION INSTALL DETAIL 22—A cV d' 0 N z �0 X W z z CL 0 I W1-8(LT) C17(CA)(35) 500' — it MICALLEF STREET 500' _ it L0 0 r` M AVENUE I W1-8(LT) J 71— W J Z W M J W U W �- () Q _ I I r, DURING CONSTRUCTION OF THIS AREA, CONTRACTOR SHALL CLOSE INGRESS/EGRESS ACCESS AND INSTALL APPROPRIATE TRAFFIC CONTROL DEVICE FOR ROAD CLOSURE. INTERSECTION SHALL BE RE—OPENED WITHIN 5 DAYS, AS DIRECTED BY THE ENGINEER IN THE FIELD. SEE SHEET 2 OF 20. Am C a, 0 0 TYPE II BARRICADE � LL W J — Q TYPE III BARRICADE (WITH FLASHERS) > 6 C 0 W W z m —8(LT)I J ® W W Cn 0 WORK AREA J -- — SEWER IMPROVEMENT PLAN 1,2 OF 6 I W1-8(LT) J 71— W J Z W M J W U W �- () Q _ I I r, DURING CONSTRUCTION OF THIS AREA, CONTRACTOR SHALL CLOSE INGRESS/EGRESS ACCESS AND INSTALL APPROPRIATE TRAFFIC CONTROL DEVICE FOR ROAD CLOSURE. INTERSECTION SHALL BE RE—OPENED WITHIN 5 DAYS, AS DIRECTED BY THE ENGINEER IN THE FIELD. SEE SHEET 2 OF 20. Am C a, PHASE 3 5 OF 20 o —w SIGN AND POST G20 -2F PHASE 4 6 OF 20 — — (PHASE 6) 8,9 OF 20 HIGH LEVEL WARNING DEVICE Q — — — — — — — — — —' — — — — — — — — (PHASE 7) 12,13 OF 20 UI (PHASE 8) 16,17 OF 20 PA PEDESTRIAN ACCESS, SEE GENERAL NOTE 20. F -- D rn u - TOLL FREE —800-227-260u A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT AVENUE REV. REVISION DESCRIPTION DATE ENGR. CITY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT QROFESS/ON COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH INA DILIGENT MANNER, No. 371,21 AY REQUIRE REVISIONS TO THE PLANS TO THE CITY ENGINEER M Q g�tx . s/3o/os � — BRING THEM INTO CONFORMANCE WITH CONDITIONS AND s} CIV\\. STANDARDS IN EFFECT. OF CAi-\F n I- W w S STREET IMPROVEMENTS AND STORM DRAIN laJ V) Prepared Under The Supervision Of CITY OF FONTANA, CALIFORNIA a_ Berr 3 SIERRA AVE AND BASELINE AVE IMPROVEMENTS DRAWN BY: TRFFIC CONTROL - PHASE 5 SCALE: '„—,W,Lj J 2001 East First Street YqNpDESIGNED BY: DATE: m Santa Ana, CA 92705 gg SIERRA AVENUE 07/31 /06 , TEL: (714)568-7306 FAX: (714)836-5906 CHECKED BY: APPROVED BY: DRAWING NO,:[720 Al 8/28/06 4122 Ln Date - CITY TRAFFIC ENG ER R.C.E. 68819 DATE: 0= I TYPE II BARRICADE W20-2 W20-1 TYPE III BARRICADE (WITH FLASHERS) V, E PORTABLE DELINEATOR (GLUE DOWN) ® FLASHING ARROW BOARD CROSS REFERENCES: 0 WORK AREA J -- — SEWER IMPROVEMENT PLAN 1,2 OF 6 81 STORM DRAIN IMPROVEMENT PLAN 1,2 OF 12 WORK AREA — USING DAILY LANE CLOSURES _ r TRAFFIC SIGNAL MODIFICATION PLAN 2 OF 3 0 COMMUNICATION CONDUIT PLAN 1 OF 3 —► DIRECTION OF TRAVEL SIGNING AND STRIPING PLAN 1,2 OF 5 - - — — STREET IMPROVEMENT PLANS 13,14 OF 29 TEMPORARY K—RAIL (WITH REFLECTIVE TABS) o TRAFFIC CONTROL PHASE 1) 1 OF 20 PHASE 2) 3 OF 20 TEMPORARY CRASH CUSHIONS, ARRAY AS NOTED. PHASE 3 5 OF 20 o —w SIGN AND POST G20 -2F PHASE 4 6 OF 20 — — (PHASE 6) 8,9 OF 20 HIGH LEVEL WARNING DEVICE Q — — — — — — — — — —' — — — — — — — — (PHASE 7) 12,13 OF 20 UI (PHASE 8) 16,17 OF 20 PA PEDESTRIAN ACCESS, SEE GENERAL NOTE 20. F -- D rn u - TOLL FREE —800-227-260u A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT AVENUE REV. REVISION DESCRIPTION DATE ENGR. CITY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT QROFESS/ON COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH INA DILIGENT MANNER, No. 371,21 AY REQUIRE REVISIONS TO THE PLANS TO THE CITY ENGINEER M Q g�tx . s/3o/os � — BRING THEM INTO CONFORMANCE WITH CONDITIONS AND s} CIV\\. STANDARDS IN EFFECT. OF CAi-\F n I- W w S STREET IMPROVEMENTS AND STORM DRAIN laJ V) Prepared Under The Supervision Of CITY OF FONTANA, CALIFORNIA a_ Berr 3 SIERRA AVE AND BASELINE AVE IMPROVEMENTS DRAWN BY: TRFFIC CONTROL - PHASE 5 SCALE: '„—,W,Lj J 2001 East First Street YqNpDESIGNED BY: DATE: m Santa Ana, CA 92705 gg SIERRA AVENUE 07/31 /06 , TEL: (714)568-7306 FAX: (714)836-5906 CHECKED BY: APPROVED BY: DRAWING NO,:[720 Al 8/28/06 4122 Ln Date - CITY TRAFFIC ENG ER R.C.E. 68819 DATE: 0=