HomeMy WebLinkAbout4122-3500' �� �: GENERAL (VOTES I 1. ADVANCE CONSTRUCTION SIGNING INDICATING DURATION OF PROJECT SHALL BE IN PLACE ONE PHASE 6) 8,9 OF 20 WEEK PRIOR TO IMPLEMENTING DETOURS. 2. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY TYPE III BARRICADE (WITH FLASHERS) (PHASE 8) 16,17 OF 20 DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO W21 -5b �- THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY. CALL (909) 350-7610. 3. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES FLASHING ARROW BOARD DESCRIBED IN THE MUTCD 2003 CALIFORNIA SUPPLEMENT SECTION 6 UNLESS OTHERWISE DIRECTED WORK AREA BY THE CITY TRAFFIC ENGINEER. 4. THE CONTRACTOR SHALL NOTIFY THE CITY TRAFFIC SECTION TWO WORKING DAYS PRIOR TO G2 r 2 i IMPLEMENTING THE TRAFFIC CONTROL PLAN TO ALLOW CITY STAFF TIME TO ADJUST TRAFFIC SIGNAL DETECTION. 5. THE CONTRACTOR SHALL MAINTAIN TWO WAY TRAFFIC AT ALL TIMES UNLESS OTHERWISE APPROVED AVENUE BY THE CITY TRAFFIC ENGINEER. QUALIFIED FLAGGERS SHALL BE USED WHEN THE ROADWAY IS Prepared Under The supervision Of : CITY OF FONTANA, CALIFORNIA REDUCED TO A SINGLE LANE OR WHERE TRAFFIC MUST STOP FOR MOVEMENT OF EQUIPMENT. TEMPORARY CRASH CUSHIONS, ARRAY AS NOTED. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR 4G20-2 SIGN AND POST OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES. 7. THE WORK ZONE SHALL BE ROUTINELY INSPECTED AND MAINTAINED TO ENSURE PROPER VISIBILITY DRAWN BB: AND OPERATION OF ALL TRAFFIC CONTROL AND ADVANCE WARNING DEVICES. PEDESTRIAN ACCESS, SEE GENERAL NOTE 20. 8. ALL EXISTING SIGNS, STRIPING OR PAVEMENT MARKINGS THAT ARE IN CONFLICT AND/OR NO LONGER B APPLICABLE SHALL BE REMOVED BY SANDBLASTING. 1, -4-O. 9. SIGNS SHALL NOT BE PLACED IN EXCESS OF 15 FEET FROM THE EDGE OF THE TRAVELLED WAY. SIERRA AVENUE Q m PORTABLE SIGN STANDARDS SHALL BE TIED DOWN OR WEIGHTED TO PREVENT TOPPLING. DATE: 07/31/06 10. THE EXACT LOCATION OF ALL TRAFFIC CONTROL DEVICES IS SUBJECT TO APPROVAL OF THE CITY TRAFFIC ENGINEER. ADDITIONAL WARNING, CONSTRUCTION SIGNS OR TRAFFIC SAFETY EQUIPMENT MAY BE TEL: (714)568-7300 FAX: (714)836-5906 REQUIRED BY THE CITY TRAFFIC ENGINEER. W20-1 DRAWING NO.:[720 F 11. ALL WORK AREAS SHALL BE CLEARLY IDENTIFIED AND DELINEATED WITH CONES, PORTABLE DELINEATORS 4122 AND/OR BARRICADES. ALL CONES OR PORTABLE DELINEATORS SHALL BE A MINIMUM OF 28 INCHES IN HEIGHT. Date CITY TRAFFIC ENG ER R.C.E. 68819 T SPACING SHALL BE 50', UNLESS OTHERWISE NOTED. 12. TRAFFIC SIGN DIMENSIONS, COLOR AND LETTERING SHALL CONFORM TO THE 2003 MUTCD AND CALIFORNIA SUPPLEMENT. SIGN CODES SHOWN HEREON ARE TO CONFORM TO 2003 MUTCD AND CALIFORNIA SUPPLEMENT. TRAFFIC SIGN SIZE SHALL BE FOR CONVENTIONAL ROADWAYS UNLESS OTHERWISE SHOWN ON THE PLANS. 500' 13. TEMPORARY STRIPING SHALL BE PAINT, 2 COATS. 14. ALL FLASHING YELLOW WARNING LIGHTS SHALL BE TYPE "A" PORTABLE, LENS DIRECTED, ENCLOSED AND MOUNTED AT A MINIMUM HEIGHT OF THREE FEET, MEASURED FROM THE BOTTOM OF THE LENS TO THE UNDERLYING SURFACE. 15. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES. 16. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER, AND INSTALL SIGNING AND STRIPING PER THE SIGNING AND STRIPING PLANS. 17. ALL SIGNS SHALL BE REFLECTORIZED. 18. CONTRACTOR TO CONTACT TIM RASTEDT AT (909) 350-6649 TWO WORKING DAYS PRIOR TO ANY SIGN INSTALLATION TO ALLOW CITY STAFF TO LOCATE EXISTING UNDERGROUND FACILITIES. 19. ALL W20-1 AND G20-2 CONSTRUCTION SIGNS SHALL REMAIN IN PLACE FOR THE DURATION OF THE PROJECT, UNLESS OTHERWISE SHOWN TO BE RELOCATED ON THESE PLANS OR AS DIRECTED BY THE ENGINEER IN THE FIELD. 20. CONTRACTOR SHALL MAINTAIN PEDESTRIAN ACCESS AT ALL TIMES. WHEN PEDESTRIAN ACCESS CAN NO LONGER BE MAINTAINED DUE TO CONSTRUCTION, CONTRACTOR SHALL INSTALL "SIDEWALK CLOSED" AND "SIDEWALK CLOSED AHEAD" SIGNS AT LOCATIONS AS DIRECTED BY THE ENGINEER IN SHE FIELD. 500' �� �: I I TYPE II BARRICADE 00 PHASE 6) 8,9 OF 20 0 (PHASE 7) 12,13 OF 20 TYPE III BARRICADE (WITH FLASHERS) (PHASE 8) 16,17 OF 20 _ W21 -5b �- PORTABLE DELINEATOR (GLUE DOWN) ® FLASHING ARROW BOARD b o WORK AREA J I— 0 WORK AREA - USING DAILY LANE CLOSURES G2 r 2 i Ln W20-1 DIRECTION OF TRAVEL BASELINE AVENUE TEMPORARY K -RAIL (WITH REFLECTIVE TABS) Prepared Under The supervision Of : CITY OF FONTANA, CALIFORNIA I$IB= TEMPORARY CRASH CUSHIONS, ARRAY AS NOTED. SIGN AND POST SIERRA AVE AND BASELINE AVE IMPROVEMENTS HIGH LEVEL WARNING DEVICE DRAWN BB: PA PEDESTRIAN ACCESS, SEE GENERAL NOTE 20. 2ND MARKER DIRECTION OF TRAVEL NOT USED AT - LIMIT LINE OR TYPE G CROSSWALK MARKER 6" TYP\-4" WHITE LINE DETAIL "A" NTS 0 Z N F 0+ w zr- a- d 00 500' r- r . _ ..-.---_-__.--.__- -- _ r4') LL a _T C� i 4 ------ - .. _... ... ..... �� ` — __.. _. 7 20-1 W - o a _ Z W Z N — J 4-1 N- f � N � — — -- -- 2 F 71 72 F T l M20 W— LJ ,� - _ _ - - -- —. _ EX. E P71,PA ' -- -- } .. « INSTALL DETAIL "A" ,.v':. - " " I CROSS REFERENCES: v SfiALL DETAIL A INSTALL DETAIL 1 j PROTECT EX. HDPE AND FIFER ISI WORK ZONE. - r f r r SEWER IMPROVEMENT PLAN 1,2 OF 6 APPROXIMATE DEPTH IS 24 -36 AND LOCATED INSTALL. 12" VHITIE LINE 3_ " STORM DRAIN IMPROVEMENT PLAN 1,2 OF 12 € E' BEHIND EX. EPiNQ -TOP" _. TRAFFIC SIGNAL MODIFICATION PLAN 2 OF 3 N jam--- I E COMMUNICATION CONDUIT PLAN 1 OF 3 SIGNING AND STRIPING PLAN 1,2 OF 5 6 STREET IMPROVEMENT PLANS 13,14 OF 29 (5A b TRAFFIC CONTROL PHASE 1) 1 OF 20 I € ( I o �` PHASE 3 5 OF 20 0 SIERRA I- G2T 2 i W20-1 MICALEFF AVENUE NOTE TO CONTRACTOR: Traffic Control shown hereon is concept only. Traffic lanes may have to be modified per Contractor's schedule or construction methods. Contractor shall submit detailed traffic control plans for approval by the City Traffic Engineer ten (10) working days in advance of any proposed modification to these plans or construction phasing. ;,OA:18 REV. Tc� D Dc� 'A -- I �Q r- � I TOLL FREE -qNM=w-1 -800- 227- 2600 REVISION DESCRIPTION DATE ENGR. CITY D'rE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT QROFESS/p�, COMMENCE WITHIN TWO YEARS OF THE DATE OFAPPROVAL ��O�J�E8 Kyq� SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, No. 37 THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO Q o�. s/3o/oa — BRING THEM INTO CONFORMANCE WITH CONDITIONS AND CIV\\- - STANDARDS IN EFFECT. q� OF WA oo AVENUEPHASE 4) 6 OF 20 PHASE 5) 7 OF 20 00 PHASE 6) 8,9 OF 20 0 (PHASE 7) 12,13 OF 20 (PHASE 8) 16,17 OF 20 N S Ll I J I— r) Lf ) Ln i- !iJ W STREET IMPROVEMENTS AND STORM DRAIN Z Ljj Prepared Under The supervision Of : CITY OF FONTANA, CALIFORNIA lj� SIERRA AVE AND BASELINE AVE IMPROVEMENTS DRAWN BB: TRAFFIC CONTROL - PHASE 2 SCALE: j B 1, -4-O. 2001 East First Street ree SIERRA AVENUE Q m DESIGNED BY BB DATE: 07/31/06 Santa Ana, CA 92ree TEL: (714)568-7300 FAX: (714)836-5906 CHECKED BY: APPROVED BY: DRAWING NO.:[720 AF Q 8 4122 ci_ Date CITY TRAFFIC ENG ER R.C.E. 68819 T