Loading...
HomeMy WebLinkAbout4122-17GENERAL NOTES 1. ADVANCE CONSTRUCTION SIGNING INDICATING DURATION OF PROJECT SHALL BE IN PLACE ONE WEEK PRIOR TO IMPLEMENTING DETOURS. 2. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY. CALL (909) 350-7610. 3. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE MUTCD 2003 CALIFORNIA SUPPLEMENT SECTION 6 UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER. 4. THE CONTRACTOR SHALL NOTIFY THE CITY TRAFFIC SECTION TWO WORKING DAYS PRIOR TO IMPLEMENTING THE TRAFFIC CONTROL PLAN TO ALLOW CITY STAFF TIME TO ADJUST TRAFFIC SINAL DETECTION. 5. THE CONTRACTOR SHALL MAINTAIN TWO WAY TRAFFIC AT ALL TIMES UNLESS OTHERWISE APPROVED BY THE CITY TRAFFIC ENGINEER. QUALIFIED FLAGGERS SHALL BE USED WHEN THE ROADWAY IS REDUCED TO A SINGLE LANE OR WHERE TRAFFIC MUST STOP FOR MOVEMENT OF EQUIPMENT. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES. 7. THE WORK ZONE SHALL BE ROUTINELY INSPECTED AND MAINTAINED TO ENSURE PROPER VISIBILITY AND OPERATION OF ALL TRAFFIC CONTROL AND ADVANCE WARNING DEVICES. 8. ALL EXISTING SIGNS, STRIPING OR PAVEMENT MARKINGS THAT ARE IN CONFLICT AND/OR NO LONGER APPLICABLE SHALL BE REMOVED. 9. SIGNS SHALL NOT BE PLACED IN EXCESS OF 15 FEET FROM THE EDGE OF THE TRAVELLED WAY. PORTABLE SIGN STANDARDS SHALL BE TIED DOWN OR WEIGHTED TO PREVENT TOPPLING. 10. THE EXACT LOCATION OF ALL TRAFFIC CONTROL DEVICES IS SUBJECT TO APPROVAL OF THE CITY TRAFFIC ENGINEER. ADDITIONAL WARNING, CONSTRUCTION SIGNS OR TRAFFIC SAFETY EQUIPMENT MAY BE REQUIRED BY THE CITY TRAFFIC ENGINEER. 11. ALL WORK AREAS SHALL BE CLEARLY IDENTIFIED AND DELINEATED WITH CONES, PORTABLE DELINEATORS AND/OR BARRICADES. ALL CONES OR PORTABLE DELINEATORS SHALL BE A MINIMUM OF 28 INCHES IN HEIGHT. SPACING SHALL BE 50', UNLESS OTHERWISE NOTED. 12. TRAFFIC SIGN DIMENSIONS, COLOR AND LETTERING SHALL CONFORM TO THE 2003 MUTCD AND CALIFORNIA SUPPLEMENT. SIGN CODES SHOWN HEREON ARE TO CONFORM TO 2003 MUTCD AND CALIFORNIA SUPPLEMENT. TRAFFIC SIGN SIZE SHALL BE FOR CONVENTIONAL ROADWAY UNLESS OTHERWISE SHOWN ON THE PLANS. 13. TEMPORARY STRIPING SHALL BE PAINT, 2 COATS. 14. ALL FLASHING YELLOW WARNING LIGHTS SHALL BE iYPE "A" PORTABLE, LENS DIRECTED, ENCLOSED AND MOUNTED AT A MINIMUM HEIGHT OF THREE FEET, MEASURED FROM THE BOTTOM OF THE LENS TO THE UNDERLYING SURFACE. 15. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES. 16. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER, AND INSTALL SIGNING AND STRIPING PER THE SIGNING AND STRIPING PLANS. 17. ALL SIGNS SHALL BE REFLECTORIZED. 18. CONTRACTOR TO CONTACT TIM RASTEDT AT (909) 350-6649 TWO WORKING DAYS PRIOR TO ANY SIGN INSTALLATION TO ALLOW CITY STAFF TO LOCATE EXISTING UNDERGROUND FACILITIES. 19. ALL W20-1 AND G20-2 CONSTRUCTION SIGNS SHALL REMAIN IN PLACE FOR THE DURATION OF THE PROJECT, UNLESS OTHERWISE SHOWN TO BE RELOCATED ON THESE PLANS OR AS DIRECTED BY THE ENGINEER IN THE FIELD. 20. CONTRACTOR SHALL MAINTAIN PEDESTRIAN ACCESS AT ALL TIMES. WHEN PEDESTRIAN ACCESS CAN NO LONGER BE MAINTAINED DUE TO CONSTRUCTION, CONTRACTOR SHALL INSTALL "SIDEWALK CLOSED" AND "SIDEWALK CLOSED AHEAD" SIGNS AT LOCATIONS AS DIRECTED BY THE ENGINEER IN THE FIELD. SCALE: I"=40' INSTALL DETAIL 12 INSTALL TYPE IV— ARROW V—ARROW MAONSM SCALE: 1"=40' INSTALL DETAIL 38 O INSTALL DETAIL 12 - INSTALL TYPE IV O ARROW + If (\ 00 Q _ INSTALL TYPE IV ARROW o \--- INSTALL DETAIL "A" INSTALL DETAIL. 38 INSTALL DETAIL "A" G40-2 0-1 SIERRA MICALLEF STREET INSTALL DETAIL "A" F 49' 2ND M 4RKER � INOT USED AT DIRECTION OF TRAVEL LIMIT LINE OR TYPE G\,, CROSSWALK MARKER �+\_4" WHITE LINE TYP U161 L "A" NTS WALNUT AVE INSTALL DETAIL "A" 10' P TYP INSTALL 12" WHIIIIE LINT T. cp U w 1 °�, Q NOTE TO CONTRACTOR: Traffic Control shown hereon is concept only. Traffic lanes may have to be modified per Contractor's schedule or construction methods. Contractor shall submit detailed traffic control plans for approval by the City Traffic Engineer ten (10) working days in advance of any proposed modification to these plans or construction phasing. INSTALL DETAIL 38 INSTALL TYPE ARROW SIERRA I IP M%�LL 3 TOLL MEE -qqm�-1- 800- 227- 2600 A PUBLIC SERVICE BY UNDERCROLIND SERVICE ALERT INSTALL DETAIL " INSTALL 12" WHITE LIINE C30(C 110 him �III� !i-- ril WALNUT VILLAGE PKWY 7W INSTALL TYPE`tV ARROW I EC*ND I TYPE II BARRICADE I TYPE III BARRICADE (WITH FLASHERS) -� PORTABLE DELINEATOR (GLUE DOWN) ® FLASHING ARROW BOARD WORK AREA WORK AREA - USING DAILY LANE CLOSURES '-1► DIRECTION OF TRAVEL -♦ - TEMPORARY K -RAIL (WITH REFLECTIVE TABS) HIP= TEMPORARY CRASH CUSHIONS, ARRAY AS NOTED. SIGN AND POST —{ HIGH LEVEL WARNING DEVICE PA PEDESTRIAN ACCESS, SEE GENERAL NOTE 20. INSTALL TYPE IV ARROW r --INSTALL DETAIL 38 I DURING CONSTRUCTION OF -TH1� AREA, CONTRACTOR SHALL i' INSTALL APPROPRIATE TRAFFIC CONTROL DEVICES FOR LANE CLOSURES. INTERSECTION SHALL BE RE -OPENED WI i HIN 5 DAYS, AS DIRECTED BY THE ENGINEER IN THE FIEI.D, REV, REVISION DESCRIPTION DATE I ENGR. CITY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH INA DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND STA.NDA'?DS IN EFFECT. i CA C30(CA) 75 O O w J � C/) O u J W STREET IMPROVEMENT PLANS 14,15,16 OF 29 — — iV T Vi11-8(RT) Q f— COMMUNICATION CONDUIT PLAN 1 OF 3 N f 2 OF 5 -� N 90' 170' - - - i- W 3 OF 20 -El C30(CA) (PHASE 4) 6 OF 20 (n W_C30(CA) (PHASE 6 8,10 OF 20 (PHASE 7) 12,14 OF 20 19 OF 20 w x`30 (CA) 4 �.�.���.�—. 73 74 LijZ W1-8(RT)I C301 z N C30(CA)I J W04 ..-_ cV "-► 110' U U) — ._ — — — — — — — — — — — — — Q _ INSTALL TYPE IV ARROW o \--- INSTALL DETAIL "A" INSTALL DETAIL. 38 INSTALL DETAIL "A" G40-2 0-1 SIERRA MICALLEF STREET INSTALL DETAIL "A" F 49' 2ND M 4RKER � INOT USED AT DIRECTION OF TRAVEL LIMIT LINE OR TYPE G\,, CROSSWALK MARKER �+\_4" WHITE LINE TYP U161 L "A" NTS WALNUT AVE INSTALL DETAIL "A" 10' P TYP INSTALL 12" WHIIIIE LINT T. cp U w 1 °�, Q NOTE TO CONTRACTOR: Traffic Control shown hereon is concept only. Traffic lanes may have to be modified per Contractor's schedule or construction methods. Contractor shall submit detailed traffic control plans for approval by the City Traffic Engineer ten (10) working days in advance of any proposed modification to these plans or construction phasing. INSTALL DETAIL 38 INSTALL TYPE ARROW SIERRA I IP M%�LL 3 TOLL MEE -qqm�-1- 800- 227- 2600 A PUBLIC SERVICE BY UNDERCROLIND SERVICE ALERT INSTALL DETAIL " INSTALL 12" WHITE LIINE C30(C 110 him �III� !i-- ril WALNUT VILLAGE PKWY 7W INSTALL TYPE`tV ARROW I EC*ND I TYPE II BARRICADE I TYPE III BARRICADE (WITH FLASHERS) -� PORTABLE DELINEATOR (GLUE DOWN) ® FLASHING ARROW BOARD WORK AREA WORK AREA - USING DAILY LANE CLOSURES '-1► DIRECTION OF TRAVEL -♦ - TEMPORARY K -RAIL (WITH REFLECTIVE TABS) HIP= TEMPORARY CRASH CUSHIONS, ARRAY AS NOTED. SIGN AND POST —{ HIGH LEVEL WARNING DEVICE PA PEDESTRIAN ACCESS, SEE GENERAL NOTE 20. INSTALL TYPE IV ARROW r --INSTALL DETAIL 38 I DURING CONSTRUCTION OF -TH1� AREA, CONTRACTOR SHALL i' INSTALL APPROPRIATE TRAFFIC CONTROL DEVICES FOR LANE CLOSURES. INTERSECTION SHALL BE RE -OPENED WI i HIN 5 DAYS, AS DIRECTED BY THE ENGINEER IN THE FIEI.D, REV, REVISION DESCRIPTION DATE I ENGR. CITY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH INA DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND STA.NDA'?DS IN EFFECT. i CA C30(CA) 75 INSTALL DETAIL 12 AVENUE CROSS REFERENCES: O O w J � C/) O u J W STREET IMPROVEMENT PLANS 14,15,16 OF 29 — — iV T Vi11-8(RT) STORM DRAIN IMPROVEMENT PLAN 1 OF 12 TRAFFIC SIGNAL MODIFICATION PLAN 3 OF 3 INSTALL DETAIL 12 AVENUE CROSS REFERENCES: O STREET IMPROVEMENT PLANS 14,15,16 OF 29 SEWER IMPROVEMENT PLANS 2,3,4 OF 6 STORM DRAIN IMPROVEMENT PLAN 1 OF 12 TRAFFIC SIGNAL MODIFICATION PLAN 3 OF 3 COMMUNICATION CONDUIT PLAN 1 OF 3 SIGNING AND STRIPING PLAN 2 OF 5 TRAFFIC CONTROL PHASE 1 1 OF 20 PHASE 2 3 OF 20 PHASE 3 4 OF 20 (PHASE 4) 6 OF 20 (PHASE 5) 7 OF 20 (PHASE 6 8,10 OF 20 (PHASE 7) 12,14 OF 20 (PHASE 8) 19 OF 20 IZ&IMMD]Ik>LllRLOI U&N k We,lU- MEDIANS + STREET IMPROVEMENTS O Prepared Under The Supervision Of 2001 East First Street Santa Ana, CA 92705 TEL: (714)568-7300 FAX; (714)836-5906 CITY OF FONTANA, CALIFORNIA O DRAWN BB' TRAFFIC CONTROL - PHASE 8 SIERRA AVENUE SCALE: DESIGNED BY: BB DATE: 07/31/06 CHECKED BY: AF 00c DRAWING NO.: 4122 7 20 - Date CITY TRAFFIC ENGI R R.C.E. 68819 DATE: �) Q W 88 w z ..-_ ---------- �_q_ < IZ&IMMD]Ik>LllRLOI U&N k We,lU- MEDIANS + STREET IMPROVEMENTS Rp ,FESS/pN ��IEB ky9y No. 37 8/ 30/08 � ClV1\- Q OF cA��F Prepared Under The Supervision Of 2001 East First Street Santa Ana, CA 92705 TEL: (714)568-7300 FAX; (714)836-5906 CITY OF FONTANA, CALIFORNIA SIERRA AVE AND BASELINE AVE IMPROVEMENTS DRAWN BB' TRAFFIC CONTROL - PHASE 8 SIERRA AVENUE SCALE: DESIGNED BY: BB DATE: 07/31/06 CHECKED BY: AF APPROVED BY: Q12b � Imo/ DRAWING NO.: 4122 7 20 - Date CITY TRAFFIC ENGI R R.C.E. 68819 DATE: