Loading...
HomeMy WebLinkAbout4078-16�l\ U /2\ TO FINISH GRADE & FILLED / \ WITH PEA GRAVEL. EXTEND 12" BELOW ROOT BALL TREE TRUNK }..-----WONDER TREE TIE -ATTACH / TO TURNBUCKLE TURNBUCKLE '-- -10 GAGE GALV. WIRE 'REE PER PLAN RBORGUARD IN TURF AREAS .ND FRONT YARDS 1/2" SCH.40 PVC SLEEVE i" EARTH BERM- REMOVE 3RiOR TO SEEDING It"X4"X36" RDWD. DEADMAN )LANT PiT -1 / 1/2X SIZE )F PLANT BALL LANT TABLET- SEE SPECS. tAPPROVED BY: CITY OF FONTANA IA ce, Na 25126 CITY ENGINEER DATE: ROBERT W. WEDDLE TREE GUYING EXP. 12/31/01 �. DRAWN BY: TIMOTHY RASTEDT. C3 fj'r%E OF CAOc \� DATE OF LAST REVISION: STD. PLAN NO. 532 SMT. 1 OF1 TOP 0 OF WALL WALL OR FENCE SCREW OR BOLT -AS CONDITIONS REQUIRE s -o• 10 GA. STAINLESS STEEL WiRE STAINLESS STL. WASHER -AS N CONDITIONS REQUIRE EQU E s R N se - WONDER TiE OR µ EQUAL -AS NEEDED ESPALIERED PLANT BACKFILL OR VINE PER SPECS 1 • NOTE PAINT BOLT OR SCREW TO • , o • MATCH SURFACE BEHIND 1 ROOTOALL ELEVATION VIEW /-WALL 5"X8' CONCRETE VINE COu.ORS IN TURF AREAS ONLY PLAN VIEW Qq�4fESS APPROVED BY: CITY OF FONTANA 29Z � CITY ENGINEER DATE: ROBERT W. WEDDLE VINE PLANTING M' "/01 DRAWN BY: TIMOTHY KA5TEDT. aN. I�•� �F DATE OF LAST REVISION:STD. PLAN NO. 537 SHT. 1 OF1 WALL OR LDAIT OF WORK LINE PER PLAN LIMIT OF GROUNDCOVER TYPICAL. FIRST ROW OF GROUNDCOVER TO BE V-6" AWAY FROM EDGE OF CONSTRUCTION FEATURE, LIMIT OF WORK, OR DRIP LINE OF SHRUBS GROUNDCOVER AREA TYPICAL GROUNDCOVER TO BE PLANTED IN FLATS, CUTTINGS, LINERS, OR 1 GALLON CONTAINERS PER PLAN REFER TO PLANTING NOTES FOR ADDITIONAL SPECIFICATIONS w . O Y• 0 0 0 O O d/ 0 0 0 0 0 0 0 O O O O O 0 0 0 SQUARE SPACING S TRIANGLAR SPACING S SQ. FT. PLANTS WILL; COVER 64 PLANTS 100 PLANTS 4" 7 SQ. FT. 11 SQ. FT. 6" 16 25 8" 28 44 10" 45 70 12" 64 100 15" 100 156 18" 144 225 24" 256 1 400 'S' REFERS TO SPACING ;Z* GROUNDCOVER SPACING GROUND COVER SHALL BE PLANTED IN THE PLANTING AREAS V-6" FROM THE EDGE OF MOWSTRIP OR SIDEWALK TO V-6" FROM THE DRIP LINE OF THE FIRST ROW OF SHRUBS IN A SHRUB MASS ONLY AND V -V TO THE EXISTING WALL OR LIMIT OF WORK LINE. NOT TO SCALE PLAN I SECTION 14 s rn z 1 811 a A 3" DIA. DRAIN PIPE.� SET FLUSH TO FINISH GRADE & FILLED WITH PEA2X DIA. OF GRAVEL. EXTEND ROOT BALL 12" BELOW ROOT BALL -SHINGLE NAiL .•-LODGE POLE - -TREE TRUNK ,CINCH TIE (DO NOT TWIST) PREVAILING WIND DIRECTION -2" DIA LODGEPOLE PINE TREE STAKE COPPER NAPTHENATE TREATED AND DRIVEN IN GROUND TO 2FT. MiN. DEPTH. 2 REQ'D -CINCH TIE' (4) REQ'D -ARBOR GUARD IN TURF AREAS -PREPARED BACKFILL MIX, SEE SPECIFICATIONS 3" HiGH WATER BASIN, AT TIME OF PLANTING FINISH GRADE AGRIFORM TABLETS TO BE ADDED PER MFG. RECOM DS. �OFESAPPROVED BY: CiTY OF FONTANA Na 25126 ' CITY ENGINEER DATE: EXP. 125126 R02ERT W. WEDDLE TREE STAKING DRAWN. BY: TIMOTHY RASTEDT CNIL � F CA0�o\o DATE OF LAST REVISION: STD. PLAN NO. 531 SHT. 10F1 Linear Style Planting with DeepRoot Barriers Determine the correct number of panels to be used. D. Plant the tree(s). . Th Linear style offers a more expansive Depending upon the actual planting Ian and the number of eP 9 P P 9P rooting growth area however adverse soil and drainage 99 9 trees involved the length of linear barrier will vary, but as a conditions may exist in the actual planting area. Take steps general rule of thumb toka the anticipated mature canopy to healthy growth of the tree at planting. Consult with diameter of the tree and add 2 feet (61 cm). This will be the a local Arborist for planting tips and recommendations. number of feet necessary for a linear style planting DRAWN BY: DESIGNED BY: application. (See chart below.) E. If staking or guying is required we recommend using the 0000000d�'d soft, safe and economical alternative to traditional wire A. Choose the barrier that best suits the application. Generally and hose, ArborTie (see www.deeoroot.com for details). ifa sidewalk, patio or driveway is to be protected, 18" 46cm �jHRU�j PLANTING (UB 18-2) is sufficient depth with 12" (30cm) (LB 12-2) as F. If the tree(s) will be subject to maintenance work such as an alternate choice for non-aggressive, deeper rooting trees. lawn mowing or weed trimming we strongly recommend the However for curb and gutter protection or more agressive installation of ArborGard+ Tree Trunk Protectors which are roots 24" (61 cm) (UB 24-2) is generally the better choice. placed around the base of young trees to protect them from otioo�o`oo�o�a: damage by weed trimmers, lawn mowers and small rodents. U (See www.dee root_ .om) B. Dig the trench to the depth based upon the particular Q0) Z barrier chosen. For additional information please visit our website at 0 www.deeproot.com C. Net place lace the barrier in the trench with the vertical ribs O 6- facing toward the tree and align in a straight fashion. It is For information regarding distributors please call: 1 800 ILV helpful to place the barrier against the hardscape. Use the ROOT (458.7668). For help with drainage or other hardscape as a guide and backfill against the barriers to difficult installation questions please call DeepRoot Technical promote a clean smooth fit to the hardscape. Be sure to Support at: 1 800 ROOT TEK (766.8835). keep the barrier's double top edge at least 1/2" (13mm) above grade to ensure roots do not grow over the top. T 1 F 1 SH . 0 For a simple formula to determine the quantity of As little as one side of the tree may need barrier for panels required for a Linear application use: root direction as there may be no hardscape y p Estimated Diameter of the Tree Canopy at Maturity + elsewhere requiring protection. 2' (61 cm) = Length of Barrier per Side. X Z0 DeepRoot LB 12-2, UB 18-2 or UB 24-2 For One Side of Tree O z Sidewalk - Expected Tree Feet of Number of Canopy at Maturity Barrier Panels 12' (3.6m) Dia. +2' (61 cm) - 14' (4.2m) 7 Panels 18' (5.5m) Dia. +2' (61 cm) = 20' (6.1 m) 10 Panels 24' (7.3m) Dia. +2' (61 cm) - 26' (7.9m) 13 Panels Packaging: LB 12-2 40 panels (80' linear ft)/ Carton UB 18-2 26 panels (52' linear ft)/ Carton UB 24-2 20 panels (40' linear ft)/ Carton Line can be separated at any two foot interval. Sidewalk Curb DeepRoot Barrier .19 A.. J NOT TO SCALE Ground Locks Top of Deeproot Barrier Must be at least 1/2" (13mm) above Grade PERMANENT BASIN 1 1/2"X MIN. RO( 2X THE WIDTH OF PUDDLE AND SETTLE PRIOR TO PLACEMENT OF SHRUB I TO FORM IASIN r -R TABLETS ALL FILL MIX. PERMANENT 13ASiN EXISTING SLOPE / IL7 I- - 1 1/2"X MIN. ROOTBALL DEPTH 2X THE WIDTH OF ROOTBALL PUDDLE AND SETTLE BACKFIL PRiOR TO PLACEMENT OF SHRUB ------TAPER 1:1 MAX. CUT SLOPE O PLANT PIT v-r,ACKF,LL FERTILIZER TABLETS (SEE SPECS.) ROOTBALL MIX. (SEE SPECS. Linear Application of DeepRoot Tree Root Barriers at Time of Installing Concrete Sidewalks and Curbs TYPICAL SECTION OF CURB AND GUTTER WITH DEEPROOT TREE ROOT BARRIER INSET INTO CONCRETE. BARRIER INSTALLED IN A TRENCH IN SUBGRADE WHICH IS THEN COMPACTED. BARRIER IS SET SO THAT TOP EDGE WILL BE 2" (5CM) BELOW FINISH GRADE OF CURB, AND SET FLUSH WITH EDGE OF CURB. BARRIER RIBS FACE TOWARD To of root barrier 2 5cm bel TREE ROOTS. e 0 Top ) finishra a of curb 9 d INSTALLATION SEQUENCE: 1. Prepare base and subgrade Concret\ 2. Trench to appropriate depth for installation of root barrier so that top of barrier is 2 (5cm) below finish grade of top of curb. Compacted crushed base 3. Place root barrier in trench, vertical ribs must face toward tree roots. action comrade 4. Backfill and compact to requirements. Subgrade p 5. Place form material against barrier (It may be Typical DeepRoot UB 24-2, nailed from the outside of the form) optional use of UB 18-2 TYPICAL SECTION OF CURB, GUTTER AND SIDEWA43TALLATION SEQUENCE: WITH DEEPROOT TREE ROOT BARRIER INSET INTO Ii^ CONCRETE 1. Prepare base and subgrade 2. Trench to appropriate depth for BARRIER INSTALLED IN A TRENCH IN SUBGRADE installation of root barrier so that WHICH IS THEN COMPACTED. BARRIER IS SET top of barrier is 2 (5cm) below SO THAT TOP EDGE WILL BE 2" (5CM) ABOVE finish grade of top of sidewalk (or COMPACTED BASE (or halfway between base halfway between top of compacted bas and finish grade of SW). BARRIER RIBS and finish grade of SW) FACE TOWARD TREE ROOTS. 3. Place root barrier in trench, vertical "All Concrete ribs must face toward tree roots. A 4. Backfill and compact to requirements. 5. Place form material against barrier (It may be nailed from the outside of the form) Subgrade compacti n -Compacted crushed base.-' Typical DeepRoot UB 24 optional use of UB 18-2 IMPORTANT NOTE: Tree location must align with "as -built" center of barrier. "Al, • Top of root barneri-*:: (JCm) belOW rlrlrsn:;}:;}:, grace or curD,_.. 1 5/8" (16mm�' I I DeepRoot UB 24-2, SII UB 18-2 or LB 12-2 /2\ NOTE: CONTRACTOR TO PROVIDE 'DEEP ROOT' BRAND BARRIER OR EQUAL, TO BE APPROVED BY VARIOUS LANDSCAPE ARCHITECT. Surround Style Planting with `Deeprbt niversal Barriers When selecting the Surround style planting application you will F. If staking or gtying i required we recommend using have the greatest success b following these simple steps as the soft safe n econ mica) alternative to traditional wire 9 Y 9 P P A www.deP root_rom illustrated below: and hose, rbdr e (s p for details) A. Prepare the initial planting hole as illustrated below. This is G. If the trees ill be ubject to maintenance work such P P 9 (� 1 based upon the combination of desired barrier diameter and as lawn mowing cir wee trimming we strongly recommend depth. Consider if drainage devices or amendments the installation ok Arborard+ Tree Trunk Protectors which are needed to correct any adverse soil or planting conditions are placed around the b ae of young trees to protect in the backfill area. them from dama e by eed trimmers, dawn mowers and small rodents. kS e B. Assemble theappropriate n mber of DeepRoot Universal u P Barrier panels. The vertical root deflecting ribs on the panel H. Water and fellow pro er tree maintenance practices. must face inward, toward the root ball. (This is very important, otherwise the roots will become girdled by Trees do requiFe care ai id nurturing after planting. Consult traveling around the smooth walled surface) with your local's Pplier or proper care procedures for the species you ar plar The planting instructions given here C. Next lace the barrier in the center of the planting hole,are b no meas com rehensive guide. Rather the are P P 9Y 9 Y keeping in mind that the double top edge of the barrier general guideliil�to pk nting with De--pRoot Barriers and a should be positioned approximately 1 /2" 13mm above rade. survey of current' planti methods. Conditions will vary P PP Y ( ) 9 9 This helps retard potential root overgrowth. Failing to position however and it is teco andad that an Arborist be the top edge above grade can allow root overgrowth which consulted before plantir g. can lead to uprooted hardscapes. For additional irlf rmati n please visit our website at D. Backfill and compact with soil inside the barrier to the level where the bottom of the root ball will be when positioned correctly with the crown of the root ball For information re gardin I distributors please call: 1 800 ILV approximately 1 " (26mm) above grade. ROOT (458.766 ). For ielp with drainage or other difficult installation u�stons pl ase call DeepRoot Technical E. Remove the tree from its container, or cut away the top Support at: 1 $0 R00 TEK (766.8835). portion of burls and position in the center of the barrier. Complete the backfill of the soil. Distribute evenly to maintain the shape of the barrier and compact the backfill every 4"-6" (1 Ocm-15cm). Roots will die quickly if left exposed to the elements so keep exposure of the roots to a minimum. A Typical Surround Planting Installation Using DeepRoot Universal Barrier Top of DeepRoot Barrier SidewalkMu be at least 1/2" (13mm) above Grade. Curb O 0-0 O O O O O 60 0 0 Soil Backfill DeepRoot Barrier O Subgrade DeepRoot Barrier (UB 18-2 or UB 24-2) (UB 18-2 or UB. 24-2) 39" Minimum (99cm) Minimum 3 Times Root Ball Diameter (Where Possible) SIDEWALK OR WALKWAY V I TY REQUIRED •NOTE S MAINTAIN 1 2 PLANTING SPACING t ---e FOREGROUND PLANTING - iMECTIONS: MAINTENANCE GUIDELINES: Q /FROM IRRIGATION BEAD SEE PLAN FOR SPACING AND TYPE 1 • It is the Landscape Contractor's responsibility to contact1hd Engineering Division's Landscape shall be maintained in a nes#, clean, weed -free a d Rhea by condition. This shall --� SPRINKLER HEAD LOCATION Landscape Inspector 48 hours prior to desired Inspection ofan item at (909) 350-6649. include but not be limited to: 111 1 I2 Prior to release of utilities or maintenance period commencement, the following 1. Cultivation of planted beds at intervals not to exceed # n (10) days. CE MAINTAIN 1/2 PLANT SPACING WIDTH inspections are required: p g FROM HEAD LOCATION, MINIMUM 2. Regular mowing 'to maintain iawh height not to exceed tato (2 inches (will vary with species). I (I.E. FOR A 3' O.C.SPACING - MAINTAIN 18" CLIQ Pre -Construction Meeting 3. Regular pruning of plants as necessary to control and direct C. rowth. inspection of Irrigation system In open trench condition -(prior to backfilo. Mainline 4. Scheduled maintenance of Irrigation controller to assute prop ))r application `rate of ---� BACKGROUND PLANTING - pressure test ® 160 P.S.I. for a three (3) hour continuous period. water necessary for proper plant growth. I SEE PLAN FOR SPACING AND TYPE Irrigation cx»rerage tests•including Initial and final tests. SPRINKLER HEAD LOCATION `"' S. Immediate replacement of irrigation materials as needed to rr aintain good working conditions. Finish grade prior to planting. L MAINTAIN 1/2 PLANT SPACING WIDTH 6. Fertilization on a regular schedule as recommended by anufacturer to provide proper FROM HEAD LOCATION, MINIMUM, Plant materials prior to planting and soil preparation. plant growth. I.E. FOR" A Including r t Contact the Parks Planning & Landscape ( O 5 O.C. SPACING - Planting, Incl d n street rasa. nt h P Ann La Development 7. Immediate repair or replacement of irri anon materials al. ne ,dad to maintain good I MAINTAIN 30" CLR.) Section, Englneerriing Division, for species and final locations. working conditions. P g Compliance with approved plans. 8. Stakes, guys & ties on trees shall be checked re ularl f r co rect function. Ties are to be TOP OF SLOPE, TYPICAL g y g adjusted to avoid abrasions or girdling of trunk or branC es. rr Final Inspection. 12 ® PROPERTY LINE3. ` 9. Upon completion of three (3) month (90 day) contract �Alnte ance period, an inspection WITH WALL TREATMENT shall be made by the Community Development Department ngineedng Division LandscapeA Inspection Staff. The landscape shall be maintained in Accor' ance with these landscape ' The Owner's representative and landscape contractor shall be presets at each Inspection. maintenance standards. 10. The Developer/Builder is responsible to contact the Ci y and ;chedule the maintenance SHRUB SPACING AT IRRIGATION HEADS - inspection. NOT TO SCALE PLAN I TY I, FONTANA Q10EsSipy�l APPROVED BY: OF FONTANA QROfLSSw/APPROVED BY: CITY OF FONTANA Q DRAWN BY: DESIGNED BY: COYOTE CANYON ARK SITE LANDSCAPE PLANS 0000000d�'d DATE: CHECKED BY: R /8Y: .. Z DATE. Na 25126 CITY ENGINEER DATE: �jHRU�j PLANTING �- 0) A CITY ENGINEER DATE: Na 25126 5 H RU B ON SLOPE ROBERT W. WEDDLE EXP. 12/31/41 04 ' otioo�o`oo�o�a: 0 U ROBERT W. WEDDLE Q0) Z x DRAWN BY: TIMOTHY RASTEDT. J 0 Z O 6- It EXP 12/31/41 x, DRAWN BY: TIMOTHY RASTEDT GVR. � jf t;tl DATE OF LAST REVISION: CAL �' � f GNl �i E td DATE OF LAST REVISION: OF C Al l STD. PLAN N O. 535 T 1 F 1 SH . 0 STD. PLAN N O. 536 SHT. 10F1 Linear Application of DeepRoot Tree Root Barriers at Time of Installing Concrete Sidewalks and Curbs TYPICAL SECTION OF CURB AND GUTTER WITH DEEPROOT TREE ROOT BARRIER INSET INTO CONCRETE. BARRIER INSTALLED IN A TRENCH IN SUBGRADE WHICH IS THEN COMPACTED. BARRIER IS SET SO THAT TOP EDGE WILL BE 2" (5CM) BELOW FINISH GRADE OF CURB, AND SET FLUSH WITH EDGE OF CURB. BARRIER RIBS FACE TOWARD To of root barrier 2 5cm bel TREE ROOTS. e 0 Top ) finishra a of curb 9 d INSTALLATION SEQUENCE: 1. Prepare base and subgrade Concret\ 2. Trench to appropriate depth for installation of root barrier so that top of barrier is 2 (5cm) below finish grade of top of curb. Compacted crushed base 3. Place root barrier in trench, vertical ribs must face toward tree roots. action comrade 4. Backfill and compact to requirements. Subgrade p 5. Place form material against barrier (It may be Typical DeepRoot UB 24-2, nailed from the outside of the form) optional use of UB 18-2 TYPICAL SECTION OF CURB, GUTTER AND SIDEWA43TALLATION SEQUENCE: WITH DEEPROOT TREE ROOT BARRIER INSET INTO Ii^ CONCRETE 1. Prepare base and subgrade 2. Trench to appropriate depth for BARRIER INSTALLED IN A TRENCH IN SUBGRADE installation of root barrier so that WHICH IS THEN COMPACTED. BARRIER IS SET top of barrier is 2 (5cm) below SO THAT TOP EDGE WILL BE 2" (5CM) ABOVE finish grade of top of sidewalk (or COMPACTED BASE (or halfway between base halfway between top of compacted bas and finish grade of SW). BARRIER RIBS and finish grade of SW) FACE TOWARD TREE ROOTS. 3. Place root barrier in trench, vertical "All Concrete ribs must face toward tree roots. A 4. Backfill and compact to requirements. 5. Place form material against barrier (It may be nailed from the outside of the form) Subgrade compacti n -Compacted crushed base.-' Typical DeepRoot UB 24 optional use of UB 18-2 IMPORTANT NOTE: Tree location must align with "as -built" center of barrier. "Al, • Top of root barneri-*:: (JCm) belOW rlrlrsn:;}:;}:, grace or curD,_.. 1 5/8" (16mm�' I I DeepRoot UB 24-2, SII UB 18-2 or LB 12-2 /2\ NOTE: CONTRACTOR TO PROVIDE 'DEEP ROOT' BRAND BARRIER OR EQUAL, TO BE APPROVED BY VARIOUS LANDSCAPE ARCHITECT. Surround Style Planting with `Deeprbt niversal Barriers When selecting the Surround style planting application you will F. If staking or gtying i required we recommend using have the greatest success b following these simple steps as the soft safe n econ mica) alternative to traditional wire 9 Y 9 P P A www.deP root_rom illustrated below: and hose, rbdr e (s p for details) A. Prepare the initial planting hole as illustrated below. This is G. If the trees ill be ubject to maintenance work such P P 9 (� 1 based upon the combination of desired barrier diameter and as lawn mowing cir wee trimming we strongly recommend depth. Consider if drainage devices or amendments the installation ok Arborard+ Tree Trunk Protectors which are needed to correct any adverse soil or planting conditions are placed around the b ae of young trees to protect in the backfill area. them from dama e by eed trimmers, dawn mowers and small rodents. kS e B. Assemble theappropriate n mber of DeepRoot Universal u P Barrier panels. The vertical root deflecting ribs on the panel H. Water and fellow pro er tree maintenance practices. must face inward, toward the root ball. (This is very important, otherwise the roots will become girdled by Trees do requiFe care ai id nurturing after planting. Consult traveling around the smooth walled surface) with your local's Pplier or proper care procedures for the species you ar plar The planting instructions given here C. Next lace the barrier in the center of the planting hole,are b no meas com rehensive guide. Rather the are P P 9Y 9 Y keeping in mind that the double top edge of the barrier general guideliil�to pk nting with De--pRoot Barriers and a should be positioned approximately 1 /2" 13mm above rade. survey of current' planti methods. Conditions will vary P PP Y ( ) 9 9 This helps retard potential root overgrowth. Failing to position however and it is teco andad that an Arborist be the top edge above grade can allow root overgrowth which consulted before plantir g. can lead to uprooted hardscapes. For additional irlf rmati n please visit our website at D. Backfill and compact with soil inside the barrier to the level where the bottom of the root ball will be when positioned correctly with the crown of the root ball For information re gardin I distributors please call: 1 800 ILV approximately 1 " (26mm) above grade. ROOT (458.766 ). For ielp with drainage or other difficult installation u�stons pl ase call DeepRoot Technical E. Remove the tree from its container, or cut away the top Support at: 1 $0 R00 TEK (766.8835). portion of burls and position in the center of the barrier. Complete the backfill of the soil. Distribute evenly to maintain the shape of the barrier and compact the backfill every 4"-6" (1 Ocm-15cm). Roots will die quickly if left exposed to the elements so keep exposure of the roots to a minimum. A Typical Surround Planting Installation Using DeepRoot Universal Barrier Top of DeepRoot Barrier SidewalkMu be at least 1/2" (13mm) above Grade. Curb O 0-0 O O O O O 60 0 0 Soil Backfill DeepRoot Barrier O Subgrade DeepRoot Barrier (UB 18-2 or UB 24-2) (UB 18-2 or UB. 24-2) 39" Minimum (99cm) Minimum 3 Times Root Ball Diameter (Where Possible) SIDEWALK OR WALKWAY V I TY REQUIRED •NOTE S MAINTAIN 1 2 PLANTING SPACING t ---e FOREGROUND PLANTING - iMECTIONS: MAINTENANCE GUIDELINES: Q /FROM IRRIGATION BEAD SEE PLAN FOR SPACING AND TYPE 1 • It is the Landscape Contractor's responsibility to contact1hd Engineering Division's Landscape shall be maintained in a nes#, clean, weed -free a d Rhea by condition. This shall --� SPRINKLER HEAD LOCATION Landscape Inspector 48 hours prior to desired Inspection ofan item at (909) 350-6649. include but not be limited to: 111 1 I2 Prior to release of utilities or maintenance period commencement, the following 1. Cultivation of planted beds at intervals not to exceed # n (10) days. CE MAINTAIN 1/2 PLANT SPACING WIDTH inspections are required: p g FROM HEAD LOCATION, MINIMUM 2. Regular mowing 'to maintain iawh height not to exceed tato (2 inches (will vary with species). I (I.E. FOR A 3' O.C.SPACING - MAINTAIN 18" CLIQ Pre -Construction Meeting 3. Regular pruning of plants as necessary to control and direct C. rowth. inspection of Irrigation system In open trench condition -(prior to backfilo. Mainline 4. Scheduled maintenance of Irrigation controller to assute prop ))r application `rate of ---� BACKGROUND PLANTING - pressure test ® 160 P.S.I. for a three (3) hour continuous period. water necessary for proper plant growth. I SEE PLAN FOR SPACING AND TYPE Irrigation cx»rerage tests•including Initial and final tests. SPRINKLER HEAD LOCATION `"' S. Immediate replacement of irrigation materials as needed to rr aintain good working conditions. Finish grade prior to planting. L MAINTAIN 1/2 PLANT SPACING WIDTH 6. Fertilization on a regular schedule as recommended by anufacturer to provide proper FROM HEAD LOCATION, MINIMUM, Plant materials prior to planting and soil preparation. plant growth. I.E. FOR" A Including r t Contact the Parks Planning & Landscape ( O 5 O.C. SPACING - Planting, Incl d n street rasa. nt h P Ann La Development 7. Immediate repair or replacement of irri anon materials al. ne ,dad to maintain good I MAINTAIN 30" CLR.) Section, Englneerriing Division, for species and final locations. working conditions. P g Compliance with approved plans. 8. Stakes, guys & ties on trees shall be checked re ularl f r co rect function. Ties are to be TOP OF SLOPE, TYPICAL g y g adjusted to avoid abrasions or girdling of trunk or branC es. rr Final Inspection. 12 ® PROPERTY LINE3. ` 9. Upon completion of three (3) month (90 day) contract �Alnte ance period, an inspection WITH WALL TREATMENT shall be made by the Community Development Department ngineedng Division LandscapeA Inspection Staff. The landscape shall be maintained in Accor' ance with these landscape ' The Owner's representative and landscape contractor shall be presets at each Inspection. maintenance standards. 10. The Developer/Builder is responsible to contact the Ci y and ;chedule the maintenance SHRUB SPACING AT IRRIGATION HEADS - inspection. NOT TO SCALE PLAN 3'-0" SHRUB TRIANGLE SPACING NOT TO SCALE PLAN PLANTING NOTES 1A 1. BACKFILL MIX: GENERAL PURPOSE SPECIFICATION. CONTRACTOR SHALL CONDUCT A FINAL HORTICULTURAL SOILS ANALYSIS THROUGH A QUALIFIED AGRICULTURAL LABORATORY. SUBMIT RESULTS TO LANDSCAPE ARCHITECT FOR REVIEW AND POTENTIAL MODIFICATION OF BACKFILL MIX AND SOIL PREPARATION SPECIFICATION. SOIL PREPARATION SHALL BE AS FOLLOWS: FOR GROUNDCOVER PLANTING, THE FOLLOWING AMENDMENTS SHALL BE UNIFORMLY BROADCAST AND THOROUGHLY INCORPORATIED TO A MIN. 6" DEPTH BY MEANS OF ROTOTILLER OR EQUAL: AMOUNT/ 1000 S.F.: A. 2 CU. YDS. EARTHWORKS "PLANTING MIX" B. 70 LBS. EARTHWORKS "ESTABLISH" C. 7 LBS. EARTHWORKS 7-1-7 FERTILIZER D. 10 LBS. AGRICULTURAL GYPSUM THE AMENDED SURFACE SOIL. CAN BE USED BACKFILL AROUND TREE AND SHRUBS AND IF ADDITIONAL QUANTITIES ARE REQUIRED, THE FOLLOWING FORMULA SHALL BE USED: A. 7 PARTS BY VOLUME ON-SITE SOIL B. 3 PARTS BY VOLUME EARTHWORKS "PLANTING MIX" C. 70 LBS. EARTHWORKS "ESTABLISH" PER CU. YD. OF MIX D. 7 LBS. EARTHWORKS 7-1-7 FERTILIZER E. 10 LBS. AGRICULTURxxAL GYPSUM PER CU. YD. OF MIX 2. PLANTING TABLETS SHALL BE 21 GRAM AND SHALL BE FURNISHED IN THE FOLLOWING RATIONS: • ONE TABLET PER FIVE (5) GALLON CONTAINER - FOUR TABLETS PER FIFTEEN (15) GALLON CONTAINER - SIX TABLETS PER 24 INCH BOX - EIGHT TABLETS PER SPECIMEN TREE - •3. ALL PLANT MATERIAL SHALL BE SUBJECT TO INSPECTION AND APPROVAL BY DEVELOPER AND / OR LANDSCAPE ARCHITECT. •' 4. ALL PLANT LOCATIONS SHALL BE APPROVED BY LANDSCAPE ARCHITECT AFTER SPOTTING BY CONTRACTOR IN LOCATIONS SHOWN ON PLAN -- PRIOR TO EXCAVATION OF HOLES. 5: ALL VINES AND ESPALIERS TO BE REMOVED FROM THEIR NURSERY STAKES AND ATTACHED TO ADJACENT WALLS AND FENCES WITH VINE TIES AND NURSERY TAPE, AS APPROVED BY LANDSCAPE ARCHITECT. 6. REFER TO WRITTEN SPECIFICATIONS FOR FURTHER INFORMATION. 7. INSTALL 2" DEEP "WALK-ON" BARK AS TOPDRESSING IN ALL SHRUB AREAS AFTER PLANTING IS COMPLETE AS APPROVED BY LANDSCAPE ARCHITECT. 8. ROOT CONTROL TO BE PROVIDED FOR ALL TREES WITHIN 5' OR LESS OF ANY HARD SURFACE LANDSCAPE FEATURE. EARTHWORKS, 365 CORAL CIRCLE, EL SEGUNDO, CA 90245, (310) 322-9702 ATTN: JIM DANIELL 13:54 ` ve:*�T I TY OF FONTANA U U) Q DRAWN BY: DESIGNED BY: COYOTE CANYON ARK SITE LANDSCAPE PLANS 0000000d�'d DATE: CHECKED BY: R /8Y: .. Z DATE. DRAWING NO.: 4078 16 17 �- 0) 00 W 04 ' otioo�o`oo�o�a: 0 U Z < Q0) Z J 0 Z O 6- U� t i W Ow �O�OsOsO�OsO�� 0 z:5; 0� _ am X Z0 W O 3'-0" SHRUB TRIANGLE SPACING NOT TO SCALE PLAN PLANTING NOTES 1A 1. BACKFILL MIX: GENERAL PURPOSE SPECIFICATION. CONTRACTOR SHALL CONDUCT A FINAL HORTICULTURAL SOILS ANALYSIS THROUGH A QUALIFIED AGRICULTURAL LABORATORY. SUBMIT RESULTS TO LANDSCAPE ARCHITECT FOR REVIEW AND POTENTIAL MODIFICATION OF BACKFILL MIX AND SOIL PREPARATION SPECIFICATION. SOIL PREPARATION SHALL BE AS FOLLOWS: FOR GROUNDCOVER PLANTING, THE FOLLOWING AMENDMENTS SHALL BE UNIFORMLY BROADCAST AND THOROUGHLY INCORPORATIED TO A MIN. 6" DEPTH BY MEANS OF ROTOTILLER OR EQUAL: AMOUNT/ 1000 S.F.: A. 2 CU. YDS. EARTHWORKS "PLANTING MIX" B. 70 LBS. EARTHWORKS "ESTABLISH" C. 7 LBS. EARTHWORKS 7-1-7 FERTILIZER D. 10 LBS. AGRICULTURAL GYPSUM THE AMENDED SURFACE SOIL. CAN BE USED BACKFILL AROUND TREE AND SHRUBS AND IF ADDITIONAL QUANTITIES ARE REQUIRED, THE FOLLOWING FORMULA SHALL BE USED: A. 7 PARTS BY VOLUME ON-SITE SOIL B. 3 PARTS BY VOLUME EARTHWORKS "PLANTING MIX" C. 70 LBS. EARTHWORKS "ESTABLISH" PER CU. YD. OF MIX D. 7 LBS. EARTHWORKS 7-1-7 FERTILIZER E. 10 LBS. AGRICULTURxxAL GYPSUM PER CU. YD. OF MIX 2. PLANTING TABLETS SHALL BE 21 GRAM AND SHALL BE FURNISHED IN THE FOLLOWING RATIONS: • ONE TABLET PER FIVE (5) GALLON CONTAINER - FOUR TABLETS PER FIFTEEN (15) GALLON CONTAINER - SIX TABLETS PER 24 INCH BOX - EIGHT TABLETS PER SPECIMEN TREE - •3. ALL PLANT MATERIAL SHALL BE SUBJECT TO INSPECTION AND APPROVAL BY DEVELOPER AND / OR LANDSCAPE ARCHITECT. •' 4. ALL PLANT LOCATIONS SHALL BE APPROVED BY LANDSCAPE ARCHITECT AFTER SPOTTING BY CONTRACTOR IN LOCATIONS SHOWN ON PLAN -- PRIOR TO EXCAVATION OF HOLES. 5: ALL VINES AND ESPALIERS TO BE REMOVED FROM THEIR NURSERY STAKES AND ATTACHED TO ADJACENT WALLS AND FENCES WITH VINE TIES AND NURSERY TAPE, AS APPROVED BY LANDSCAPE ARCHITECT. 6. REFER TO WRITTEN SPECIFICATIONS FOR FURTHER INFORMATION. 7. INSTALL 2" DEEP "WALK-ON" BARK AS TOPDRESSING IN ALL SHRUB AREAS AFTER PLANTING IS COMPLETE AS APPROVED BY LANDSCAPE ARCHITECT. 8. ROOT CONTROL TO BE PROVIDED FOR ALL TREES WITHIN 5' OR LESS OF ANY HARD SURFACE LANDSCAPE FEATURE. EARTHWORKS, 365 CORAL CIRCLE, EL SEGUNDO, CA 90245, (310) 322-9702 ATTN: JIM DANIELL 13:54 ` ve:*�T I TY OF FONTANA U U) Q DRAWN BY: DESIGNED BY: COYOTE CANYON ARK SITE LANDSCAPE PLANS SCALE: DATE: CHECKED BY: R /8Y: .. Z DATE. DRAWING NO.: 4078 16 17 z 0 U U) Q 0 W Q �- 0) 00 W 04 ' 0 0 U Z < Q0) Z J 0 Z O 6- U� t i W Ow U W 0 z:5; 0� _ am X Z0 W O z I.-OQ W z U� J W U (0z �° U U Q Q z . 0 LL. N r i•. U Q S z I- ® Q f � O z p t (,) z (� Q U Q > z 0 0 Z CL Q 16 (- W >- :W 0 0 o Q Lo LO O ® JOB NUMBER CIE -426.11 N 0 PRINCIPAL IN CHARGE Y BOB BORTHWICK 0 U.1 0 PROJECT MANAGER _ U KIRK KELLER Z CL 0 SHEET TITLE ;a PLANTING tO DETAILS c i O E SCALE O N.T.S. 10 REVISIONS QPLAN CHECK CORRECTIONS I CLIENT REVISIONS W PLAN CHECK CORRECTIONS 4/10/06 V ® f•n_ e/rte Z 0 2 � s IL O 0 O ti d 0 W A W IY 0 z Z R 2