HomeMy WebLinkAbout4314-58r. -
SCALE IN FEET
0 40 80 120
p o REV. REVISION DESCRIPTION DATE ENGR. CITY DATE Prepared Under The Supervision 1 s 1 on CITY OF F O N TA N A, CALIFORNIA
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT �°'•
� RpFESS JURUPA AVENUE STREET IMPROVEMENTS
COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL DRAWN BY:
I oil
DIAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, NOILL�AM 5715NG MM DRAINAGE & UTILITY PLAN scALE. 1 "=40'
HDR ENGINEERING, INC BEFORE DA BRING THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO gyp, 9-30- 5 DESIGNED BY: B JS STA 82+40 TO STA 94+40 DATE
2280 MARKET STREET, SUITE 100 YOU DIG YOU DIG BRING THEM INTO CONFORMANCE WITH CONDITIONS sT CIVIL 12/5/2007
RIVERSIDE, CA. 92501 TOLL FREE D00-227-2600 AND STANDARDS IN EFFECT. 'JF of ca��E°� CHECKED BY: APPROVED BY: DRAWING NO.: 5g
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT Date : 12/5/07 WFY rJZ �C� ,/C, 4,� OS/26/VAP (951) 320-7300 4314
CITY ENGINEER R.C.E. 51152 DATE: 247
\\ora—filsrv01\u stn pro 1\200093\003\project—drawings\drainage\200093iO4.dgn 12/6/2007 3:25:14 AM DFI TUSFR