Loading...
HomeMy WebLinkAbout4314-58r. - SCALE IN FEET 0 40 80 120 p o REV. REVISION DESCRIPTION DATE ENGR. CITY DATE Prepared Under The Supervision 1 s 1 on CITY OF F O N TA N A, CALIFORNIA SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT �°'• � RpFESS JURUPA AVENUE STREET IMPROVEMENTS COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL DRAWN BY: I oil DIAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, NOILL�AM 5715NG MM DRAINAGE & UTILITY PLAN scALE. 1 "=40' HDR ENGINEERING, INC BEFORE DA BRING THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO gyp, 9-30- 5 DESIGNED BY: B JS STA 82+40 TO STA 94+40 DATE 2280 MARKET STREET, SUITE 100 YOU DIG YOU DIG BRING THEM INTO CONFORMANCE WITH CONDITIONS sT CIVIL 12/5/2007 RIVERSIDE, CA. 92501 TOLL FREE D00-227-2600 AND STANDARDS IN EFFECT. 'JF of ca��E°� CHECKED BY: APPROVED BY: DRAWING NO.: 5g A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT Date : 12/5/07 WFY rJZ �C� ,/C, 4,� OS/26/VAP (951) 320-7300 4314 CITY ENGINEER R.C.E. 51152 DATE: 247 \\ora—filsrv01\u stn pro 1\200093\003\project—drawings\drainage\200093iO4.dgn 12/6/2007 3:25:14 AM DFI TUSFR