HomeMy WebLinkAbout4312-4CONSTRUCTION NOTES ESTIMATE OF QUANTITIES
OI CONSTRUCT 6 I/2 " AC OVER 4" CMB 46,099 TON
O2 RELOCATE ELECTRIC TRANSFORMER BY OTHERS I EA
O3 NOT USED
® CONSTRUCT MEDIAN FLARE PER SPPWC STD. N/A
PLAN 141-1
O5 CONSTRUCT MEDIAN TAPER PER SPPWC STD. N/A
PLAN 140-2
�6 GRIND EXISTING 2" AC PAVEMENT AND PLACE 2" 109,836 SF
OVERLAY> ADQITIVE
n7 GRIND EXISTING 2.I' AC PAVEMENT AND PLACE Z1t 753,941 SF
\\ora-filsrv01 \ustnproj
HDR ENGINEERING, INC.
2880 MARKET STREET, SUITE 100
RIVERSIDE, CA 92501
(951) 320-7300
093\003\project-drawings\General\200093aO5.dgn
TOLL FREE 1-800-227-2600
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT
REV.
12/13/2007
CONSTRUCTION NOTES
ESTIMATE OF QUANTITIES
4Q ADJUST SEWER MANHOLE TO GRADE PER {P-UL157p.PLAF.1
43 RELOCATE 2 -WIRE CATHODIC TEST STATION (CPTS)
PER IEUA DETAIL
4q RELOCATE 4" COMBINATION AIR AND VACUUM RELIEF
VALVE, PIPING AND APPURTENANCES PER IEUA DETAIL
45 NOT USED
46 NOT USED
47 DISCHARGE STRUCTURE PER CITY OF FONTANA STD. N0. 30C
48 RELOCATE IRRIGATION SYSTEM
qg CONSTRUCT ACCESS AMP PER CITY OF FONTANA
STD. N0. 1004
STORM DRAIN NOTES
129 EA
5 EA
6 EA
N/A
N/A
N/A
N/A
I EAS
ESTIMATE OF QUANTITIES
70
OVERLAY
18" RCP
(D -LOAD)
O8
-CON:R44C�6u-C-kiRo-PER eIT-Y-AF-FONT-e;fh41STD.
18,095
I=FL $
71
-NO-.-i-00,e-
N0-1-00RELOCATE
24" RCP
(D -LOAD)
PER
RELOCATETELEPHONE CABINET BY OTHERS
10
EA
10
NOT USED
N/A
II
CONSTRUCT PCC BUS BAY PER CITY OF FONTANA
9
EA
LF
STD. N0. 1005
CONSTRUCT
48" RCP
IQ
CONSTRUCT 4" PCC SIDEWALK PER CITY OF
153,643
SF
LF
FONTANA STD. N0. 1006
NOT USED
3
13
CONSTRUCT RESIDENTIAL DRIVEWAY ADJACENT
1,942
SF
N/A
SIDEWALK PER CITY OF FONTANA STD. N0. 1001 (MODIFIED)
CONSTRUCT
72" RCP
14
CONSTRUCT RESIDENTIAL DRIVEWAY WITH PARKWAY SIDEWALK
12,927
SF
LF
PER CITY OF FONTANA STD. N0. 1002, SHT I OF 2 (MODIFIED)
CONSTRUCT
2-8'x4'
15
CONSTRUCT COMMERCIAL DRIVEWAY ADJACENT SIDEWALK
1,489
SF
LF
PER CITY OF FONTANA STD. N0. 1001 (MODIFIED)
NOT USED
93,143
16
CONSTRUCT COMMERCIAL AND INDUSTRIAL DRIVEWAY
11,214
SF
N/A
WITH PARKWAY SIDEWALKS PER CITY OF FONTANA
CONSTRUCT
ABANDONMENT SEAL
PER
STD. N0. 1002, SHT 2 OF 2 (MODIFIED)
16
EA
17
RELOCATE EXISTING SUNSCREEN FOR PLANTS
I
EA
18
CONSTRUCT CROSS GUTTER (STANDARD) PER CITY
2,608
SF
80
OF FONTANA STD. N0. 403
MANHOLE
PER SPPWC
19
NOT USED
NSA
QO
GAS METER TO BE RELOCATED BY OTHERS
I
EA
21
CONSTRUCT 8" CURB & GUTTER PER CITY OF
3315561-F
2
EA
FONTANA STD. N0. 1000
INSTALL PIPE
TO PIPE JUNCTION
Q
CONSTRUCT 8" CURB PER CITY OF FONTANA STD.
15,503
LF
212
N0. 1000
105
NOT USED
Q
CONSTRUCT STANDARD ACCESS RAMP PER CITY OF
30
EA
57
FONTANA STD. N0. 1003
In
TO BE VERIFIED AND RELOCATED BY CONTRACTOR
24
NOT USED
NSA
25
CONSTRUCT ACCESS RAMP CASE D TYPE 2 PER
4
EA
SPPWC STD. PLAN N0. III -2
26
ADJUST WATER VALVE TO GRADE PER CITY OF
73
EA
FONTANA STD. N0. 6000
27
ADJUST MANHOLE TO GRADE PER CITY OF FONTANA
52
EA
Q
STD. N0. 2000
ADJUST GAS VALVE TO GRADE
2
EA
SIDEWALK DRAIN PER CITY OF FONTANA
I
EA
QCONSTRUCT
STD. N0. 3001
30
CONSTRUCT 8" ASPHALT CONCRETE DIKE PER CITY
2,621
LF
OF FONTANA STD. N0. 1007
31
CONSTRUCT TYPICAL MEDIAN TREATMENT, SEE
N/A
LANDSCAPE PLANS
Q
POWER POLE TO BE RELOCATED BY OTHERS)
144
EA
33
ADJUST WATER METER TO GRADE
3
EA
34
RELOCATE EXISTING WATER METER (BY OTHERS)
40
EA
35
RELOCATE EXISTING WATER VALVE ((BY OTHERS))
9
EA
36
RELOCATE EXISTING FIRE HYDRANT (BY OTHERS)
17
EA
37
RELOCATE EXISTING MAIL BOX
13
EA
38
RELOCATE EXISTING BUS SHELTER
i
EA
(SEE CONSTRUCTION DETAILS)
39
CONSTRUCT LOCAL DEPRESSION PER SPPWC STD.
34
EA
PLAN 313-I CASE E, H=2"
40
PROTECT IN PLACE
N/A
41
ADJUST ELECTRIC VAULT (BY OTHERS)
3
EA
\\ora-filsrv01 \ustnproj
HDR ENGINEERING, INC.
2880 MARKET STREET, SUITE 100
RIVERSIDE, CA 92501
(951) 320-7300
093\003\project-drawings\General\200093aO5.dgn
TOLL FREE 1-800-227-2600
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT
REV.
12/13/2007
CONSTRUCTION NOTES
ESTIMATE OF QUANTITIES
4Q ADJUST SEWER MANHOLE TO GRADE PER {P-UL157p.PLAF.1
43 RELOCATE 2 -WIRE CATHODIC TEST STATION (CPTS)
PER IEUA DETAIL
4q RELOCATE 4" COMBINATION AIR AND VACUUM RELIEF
VALVE, PIPING AND APPURTENANCES PER IEUA DETAIL
45 NOT USED
46 NOT USED
47 DISCHARGE STRUCTURE PER CITY OF FONTANA STD. N0. 30C
48 RELOCATE IRRIGATION SYSTEM
qg CONSTRUCT ACCESS AMP PER CITY OF FONTANA
STD. N0. 1004
STORM DRAIN NOTES
129 EA
5 EA
6 EA
N/A
N/A
N/A
N/A
I EAS
ESTIMATE OF QUANTITIES
70
CONSTRUCT
18" RCP
(D -LOAD)
PER
PROFILE
614
LF
71
CONSTRUCT
24" RCP
(D -LOAD)
PER
PROFILE
880
LF
72
CONSTRUCT
30" RCP
(D -LOAD)
PER
PROFILE
624
LF
73
CONSTRUCT
48" RCP
(D -LOAD)
PER
PROFILE
182
LF
74
NOT USED
3
EA
89
14"x23" RFEP (D -LOAD) PER PROFILE
30
N/A
75
CONSTRUCT
72" RCP
(D -LOAD)
PER
PROFILE
133
LF
76
CONSTRUCT
2-8'x4'
RCB PER CALTRANS
93
STD.
142
LF
77
NOT USED
93,143
N/A
95
CONSTRUCT COMPRESSIBLE BLANKET CROSSING PER
7
N/A
78
CONSTRUCT
ABANDONMENT SEAL
PER
SPPWC STD. N0. 381-I
16
EA
79
NOT USED
CONSTRUCT 73"Wx45"H RCAP (D -LOAD) PER PROFILE
206
LF
98
CONSTRUCT TRANSITION STRUCTURE PER SPPWC STD. PLAN NO. 340-1
N/A
80
CONSTRUCT
MANHOLE
PER SPPWC
STD.
N0. 320-I
12
EA
SI
CONSTRUCT
MANHOLE
PER SPPWC
STD.
N0. 321-I
2
EA
n
INSTALL PIPE
TO PIPE JUNCTION
1
STRUCTURE
4
EA
REVISION DESCRIPTION I DATE I ENGR. I CITY I DATE
12: 40: 57 PM
DFLTUSER
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT
COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL
SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER,
THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO
BRING THEM INTO'CONFORMANCE WITH CONDITIONS
AND STANDARDS IN EFFECT.
SIGNING AND STRIPING NOTES
ESTIMATE OF QUANTITIES
51
PER SPPWC STD. NO. 332-1
2,315
LF
83
CONSTRUCT PIPE TO RCB JUNCTION STRUCTURE
7
EA
52
PER SPPWC STD. PLAN 334-1
264
LF
84
INSTALL CONCRETE COLLAR PER SPPWC STD. NO. 380-3
7
EA
85
CONSTRUCT CURB INLET STRUCTURE PER
45
EA
54
CITY OF FONTANA STD. PLAN 3004
11,959
LF
86
CONSTRUCT 36" RCP (D -LOAD) PER PROFILE
204
LF
87
CONSTRUCT CONCRETE BULKHEAD PER DETAIL SHEET 62
6
EA
88
REMOVE EXISTING BULKHEAD AND JOIN PIPE
3
EA
89
14"x23" RFEP (D -LOAD) PER PROFILE
30
LF
90
CONSTRUCT 66" RCP (D -LOAD) PER PROFILE
37
LF
91
CONSTRUCT MANHOLE STRUCTURE PER SPPWC STD. NO. 322-1
6
EA
92
NOT USED
375
N/A
93
NOT USED
8,349
N/A
94
NOT USED
93,143
N/A
95
CONSTRUCT COMPRESSIBLE BLANKET CROSSING PER
7
EA
62
SPPWC STD. NO. 225-0
40
EA
96
NOT USED
ON CONSTRUCTION
N/A
97
CONSTRUCT 73"Wx45"H RCAP (D -LOAD) PER PROFILE
206
LF
98
CONSTRUCT TRANSITION STRUCTURE PER SPPWC STD. PLAN NO. 340-1
8
EA
99
29"x45" RFEP (D -LOAD) PER PROFILE
81
LF
100
24"x38" RFEP (D -LOAD) PER PROFILE
225
LF
101
CONSTRUCT 102" RCP (D -LOAD) PER PROFILE
260
LF
10
CONSTRUCT I'x4' RCB PER CALTRANS STANDARD
144
LF
103
CONSTRUCT JUNCTION STRUCTURE PER SPPWC STD. 331-2
1
EA
104
34"x53" RFEP (D -LOAD) PER PROFILE
212
LF
105
NOT USED
N/A
106
CONSTRUCT 19"x30" RFEP (D -LOAD) PER PROFILE
57
LF
In
TO BE VERIFIED AND RELOCATED BY CONTRACTOR
4
EA
REVISION DESCRIPTION I DATE I ENGR. I CITY I DATE
12: 40: 57 PM
DFLTUSER
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT
COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL
SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER,
THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO
BRING THEM INTO'CONFORMANCE WITH CONDITIONS
AND STANDARDS IN EFFECT.
SIGNING AND STRIPING NOTES
ESTIMATE OF QUANTITIES
51
APPLY 4 -INCH DOUBLE YELLOW STRIPE PER
2,315
LF
PAVEMENT
CALTRANS STD. PLAN A20A, DETAIL 22.
SF
41 REMOVE EXISTING
52
INSTALL PAVEMENT MARKING AS SHOWN PER
264
LF
CURB
CALTRANS STD. PLAN A24C, A24D OR A24E.
LF
43 REMOVE EXISTING
53
APPLY DETAIL 29 PER CALTRANS STD. PLAN A20B.
1,073
LF
54
APPLY 8 -INCH WHITE SOLID STRIPE PER
11,959
LF
CROSS GUTTER
CALTRANS STD. PLAN A20D, DETAIL 38.
SF
48 NOT USED
55
APPLY 8 -INCH WHITE STRIPE PER
195
LF
CALTRANS STD. PLAN A20C, DETAIL 37B.
NSA
50 NOT USED
56
APPLY 4 -INCH SOLID WHITE LINE PER DETAIL "A".
8,575
LF
58
APPLY PAVEMENT MARKING AS SHOWN PER
2,175
SF
CONCRETE SLAB
CALTRANS STD. PLAN A24A AND/OR A24B.
SF
53 REMOVE STRUCTURE
59
APPLY 12" YELLOW STRIPE.
375
LF
60
APPLY 12 -INCH WHITE CROSSWALK MARKINGS/LIMIT LINE.
8,349
LF
61
APPLY 4 -INCH DASHED WHITE LINE PER CALTRANS
93,143
LF
32
STD. PLAN A20A, DETAIL 12.
LEGEND
62
INSTALL BLUE REFLECTIVE MARKER ACROSS
40
EA
FROM FIRE HYDRANTS.
ON CONSTRUCTION
63
APPLY DETAIL 40 PER CALTRANS STD. PLAN A20D.
268
LF
64
NOT USED
Q � LEFT OF LINE
N/A
65
APPLY DETAIL 24.
668
LF
01
REMOVE
117
EA
Q
RELOCATE
60
EA
3Q
PROTECT IN PLACE
215
EA
4
INSTALL NEW
69
EA
REMOVAL NOTES
40 REMOVE EXISTING
PAVEMENT
731,022
SF
41 REMOVE EXISTING
SIDEWALK
30,535
SF
42 REMOVE EXISTING
CURB
15,015
LF
43 REMOVE EXISTING
CURB & GUTTER
9,304
LF
44 REMOVE EXISTING
DRIVEWAY
22,342
SF
F4-51 REMOVE EXISTING
CROSS GUTTER
944
SF
48 NOT USED
N/A
49 NOT USED
NSA
50 NOT USED
NSA
51 REMOVE EXISTING
CATCH BASIN
2
EA
52 REMOVE EXISTING
CONCRETE SLAB
1447
SF
53 REMOVE STRUCTURE
330
SF
54 REMOVE FOUNDATION WALL
30
SF
60 REMOVE EXISTING
PIPE
1242
LF
61 REMOVE EXISTING
DRAINAGE STRUCTURE
32
SF
LEGEND
�N REMOVAL .
ON CONSTRUCTION
Q � LEFT OF LINE
DRIVEWAY STATION
r
N 3 RIGHT OF LINE
- W=WIDTH OF DRIVEWAY
N
D=DISTANCE BACK OF R/W
T=THICKNESS & TYPE OF
SURFACE MATERIAL
Prepared Under The Supervision Of
FESS/�
hKIM z
w No. C 57374 A
p,12-31-09
sr4le
CIVIL
OF CAS
Date : 12/5/07
CITY OF FONTANA, CALIFORNIA
JURUPA AVENUE STREET IMPROVEMENTS
DRAW BY: MM SCAT;
CONSTRUCTION NOTES DATE o SCALE
DESIGNED BY: J T 12/5/2007
CHECKED BY: APPROVED BY: DRAWING NO.: 4
TK 4312
th, CITY ENGINEER DATE: 47