HomeMy WebLinkAbout4643AN BER
67
EP
O
c0
+
N
AC BERIM
w
z
_ ,:Ls�m
F" E1ETrt'M
gz
SCALE.' 1 "=60 '
68
O
(O
3 +
a N
y
16'
69 70 15' 71.- 72 w
Z
b
C18Z O W41 C20(RT)
,._:a....„.� - - .. b • �.
ARFwOIEAADD ”a
s�
Z0].
fat
T1
aP
•
• •Ir€
s
¢)
+
w R
16
CLOM
0z a ZQQ Rm
300'
200'
FLANER17 CLOSED
RAMP
0 CLOSEDoa +C3
R17ao
RB & Gu,7uR
21
16
�n
74 12
•b 15 b WORK ZO E _
CB
W1(LT) C30 C30
R16 RAMP
5' MAX.CONES AT 2
CLOSED
LANE SPACING (TYP.)
CLOSED
O
F0
200'
U
9
gz
SCALE.' 1 "=60 °
!3'
200'
CI7y OF F0"IW4
ROAD
00
AHEAD I
O C18
+ al
co AC BEAM
g_ AC GERM
2
�I
f SO4 B��pINo
3
a
OF FONT"
)
100'
(
C30
+
R17
a _...a .. .. _CURB & ER
CURB CUTTER
GENERAL NOTES:
1- WORKING HOURS SHALL BE BETWEEN 9:30 AM AND 3:30 PM
2- USE THIS TRAFFIC CONTROL PLAN FOR CLOSING SB
THRU LANE AT THE WEST BOUND ON RAMP.
3- 3 DAYS ADVANCE NOTICE SHALL BE GIVEN TO CALTRANS TO SET
THE SIGNALS @ THE EAST & WEST RAMPS ON RECALL MODE BEFORE
COMMENCING THE WORK BETWEEN SLOVER AVE. & VALLEY BLVD.
4- TRAFFIC SIGNALS AT THE EAST & WEST RAMPS SHALL BE PUT
ON RED FLASHING MODE DURING THE CONSTRUCTION OF PHASE 1 THRU 4 .
ARRANGEMENTS TO BE MADE W/CALTRANS FOR THE SIGNALS
FLASHING OPERATIONS.
5- ALL TRAFFIC CONTROL DEVICES FOR CONSTRUCTION SHALL
CONFORM TO THE LATEST EDITIONS OF THE "MANUAL OF
TRAFFIC CONTROLS", AND THE CALTRANS STANDARD
SPECIFICATION AND PLANS.
6- ALL SIGNS AND ROADSIDE MARKERS SHALL BE OF HIGH
INTENSITY REFLECTIVE SHEETING.
7- IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
MAINTAIN BARRICADES OR OTHER TRAFFIC CONTROLS AT ALL TIMES.
8- UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL
RESTORE ALL SIGNING, STRIPING, AND OTHER TRAFFIC
CONTROL DEVICES TO THEIR ORIGINAL CONDITION OR IN
ACCORDANCE WITH THE PLANS.
9- ALL CONFLICTING SIGNS SHALL BE EITHER REMOVED,
RELOCATED OR COVERED BY THE CONTRACTOR. RELOCATABLE
SIGNS SHALL BE INSTALLED AS SPECIFIED ON THE PLANS OR AS
DETERMINED IN THE FIELD BY THE ENGINEER.
10- ALL EXISTING STRIPING AND PAVEMENT MARKINGS NOT SHOWN
ON THE PLANS, IF REMOVED DURING CONSTRUCTION, SHALL BE
REPLACED IN CONFORMANCE WITH THE STRIPING PLAN
OR AS DETERMINED BY THE ENGINEER.
11- TAPER LENGTH , NUMBER AND SPACING OF CONES SHALL CONFORM
TO CALTRANS STANDARD PLANS T12 TABLE (1) ,OR AS DETERMINED
IN THE FIELD BY THE ENGINEER.
E
0 8 i
o
z
C)
C)
N 100'
3
ROAD
C18
a AHEAD
4
21
PHASE (1)
---T- C19a
700'
N.T.S.
C19 v
700' CLOSED
N.T.S. AHEAD
= i — BARRICADES W/C2 & C38
7' MMP C2
mosmT
7 C38
T,
200'
ki _ £ m ;
I om;
O
ml # LANE 3 I RK*rrLAHE
CLOG®
c�
Z F `y
MA3� 60 'e! AHEAD OG
W1(LT)C20(RT) +
3 C30 a CuRB A CUTTER a aD
WORK 2DNE 15. 09' •
12' 12'
77 78
7 _.
I 21
_
.. ... CURB � GUTTER € C30 # � -
\, I
R17 Ar.,
LME
V1.8NGv
Z
g •
$ Zi
C) I o ?aR17
,�.. mmn
3 "
GENERAL NOTES:
1- WORKING HOURS SHALL BE BETWEEN 9:30 AM AND 3:30 PM 7- IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
MAINTAIN BARRICADES OR OTHER TRAFFIC CONTROLS AT ALL TIMES.
2- USE THIS TRAFFIC CONTROL PLAN FOR CLOSING WB
OFF RAMP AND THE NB THRU LANE. 8- UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL
RESTORE ALL SIGNING, STRIPING, AND OTHER TRAFFIC
3- 3 DAYS ADVANCE NOTICE SHALL BE GIVEN TO CALTRANS TO SET CONTROL DEVICES TO THEIR ORIGINAL CONDITION OR IN
THE SIGNALS @ THE EAST & WEST RAMPS ON RECALL MODE BEFORE ACCORDANCE WITH THE PLANS.
COMMENCING THE WORK BETWEEN SLOVER AVE. & VALLEY BLVD.
4- TRAFFIC SIGNALS AT THE EAST 6 WEST RAMPS SHALL BE PUT 9- ALL CONFLICTING SIGNS SHALL BE EITHER REMOVED.
RELOCATED OR COVERED BY THE CONTRACTOR. RELOCATABLE
ON RED FLASHING MODE DURING THE CONSTRUCTION OF SIGNS SHALL BE INSTALLED AS SPECIFIED ON THE PLANS OR AS
OF PHASE 1 THRU 4. ARRANGEMENTS TO BE MADE W/CALTRANS DETERMINED IN THE FIELD BY THE ENGINEER.
FOR THE SIGNALS FLASHING OPERATIONS.
5- ALL TRAFFIC CONTROL DEVICES FOR CONSTRUCTION SHALL 10- ALL EXISTING STRIPING AND PAVEMENT MARKINGS NOT SHOWN
CONFORM TO THE LATEST EDITIONS OF THE "MANUAL OF ON THE PLANS, IF REMOVED DURING CONSTRUCTION,SHALL BE
TRAFFIC CONTROLS",AND THE CALTRANS STANDARD REPLACED IN CONFORMANCE WITH THE STRIPING PLAN
SPECIFICATION AND PLANS. OR AS DETERMINED BY THE ENGINEER.
6- ALL SIGNS AND ROADSIDE MARKERS SHALL BE OF HIGH 11- TAPER LENGTH , NUMBER AND SPACING OF CONES SHALL CONFORM PHASE (3)
INTENSITY REFLECTIVE SHEETING. TO CALTRANS STANDARD PLANS T12 TABLE (1) ,OR AS DETERMINED
IN THE FIELD BY THE ENGINEER.
COUNTY OF SAN BERNARDINO
DEPARTMENT OF TRANSPORTATION
CITRUS AVENUE
TRAFFIC CONTROL PLAN
FOR CLOSING EB OFF RAMP
AND SB THRU LANE
FONTANA AREA
TRAFM
DESIGNED BY : EM
DRAWN BY : MS
SCALE ; 1" = 60'
gz
SCALE.' 1 "=60
13'
J4 V C30
LADE
CLD6ED
gz
SCALE.' 1 "=60 '
NO'
1
ROAD � ( }0 z
Of
AHEAD 0 La AHEAD
z
O
U U9
ix
R17 vLAM
4
N
D:
p
N } o • € C30
Ylit
so a€)+
C) R17
MFS
1-
WORKING HOURS SHALL BE BETWEEN 9:30 AM AND 3:30 PM
of
d
-CURB GU TER r '
L 21
6
12'
,CURB � GUTTER
I
CONES AT 25' MAX.
SPACING (TYP.)
iRB s '- D
CURB CUTTER
CORRECTIONS
t.
R SI NT NGI ER DATE
CM► OF FONTANA
200' 300'
00
co I LWT LANE
+ a
CID
r I AFD 3
d B R14 a C20(LT) a
–
w — u.- CITY OF FONT"
w— 82
I v= COUNTY 83 OF SAN BERNARDINO84
_ __..,..__,_ _._
_._ _
U AC BERM
4-1:
N
�I
F gp,�i BERG IND
325
Z
%
R17
'�
o: = LANE
•CLOSED
7y RAMP
o C30 CLOSED
Izl a'1 +
$ e R17
a
f FO -1
88
AC BERM EP
ROAD
AHEAD
a C18
86
15'
12'
O
to
+
N
W
Z
RAMP
CLOSED
)
100' -
C30 a
+
R17
a ,URS Ae GUn1R
CURB GUFFIER
O
r
100'
C30
R17
CURS GUT11E.P
`URB GU7117—R
TYPE II BARRICADE
W/ C30+R17
RAMP
O CLOS•
r
87
GENERAL NOTES:
1- WORKING HOURS SHALL BE BETWEEN 9:30 AM AND 3:30 PM
2- USE THIS TRAFFIC CONTROL PLAN FOR CLOSING SB
LEFT TURN LANE AT THE WEST BOUND RAMPS.
3- 3 DAYS ADVANCE NOTICE SHALL BE GIVEN TO CALTRANS TO SET
THE SIGNALS @ THE EAST & WEST RAMPS ON RECALL MODE BEFORE
COMMENCING THE WORK BETWEEN SLOVER AVE. & VALLEY BLVD.
4- TRAFFIC SIGNALS AT THE EAST & WEST RAMPS SHALL BE PUT
ON RED FLASHING MODE DURING THE CONSTRUCTION OF PHASE 1 THRU 4.
ARRANGEMENTS TO BE MADE W/CALTRANS FOR THE SIGNALS
FLASHING OPERATIONS.
5- ALL TRAFFIC CONTROL DEVICES FOR CONSTRUCTION SHALL
CONFORM TO THE LATEST EDITIONS OF THE "MANUAL OF
TRAFFIC CONTROLS",AND THE CALTRANS STANDARD
SPECIFICATION AND PLANS.
6- ALL SIGNS AND ROADSIDE MARKERS SHALL BE OF HIGH
INTENSITY REFLECTIVE SHEETING.
7- IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
MAINTAIN BARRICADES OR OTHER TRAFFIC CONTROLS AT ALL TIMES.
8- UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL
RESTORE ALL SIGNING, STRIPING, AND OTHER TRAFFIC
CONTROL DEVICES TO THEIR ORIGINAL CONDITION OR IN
ACCORDANCE WITH THE PLANS.
9- ALL CONFLICTING SIGNS SHALL BE EITHER REMOVED,
RELOCATED OR COVERED BY THE CONTRACTOR. RELOCATABLE
SIGNS SHALL BE INSTALLED AS SPECIFIED ON THE PLANS OR AS
DETERMINED IN THE FIELD BY THE ENGINEER.
10- ALL EXISTING STRIPING AND PAVEMENT MARKINGS NOT SHOWN
ON THE PLANS, IF REMOVED DURING CONSTRUCTION, SHALL BE
REPLACED IN CONFORMANCE WITH THE STRIPING PLAN
OR AS DETERMINED BY THE ENGINEER.
11- TAPER LENGTH , NUMBER AND SPACING OF CONES SHALL CONFORM
TO CALTRANS STANDARD PLANS T12 TABLE (1) ,OR AS DETERMINED
IN THE FIELD BY THE ENGINEER.
I�
ROAD
n MEAD
s
I c9
( 100'
C18
15'
12'
211 8
O
O
m
3
PHASE (2)
a �
to
zo 6 LANE
o CLOSED
i
C)
N t � 200'
3
00
C30 gO
R17co
r
12, • r. z W
F -
15
� -.�_,.....+ ->�.�-_....�.....
21
GENERAL NOTES:
}
I oa
1-
WORKING HOURS SHALL BE BETWEEN 9:30 AM AND 3:30 PM
of
2-
USE THIS TRAFFIC CONTROL PLAN FOR CLOSING NB
m1
LEFT TURN LANE AT THE WEST BOUND RAMPS.
:1
N>1
3-
3 DAYS ADVANCE NOTICE SHALL BE GIVEN TO CALTRANS TO SET
3`I
THE SIGNALS @ THE EAST 6 WEST RAMPS ON RECALL MODE BEFORE
COMMENCING THE WORK BETWEEN SLOVER AVE. & VALLEY BLVD.
4-
TRAFFIC SIGNALS AT THE EAST & WEST RAMPS SHALL BE PUT
ON RED FLASHING MODE DURING THE CONSTRUCTION OF PHASE 1 THRU 4.
ARRANGEMENTS TO BE MADE W/CALTRANS FOR THE SIGNALS
FLASHING OPERATIONS.
5-
ALL TRAFFIC CONTROL DEVICES FOR CONSTRUCTION SHALL
CONFORM TO THE LATEST EDITIONS OF THE "MANUAL OF
TRAFFIC CONTROLS",AND THE CALTRANS STANDARD
SPECIFICATION AND PLANS.
6-
ALL SIGNS AND ROADSIDE MARKERS SHALL BE OF HIGH
INTENSITY REFLECTIVE SHEETING.
7-
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
MAINTAIN BARRICADES OR OTHER TRAFFIC CONTROLS AT ALL TIMES.
8-
UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL
RESTORE ALL SIGNING. STRIPING, AND OTHER TRAFFIC
CONTROL DEVICES TO THEIR ORIGINAL CONDITION OR IN
ACCORDANCE WITH THE PLANS.
9-
ALL CONFLICTING SIGNS SHALL BE EITHER REMOVED,
RELOCATED OR COVERED BY THE CONTRACTOR. RELOCATABLE
SIGNS SHALL BE INSTALLED AS SPECIFIED ON THE PLANS OR AS
DETERMINED IN THE FIELD BY THE ENGINEER.
10-
ALL EXISTINGSTRIPING AND PAVEMENT MARKINGS NOT SHOWN
ON THE PLANS, IF REMOVED DURING CONSTRUCTION, SHALL BE
REPLACED IN CONFORMANCE WITH THE STRIPING PLAN
OR AS DETERMINED BY THE ENGINEER.
11-
TAPER LENGTH , NUMBER AND SPACING OF CONES SHALL CONFORM
TO CALTRANS STANDARD PLANS T12 TABLE (1) ,OR AS DETERMINED
IN THE FIELD BY THE ENGINEER.
PHASE(4)