Loading...
HomeMy WebLinkAbout4643AN BER 67 EP O c0 + N AC BERIM w z _ ,:Ls�m F" E1ETrt'M gz SCALE.' 1 "=60 ' 68 O (O 3 + a N y 16' 69 70 15' 71.- 72 w Z b C18Z O W41 C20(RT) ,._:a....„.� - - .. b • �. ARFwOIEAADD ”a s� Z0]. fat T1 aP • • •Ir€ s ¢) + w R 16 CLOM 0z a ZQQ Rm 300' 200' FLANER17 CLOSED RAMP 0 CLOSEDoa +C3 R17ao RB & Gu,7uR 21 16 �n 74 12 •b 15 b WORK ZO E _ CB W1(LT) C30 C30 R16 RAMP 5' MAX.CONES AT 2 CLOSED LANE SPACING (TYP.) CLOSED O F0 200' U 9 gz SCALE.' 1 "=60 ° !3' 200' CI7y OF F0"IW4 ROAD 00 AHEAD I O C18 + al co AC BEAM g_ AC GERM 2 �I f SO4 B��pINo 3 a OF FONT" ) 100' ( C30 + R17 a _...a .. .. _CURB & ER CURB CUTTER GENERAL NOTES: 1- WORKING HOURS SHALL BE BETWEEN 9:30 AM AND 3:30 PM 2- USE THIS TRAFFIC CONTROL PLAN FOR CLOSING SB THRU LANE AT THE WEST BOUND ON RAMP. 3- 3 DAYS ADVANCE NOTICE SHALL BE GIVEN TO CALTRANS TO SET THE SIGNALS @ THE EAST & WEST RAMPS ON RECALL MODE BEFORE COMMENCING THE WORK BETWEEN SLOVER AVE. & VALLEY BLVD. 4- TRAFFIC SIGNALS AT THE EAST & WEST RAMPS SHALL BE PUT ON RED FLASHING MODE DURING THE CONSTRUCTION OF PHASE 1 THRU 4 . ARRANGEMENTS TO BE MADE W/CALTRANS FOR THE SIGNALS FLASHING OPERATIONS. 5- ALL TRAFFIC CONTROL DEVICES FOR CONSTRUCTION SHALL CONFORM TO THE LATEST EDITIONS OF THE "MANUAL OF TRAFFIC CONTROLS", AND THE CALTRANS STANDARD SPECIFICATION AND PLANS. 6- ALL SIGNS AND ROADSIDE MARKERS SHALL BE OF HIGH INTENSITY REFLECTIVE SHEETING. 7- IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES OR OTHER TRAFFIC CONTROLS AT ALL TIMES. 8- UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, AND OTHER TRAFFIC CONTROL DEVICES TO THEIR ORIGINAL CONDITION OR IN ACCORDANCE WITH THE PLANS. 9- ALL CONFLICTING SIGNS SHALL BE EITHER REMOVED, RELOCATED OR COVERED BY THE CONTRACTOR. RELOCATABLE SIGNS SHALL BE INSTALLED AS SPECIFIED ON THE PLANS OR AS DETERMINED IN THE FIELD BY THE ENGINEER. 10- ALL EXISTING STRIPING AND PAVEMENT MARKINGS NOT SHOWN ON THE PLANS, IF REMOVED DURING CONSTRUCTION, SHALL BE REPLACED IN CONFORMANCE WITH THE STRIPING PLAN OR AS DETERMINED BY THE ENGINEER. 11- TAPER LENGTH , NUMBER AND SPACING OF CONES SHALL CONFORM TO CALTRANS STANDARD PLANS T12 TABLE (1) ,OR AS DETERMINED IN THE FIELD BY THE ENGINEER. E 0 8 i o z C) C) N 100' 3 ROAD C18 a AHEAD 4 21 PHASE (1) ---T- C19a 700' N.T.S. C19 v 700' CLOSED N.T.S. AHEAD = i — BARRICADES W/C2 & C38 7' MMP C2 mosmT 7 C38 T, 200' ki _ £ m ; I om; O ml # LANE 3 I RK*rrLAHE CLOG® c� Z F `y MA3� 60 'e! AHEAD OG W1(LT)C20(RT) + 3 C30 a CuRB A CUTTER a aD WORK 2DNE 15. 09' • 12' 12' 77 78 7 _. I 21 _ .. ... CURB � GUTTER € C30 # � - \, I R17 Ar., LME V1.8NGv Z g • $ Zi C) I o ?aR17 ,�.. mmn 3 " GENERAL NOTES: 1- WORKING HOURS SHALL BE BETWEEN 9:30 AM AND 3:30 PM 7- IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES OR OTHER TRAFFIC CONTROLS AT ALL TIMES. 2- USE THIS TRAFFIC CONTROL PLAN FOR CLOSING WB OFF RAMP AND THE NB THRU LANE. 8- UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, AND OTHER TRAFFIC 3- 3 DAYS ADVANCE NOTICE SHALL BE GIVEN TO CALTRANS TO SET CONTROL DEVICES TO THEIR ORIGINAL CONDITION OR IN THE SIGNALS @ THE EAST & WEST RAMPS ON RECALL MODE BEFORE ACCORDANCE WITH THE PLANS. COMMENCING THE WORK BETWEEN SLOVER AVE. & VALLEY BLVD. 4- TRAFFIC SIGNALS AT THE EAST 6 WEST RAMPS SHALL BE PUT 9- ALL CONFLICTING SIGNS SHALL BE EITHER REMOVED. RELOCATED OR COVERED BY THE CONTRACTOR. RELOCATABLE ON RED FLASHING MODE DURING THE CONSTRUCTION OF SIGNS SHALL BE INSTALLED AS SPECIFIED ON THE PLANS OR AS OF PHASE 1 THRU 4. ARRANGEMENTS TO BE MADE W/CALTRANS DETERMINED IN THE FIELD BY THE ENGINEER. FOR THE SIGNALS FLASHING OPERATIONS. 5- ALL TRAFFIC CONTROL DEVICES FOR CONSTRUCTION SHALL 10- ALL EXISTING STRIPING AND PAVEMENT MARKINGS NOT SHOWN CONFORM TO THE LATEST EDITIONS OF THE "MANUAL OF ON THE PLANS, IF REMOVED DURING CONSTRUCTION,SHALL BE TRAFFIC CONTROLS",AND THE CALTRANS STANDARD REPLACED IN CONFORMANCE WITH THE STRIPING PLAN SPECIFICATION AND PLANS. OR AS DETERMINED BY THE ENGINEER. 6- ALL SIGNS AND ROADSIDE MARKERS SHALL BE OF HIGH 11- TAPER LENGTH , NUMBER AND SPACING OF CONES SHALL CONFORM PHASE (3) INTENSITY REFLECTIVE SHEETING. TO CALTRANS STANDARD PLANS T12 TABLE (1) ,OR AS DETERMINED IN THE FIELD BY THE ENGINEER. COUNTY OF SAN BERNARDINO DEPARTMENT OF TRANSPORTATION CITRUS AVENUE TRAFFIC CONTROL PLAN FOR CLOSING EB OFF RAMP AND SB THRU LANE FONTANA AREA TRAFM DESIGNED BY : EM DRAWN BY : MS SCALE ; 1" = 60' gz SCALE.' 1 "=60 13' J4 V C30 LADE CLD6ED gz SCALE.' 1 "=60 ' NO' 1 ROAD � ( }0 z Of AHEAD 0 La AHEAD z O U U9 ix R17 vLAM 4 N D: p N } o • € C30 Ylit so a€)+ C) R17 MFS 1- WORKING HOURS SHALL BE BETWEEN 9:30 AM AND 3:30 PM of d -CURB GU TER r ' L 21 6 12' ,CURB � GUTTER I CONES AT 25' MAX. SPACING (TYP.) iRB s '- D CURB CUTTER CORRECTIONS t. R SI NT NGI ER DATE CM► OF FONTANA 200' 300' 00 co I LWT LANE + a CID r I AFD 3 d B R14 a C20(LT) a – w — u.- CITY OF FONT" w— 82 I v= COUNTY 83 OF SAN BERNARDINO84 _ __..,..__,_ _._ _._ _ U AC BERM 4-1: N �I F gp,�i BERG IND 325 Z % R17 '� o: = LANE •CLOSED 7y RAMP o C30 CLOSED Izl a'1 + $ e R17 a f FO -1 88 AC BERM EP ROAD AHEAD a C18 86 15' 12' O to + N W Z RAMP CLOSED ) 100' - C30 a + R17 a ,URS Ae GUn1R CURB GUFFIER O r 100' C30 R17 CURS GUT11E.P `URB GU7117—R TYPE II BARRICADE W/ C30+R17 RAMP O CLOS• r 87 GENERAL NOTES: 1- WORKING HOURS SHALL BE BETWEEN 9:30 AM AND 3:30 PM 2- USE THIS TRAFFIC CONTROL PLAN FOR CLOSING SB LEFT TURN LANE AT THE WEST BOUND RAMPS. 3- 3 DAYS ADVANCE NOTICE SHALL BE GIVEN TO CALTRANS TO SET THE SIGNALS @ THE EAST & WEST RAMPS ON RECALL MODE BEFORE COMMENCING THE WORK BETWEEN SLOVER AVE. & VALLEY BLVD. 4- TRAFFIC SIGNALS AT THE EAST & WEST RAMPS SHALL BE PUT ON RED FLASHING MODE DURING THE CONSTRUCTION OF PHASE 1 THRU 4. ARRANGEMENTS TO BE MADE W/CALTRANS FOR THE SIGNALS FLASHING OPERATIONS. 5- ALL TRAFFIC CONTROL DEVICES FOR CONSTRUCTION SHALL CONFORM TO THE LATEST EDITIONS OF THE "MANUAL OF TRAFFIC CONTROLS",AND THE CALTRANS STANDARD SPECIFICATION AND PLANS. 6- ALL SIGNS AND ROADSIDE MARKERS SHALL BE OF HIGH INTENSITY REFLECTIVE SHEETING. 7- IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES OR OTHER TRAFFIC CONTROLS AT ALL TIMES. 8- UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, AND OTHER TRAFFIC CONTROL DEVICES TO THEIR ORIGINAL CONDITION OR IN ACCORDANCE WITH THE PLANS. 9- ALL CONFLICTING SIGNS SHALL BE EITHER REMOVED, RELOCATED OR COVERED BY THE CONTRACTOR. RELOCATABLE SIGNS SHALL BE INSTALLED AS SPECIFIED ON THE PLANS OR AS DETERMINED IN THE FIELD BY THE ENGINEER. 10- ALL EXISTING STRIPING AND PAVEMENT MARKINGS NOT SHOWN ON THE PLANS, IF REMOVED DURING CONSTRUCTION, SHALL BE REPLACED IN CONFORMANCE WITH THE STRIPING PLAN OR AS DETERMINED BY THE ENGINEER. 11- TAPER LENGTH , NUMBER AND SPACING OF CONES SHALL CONFORM TO CALTRANS STANDARD PLANS T12 TABLE (1) ,OR AS DETERMINED IN THE FIELD BY THE ENGINEER. I� ROAD n MEAD s I c9 ( 100' C18 15' 12' 211 8 O O m 3 PHASE (2) a � to zo 6 LANE o CLOSED i C) N t � 200' 3 00 C30 gO R17co r 12, • r. z W F - 15 � -.�_,.....+ ->�.�-_....�..... 21 GENERAL NOTES: } I oa 1- WORKING HOURS SHALL BE BETWEEN 9:30 AM AND 3:30 PM of 2- USE THIS TRAFFIC CONTROL PLAN FOR CLOSING NB m1 LEFT TURN LANE AT THE WEST BOUND RAMPS. :1 N>1 3- 3 DAYS ADVANCE NOTICE SHALL BE GIVEN TO CALTRANS TO SET 3`I THE SIGNALS @ THE EAST 6 WEST RAMPS ON RECALL MODE BEFORE COMMENCING THE WORK BETWEEN SLOVER AVE. & VALLEY BLVD. 4- TRAFFIC SIGNALS AT THE EAST & WEST RAMPS SHALL BE PUT ON RED FLASHING MODE DURING THE CONSTRUCTION OF PHASE 1 THRU 4. ARRANGEMENTS TO BE MADE W/CALTRANS FOR THE SIGNALS FLASHING OPERATIONS. 5- ALL TRAFFIC CONTROL DEVICES FOR CONSTRUCTION SHALL CONFORM TO THE LATEST EDITIONS OF THE "MANUAL OF TRAFFIC CONTROLS",AND THE CALTRANS STANDARD SPECIFICATION AND PLANS. 6- ALL SIGNS AND ROADSIDE MARKERS SHALL BE OF HIGH INTENSITY REFLECTIVE SHEETING. 7- IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES OR OTHER TRAFFIC CONTROLS AT ALL TIMES. 8- UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING. STRIPING, AND OTHER TRAFFIC CONTROL DEVICES TO THEIR ORIGINAL CONDITION OR IN ACCORDANCE WITH THE PLANS. 9- ALL CONFLICTING SIGNS SHALL BE EITHER REMOVED, RELOCATED OR COVERED BY THE CONTRACTOR. RELOCATABLE SIGNS SHALL BE INSTALLED AS SPECIFIED ON THE PLANS OR AS DETERMINED IN THE FIELD BY THE ENGINEER. 10- ALL EXISTINGSTRIPING AND PAVEMENT MARKINGS NOT SHOWN ON THE PLANS, IF REMOVED DURING CONSTRUCTION, SHALL BE REPLACED IN CONFORMANCE WITH THE STRIPING PLAN OR AS DETERMINED BY THE ENGINEER. 11- TAPER LENGTH , NUMBER AND SPACING OF CONES SHALL CONFORM TO CALTRANS STANDARD PLANS T12 TABLE (1) ,OR AS DETERMINED IN THE FIELD BY THE ENGINEER. PHASE(4)