Loading...
HomeMy WebLinkAbout4644-1CONSTRUCTION & UNDERGROUND UTILITY LEGEND ASPHALT CONCRETE ASPHALT CONCRETE FEATHER PORTLAND CEMENT CONCRETE SAWCUT UNE - COUNTY/CITY LIMIT LINE COUNTY OF SM DttiNARDIO C3 APPROVED BY: K2�n C� .1M�.QS 24 03 DIRECTOR OF PUBLIC WORKS R.C.E. 23115 DATE e a 0 0 W 0 M o UO. The fact that any Utility Facility is shown or not shown upon the plans shall not relieve the Contractor of the responsibility under Section 8-1.10 "Utility and Non— Highway Facilities," of the State Standard Specifications. It shall be the Contractor's responsibility, pursuant thereto, to ascertain the location of any Utility Facility Cn s which may be subject to damage by reason of the Contractor's operations. N 1. All Stationing Notes on plan refer to the C.L. Imp. of Maple Avenue. 2. Dimensions are subject to tolerances specified in the State Standard Specifications. 3. All Pavement Width Dimensions shown on the plans are to the Edge of Pavement or to the Top of Curb, unless otherwise noted. 4. Transitions and Warping shall be as shown and as determined by the Engineer. Q 5. Asphalt Concrete Overlays shall be feathered to meet existing as shown on the plans or as determined by the Engineer. 6. All Trees & Vegetation outside the limits of excavation and embankment slope lines, shall be protected in place. W Q o a r m BENCH MARK: Q Z FD BRASS CAP IN TOP OF NE CURB RETURN 1 FT NORTH OF CATCH BASIN O FOOTHILL BLVD & LOCUST AVE PER C.S.F.B. 4016/1818 SPSN 00504 EL=1307.15 N BASIS OF BEARING: OD CD CENTERLINE OF MAPLE AVE BETWEEN MILLER AVE AND BASELINE PER 0 MB 213/49-50 BEING NO'10'13"W. � Z o � U) � n Y I CONSTRUCTION & UNDERGROUND UTILITY LEGEND ASPHALT CONCRETE ASPHALT CONCRETE FEATHER PORTLAND CEMENT CONCRETE SAWCUT UNE - COUNTY/CITY LIMIT LINE COUNTY OF SM DttiNARDIO C3 APPROVED BY: K2�n C� .1M�.QS 24 03 DIRECTOR OF PUBLIC WORKS R.C.E. 23115 DATE e a 0 0 W 0 M o