Loading...
HomeMy WebLinkAbout4564-1-NOTES: ... GENERAL 7 77 77 7 t.... ... . ....... . I. ... ....... I. ... ....... ......... ..... ....... ... - .......... ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS AND THE .... . . .... ...... OF SAN BERNARDINO. .. .. ... .... ..... .. . . ..... ....... .. . I... . .... .. 2. A PERMIT PRO14 THE SAN BERNARDINO COUNTY TRANSPORTATION DEPARTMENT .... .... ... I..... .. ... .... ...... .... ......... 3. ALL PIPELINES OR SUB -S W I VALVES, HYDRANTS, ETC.) SHOWN II... .... .... wl . ...... . .. . ... ...... ... ..... ..... . ... ... .... . ........ ..... .......... .... ....... ELE AREAS.WHERE IMPROVEMENT WORK IS TO BE DONE�SHALL.BE'RVMOV . . . . . . . . . . ED OR RE- . ..... . ......... .. .... t-IRED AT NO COST TO THE SAN BERNARDINO COUNTY TRANS- ILOCATED AS REQU ..... .. .... . ,PORTATION DEPARTMENT,, IT SHALL BE THE OWNER'S RESPONSIBILITY TO I.......... ...... .. . .... .... ...... it.... ...... tII E E I.. ... ..... .......... ............ . ..... ... 4,. I E SOIL WHICH'CONSISTS OF A tROCKY 14A ALL . ......... DE SHALL'BE'PREPARED 13Y REMOVING ... . ......... ROC" WHICH, PROTRUDE -A!3OVE:THE,SUB'GRADE.AND ALL VOIDS OR DEPRESSIONS ......... . SHALL BE FILLED WITH A P DED MATERIAL OF A OUAT4ITY BETTER THAN -- ------- . ..... ... ... THr NATIVE', MATERIAL. .......... IF�APHALT.CONCRETE IS TO BE PLACED DIRECTLY ..... ..... . ... ...... ..... ---- ON THE SUB GR EGISTERED BY THE E.P.A. FOR USE I,ADE, A SOIL,STERILANT R ........ .. ............ .. c. AND P.c c. .. ........ SHALL BE UNIFORMLY APPLIED AT THE MANUFACTURER'S .... .... .. ...... .... . ...... lMME RIOR TOTAVING. . .. .... .. ..... ......... ... ... ...... .......... . ..... .. ..... .......... 5, ADEQUATE STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR .. ....... . . ...... .............. ..... ..... . .. ... ..... TO CONSTRUCT THE WORK TO THE PLAN GRADES. ... ... ..... . ...... .. ...... ..... ... .... - - ----- - - -------- E E L . . ... ...... . ... .. ..... . ...... I. ....... .... ........ ......... .......... .. ........ ---------- . ... ......... . OT PRIOR TO PAVING. ... ...... ------- ...... ...... ACKFILL, COM- ..... . ...... .. ...... .. ...... BE PERFORMED AT I RADFS SHALL . ....... ..... .... .. .. ....... ST TO SAN BERNARDINO COUNTY. A WRITTEN REPORT WITH THESE ­­ NO CO, . . ..... Com .. ......... ... ........ ... .......... ... ... ...... . . ......... ..... . . ..... I.... ...... ...... STRATION DIVISION 'OF THE C RIOR 'PACTION�TESTS SHALL BE SU13MITTED TO THE CONTRACTS ADMIT -TI' tI.... ........ ... ---- - ------ ............... ....... . ...... BY THE ENGINEER TO THE ..... .. ....... .... ...... ..... ...... . E . ..... ..... ...... . ... 8. AT THE COMPLETION OF ROUGH GRADING, A MATERIALS REPORT,ANDTHE PRO- 7 PO URAL SECTI I ........ . . . t. .............. ALL TRUCTURAL REQUIREMENTS HAVE BEEN MET. R RE G W ............... ...... .... . .. ....... ..... --- --- ..... . ... ..... . ...... ...... .. ........ .. ........ ..... . .......... ...... ... .... ... ..... . ...... .......... ....... . ...... . ........ . ... .......... ..... - ----- .. ....... ­ .......... ... ..... ------ . ...... . . . . . . . ... . ......... .......... ..... ..... ...... .... ......... .. .... ......... .......... . ..... ....... . ..... ------- REPORT SLL A MATERIAL 9. AT THIE-CO14PLETION OF PAVING, .... ...... TO THE CONTRACTSEN .. . .. ..... ... GINEER AT THE SAN BERNARDINO COUNTY TRANSPORTATION . . ..... ... . ... ... ... ....... ....... .... .... .. .... .... M -LISTING ALL TESTS OF DETEM41NATIONS COMPLETED TO VERIFY: . .. .... DEPART ENT 7t -'7'-::: ...... LYSIS AND c ... ........ ..... .. . .... . ...... ...... . .. .... . .. .... ..... A) R -VALVE, SIEVE A �l �AND.EQUIVALENT OF AGGREGATE, BASE ... . ...... I T AND S IF, . ........... ...... L VP �,NAIYSIS-OF.ASPHALT'SURFACING. . ........ .... ...... 'ROAD DEPARTMENT APPROVAL OES'NOT N tS. 10 I C'LUDE,'PSTIMAT .......... ............ ....... ..... I11. AN ENCROACHMENT,PERMIT MUST BE'OBTAINED FROMVHE COUNTYTRANS- . ..... ........ .......... ... ....... ........... ............ ...... ........ . PORTATION DEPARTMENTPRIOR TO MAKING E F A APPLICATION'AND ISSUANC .0. . ...... I.... ...... .......... --- - -------- - II.. ........ . EM ILDING PERMIT. - ----- - -- ---- I. ......... . ....... . ....... ....... ...... ...... . ..... ........ .......... .......... V 2. MMEDIATELY,FOLLOWINO kEkbVAt OF':tj4STIN(G;PAVEMENT OR DIKE �OR'CURB ....... ..... I.......... - ----- THE CONTRACTOR.SHALLIDILIGENTLY PURSUE THIS 'PORTIaN AND/OR, GUTTER, ........ ..... . ........ ---- - - ------- ------- ........... OF�WdRK-UNTIL COMPLETION,- .... ......... ......... .... .... ...... .... I ..... .... ...... .... . ........... . ...... . .... .. .. ....... . ........ �".COUNTY' x 'RO WH REQUIRE''RECOt4StRU(it'ibg'�-SliAi;t'�', . .......... -FOR T ,�:WITH ADEQUATE DETOURS, DURING �MAIN OPEN . ... ........ . ..... ..... ....... ACTUAL, CONSTRUCTION. . .... . ..... .. .. . ..... ............... DRELS SHALL BE SO ON-',: . ..... CURB' AND GUTTER -CROSS GUTTER AND -SPAN .................. ---------- . ..... . ..... STRUCTM lHAT A MI . .. .... . ..... G OCCURS;',SECTIONS,HAVING .......... .. .......... .. ...... ..... . NTSOF 0. SLL BE,WATER TESTED IN THE PRE- .. . ...... .. ........... .. . HE INSPECT ------ OR IMMEDIATELY PRIOR TO TRACT ACCEPTANCE. 1-4 , I [_1__._,l:�_-1 , I .­­ ­.'�7. .......... . ......... . ... ....... . .SECTION S W ICH.HAVZe,WATER PONDING,MORE THAN 6" WIDE,OlZ MORE �THAN ....... ... . . ...... ..... .. . . :40,:LONG:,SHALL�"BE AWCUT AND REMOVED IN LENGTHS NOT LESS�rHAN 41 :�AND�REPLACEDTO REDU .... . ........ CE_?`ONDING,T0lTHE,lMAXIMUM SPECIFIEDt.: ....... ICONSTRUCTION NOTES: V ta,o NSTRUCT A C . PAVEMENT PER SOILS REPORT. "O 8" CURB AND GUTTER PER S.B. COUNTY STD. NO. 115. 'cl-ONSTRUCT CON tSTRUCT SIDEWALK TYPE "C" PER'S.B. COUNTY STD. NO. 109. CONSTRUCT CROSS -GUTTER AND SPANDREL PER'S.B. COUNTY STD. NO. 119. 0 D CONSTRUCT SIDEWALK RAMP PER S.B. COUNTY STD. NO. 110A. CONSTRUCT 301 WIDE COM11ERCIAL DRIVEWAY PER S.B. COUNTY STD. NO. 129. ... ..... .... ...... .... ... ...... .... ... .. .. . ........ -------- ... ... . ........ ........... . ......... #10 7 SAW CUT TO NEAT CLEAN EDGE AND REMOVt EXISTING A.C. PAVEMENT. F D D)\ CONSTRU,CT,MIN. 2' A.C. FEATHER TO ORK A� S MOOTH 'SURFACE A.0. 0 0. 0'ro tov gz$7,6 7, I117elCOIeS eX15,11;7g eo�e L L / &47' e4 90 IIIII I Y4 Al 77.5. Lff, � m OC ItICIO, 00 ral-749N��fl=?_ 4411,1&NI � m