Loading...
HomeMy WebLinkAbout4487-1AT THE COMPLETION OF PAVING A' MATER I ALS REPfT SHALL BE SUBMITTED "TO THE CONTRACTS ENGINEER OF THE SAN BERHARDINO �O SPORTATION DEPARTMENT LISTING ALL TESTS OR DETERMINATIONS COMP TO VERIFY: (a) R -VALUE, SIEVE ANALYSIS -AND SAND EQUIVALENT OF ATE BASE. (b)STABILITY, OIL CONTENT AND SIEVE ANALYSIS OF ASP T SURFACING. AI`N��CHMENT PERMIT MUST E' I RST BE OBTAINED FROM THE COUNTY y` TRANSPOi`iTATION DEPARTMENT PRIOR TO MAKING APPLICATION AND ISSUANCE` OF A GRADING PJWIT OR BUILDING PERMIT. A PERMIT MUST FIRST BE OBTAINED FROM THE COUNTY TRANSPORTATION D6pAR'i'mma PR 1 AR Tn ANY CANSTRnrTi nm AN TH i fi . ppn- Y _T I