HomeMy WebLinkAbout3377-1IuIIM�4 � � �IiillU�ll`I
■ i�
Mao
`'
'AIII al
o 0
v._:Upland
Mounta�n
aCal'ifornia91186
T
zp85-0971
-T - T-7 TIN
PROJECT ADDR SS: PATRICIA A. MARRUJO PARK
5730 AVENAL PL.
Fontana, CA 92336
PROJECT TEA STRUCTURAL ENGINEER
ZJS Engineering
LANDSCAPE ARCHITECT 350 S. Milliken Ave., Suite "A"
Sitesca es, Inc. Ono, CA 91716
Phone: (909) 974-4150 Fax: (909) 9744153
19762 Mac Arthur Blvd., #130 E-mail: zjseng@aol.com
Irvine, CA 92612
Contact: Rick Polhamus PLUMBING ENGINEER
Phone: (949) 644-9370 Fax: (949) 476-1432 Design West Engineering
242 E. Airport Dr., Suite 207
ARCHITECT San Bernardino, CA 92408
Doug Andresen, A.I.A. Phone: (909) 890-3700 Fax: (909) 890-3770
17087 orange Way ARCHITECTURE ELECTRICAL ENGINEER
Fontana, CA 92335
Contact: Hoag Andresen Redlands Engineering
Phone: (909)355-6688 Fax: (909) 349-2302 525 New Jersey Street, Suite "A"
Redlands, CA 92373
Phone: (909) 792-0611 Fax: (909) 792-6598
CIVIL ENGINEER SITE ELECTRICAL ENGINEER
Madole & Associates, Inc. Reedcorp Engineering
10601 Church Street, Suite 107 2016 Business Center Drive, Suite 110
Rancho Cucamonga, CA 91730 Irvine, CA 92612
Contact: Mark Berton Contact: Ron Reed
Phone: (909)948-1131 Fax: (909)948-8464 Phone: (949)752-1278 Fax: (949)752-1287
GENERAL NOTES:
City Required Notes:
Occupancy Note: B (Toilet Rooms) Construction Type: V -N Code Edition: 1997 UBC/2001 CBC
Permits for Restroom, Grading, Walls and other structure taller than 42" shall be provided by
City of Fontana Building & Safety.
Fire Sprinkler Note:
Fire sprinklers are required and shall be reviewed and approved by the San Bernardino County Fire Deparment.
Inspections:
1. It is the landscape Contractor's responsibility to contact the
Engineering Division's Landscape inspector
48 hours Prior to desired inspection of an item at (909)350-6649.
2. Prior to release of utilities or maintenance period commencement
following inspections are required:
- Pre construction meeting
- Inspection of irrigation system in open trench condition (prior to backfill).
- Mainline pressure test @ 150 p.s.i. for a three (3) hour period.
- Irrigation coverage tests including initial and final tests.
- Finish grade prior to planting
- Plant materials prior to planting.
- Planting, including street trees. Contact the Parks Planning and Landscape
- Development section Engineering Division, for species and final locations.
3. The Owner's representative and landscape contractor shall be present at each inspection.
Maintenance Guidelines
Landscape shall be maintained in a neat, clean, weed free and healthy condition. This shall include but not be limited to:
1. Cultivation of planted beds at intervals not to exceed ten (10) days.
2. Regular mowing to maintain lawn height not to exceed two (2) inches (will vary with species).
3. Regular pruning of plants as necessary to control and direct growth
4. Scheduled maintenance of irrigation controller to assure proper application rate of water necessary
for proper plant growth. Drip irrigation may require specialized landscape maintenance care.
5. Immediate replacement of irrigation materials as needed to maintain good working condition.
6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper plant
growth.
7. Immediate repair or replacement of irrigation materials as needed to maintain food working
condition.
8. Stakes, guys, and ties on trees shall be checked regularly for correct function. Ties are to be
adjusted to avoid abrasions or girdling of trunk or branches.
9. Upon completion of three (3) month (90 day) contract maintenance period, an inspection shall be
made by the Community Development Department Engineering division Landscape Inspection
Staff. The landscape shall be maintained in accordance with these landscape maintenance standards.
10. The Developer/Builder is responsible to contact the City and schedule the maintenance inspection.
_ I �
VICINITY MAP
w
a
SUMMIT AVE FUTURE SUMM-IT VE
Ilew
Qf
w
CURTI .> AVE.
SIERRA
LAKES
w
31
LAK NP(
c�
HIGH LA D AV
301 1 LAND E.
N.T.S.
SITE LOCATION
— _ SHEETS C1, 14, P3
& P5
SCHOOL,
SRE
• SCE
SHEETS C2, 15, P4
U'
& P6
/ n
o �qr
0 h
N.T.S.
PROJECT SUMMARY
ACRES: 5.2 (2243,747 S:F.)-
HARDSCAPE AREA: 275,590 SQ. FT.
TURF AREA: 1119534 SQ. FT.
SHRUB/GROUNDCOVER AREA 601,262 SQ. FT.
NEW W.I. FENCE @ CITRUS AVE / PARK PERIMETER. 400 LN. FT.
EXISTING BLOCK WALL @ TRACT 16096 PERIMETER 1110 LN. FT.
NEW W.I. FENCE @ SCHOOL SITE / PARK PERIMETER. 660 LN. FT.
EXISTING CHAINLINK FENCE @ SCHOOL SITE / PARK PERIMETER. 75 LN. FT.
VAUATION OF RESTROOM STRUCTURE: $ 250,000.00
VAUATION OF 28' BBQ GAZEBO STRUCTURE: $ 28,000
VAUATION OF 14' PERGOLA STRUCTURE : _ $ 20,000
cAfw-
i Ti, - -t!)- -� i irj,)
3 3
3 8 3
SHEET INDEX
T-1 TITLE SHEET
CE -1
1-48
PRECISE GRADING PLAN TITLE & DETAIL SHEET
CE -2
2-48
PRECISE GRADING PLAN
FORTH CITY SUBMITTAL 6/24/04
CE -3
3-48
PRECISE GRADING PLAN
CE -4
4-48
PRECISE GRADING PLAN DETAILS
CE -5
5-48
EROSION CONTROL PLAN
SITE
C-1
6-48
CONSTRUCTION PLAN - 20 SCALE
A
C-2
7-48
CONSTRUCTION PLAN - 20 SCALE
A
C-3
8-48
GAZEBOJOT LOT ENLARGEMENT PLAN
A
C-4
9-48
CONSTRUCTION NOTES, LEGENDS & SCHEDULES
C-5
10-48
CONSTRUCTION DETAILS
A. OL 89
�s
C-6
11-48
CONSTRUCTION DETAILS
*
C-7
12-48
CONSTRUCTION DETAILS
C-8
13-48
CONSTRUCTION DETAILS
C-9
14-48
CONSTRUCTION DETAILS
DMIN BY,
C-10
15-48
ADA DETAILS & NOTES
DATE,
2/15/03
I-1
16-48
IRRIGATION DETAILS, NOTES & LEGENDS
I-2
17-48
IRRIGATION DETAILS
I-3
18-48
IRRIGATION MAINLINE LAYOUT - 40 SCALE
�d
I-4
19-48
IRRIGATION PLAN - 20 SCALE
I-5
20-48
IRRIGATION PLAN - 20 SCALE
P-1
21-48
PLANTING DETAILS, NOTES & LEGENDS
P-2
22-48
PLANTING PLAN (TREES & GROUNDCOVER) - 20 SCALE
P-3
23-48
PLANTING PLAN (TREES & GROUNDCOVER) - 20 SCALE
P-4
24-48
PLANTING PLAN (SHRUBS & VINES) - 20 SCALE
P-5
25-48
PLANTING PLAN (SHRUBS & VINES) - 20 SCALE
P-6
26-48
SPECIFICATIONS
E-1
27-48
ELECTRICAL SITE PLAN
E-2
28-48
ELECTRICAL DETAILS
RESTROOM ARCHITECTURE
A-1
29-48
ARCHITECTURE TITLE SHEET/SITE PLAN
A-2
30-48
FIRST FLOOR PLAN
A-3
31-48
FOUNDATION & STRUCTURAL ELEVATIONS
A-4
32-48
FRAMING, CEILING & SECTION
A-5
33-48
ELEVATIONS & ROOF PLAN
A-6
34-48
INTERIOR ELEVATIONS
D-1
35-48
DETAILS
D-2
36-48
DETAILS
N-1
37-48
GENERAL NOTES
N-2
38-48
GENERAL NOTES
N-3
39-48
GENERAL NOTES
P-1
40-48
PLUMBING LEGEND, NOTES & SCHEDULES
P-2
41-48
PLUMBING FLOOR PLAN & SITE PLAN
P-3
42-48
PLUMBING FLOOR PLAN & SITE PLAN
P-4
43-48
PLUMBING DETAILS
E-1
44-48
ELECTRICAL SYMBOL LIST, SCHEDULE
& SINGLE LINE DIAGRAM
E-2
45-48
ELECTRICAL SITE PLAN
E-3
46-48
ELECTRICAL PLAN
E-4
47-48
ELECTRICAL SPECIFICATIONS
S-1
48-48
FIRE SPRINKLERS PLAN
SITESCAPES, INC. HEREBY CERTIFIES THAT THE DESIGN, DETAILS AND
SPECIFICATIONS AS REPRESENTED HEREIN MEET PROFESSIONAL LANDSCAPE
ARCHITECTURAL STANDARDS. SITESCAPES, INC. CANNOT GUARANTY THE
QUALITY OF CONSTRUCTION, INSTALLATION OR MAINTENANCE OF
IMPROVEMENTS
AS DESIGNED AND/OR SPECIFIED HEREIN AND DISCLAIMS
ANY FUTURE LIABILITY RESULTING IN PERSONAL INJURY AND/OR
PROPERTY DAMAGE RESULTING FROM DEVIATIONS. SITESCAPES, INC.
IS NOT RESPONSIBLE FOR THE AMOUNT OR FREQUENCY OF IRRIGATION
WATER APPLIED TO THE PROJECT DURING CONSTRUCTION OR THEREAFTER.
SUBMITTALS
FIRST CITY SUBMITTAL 6/24/03
SECOND CITY SUBMITTAL 10/ 15/03
THIRD CITY SUBMITTAL 3/15/04
FORTH CITY SUBMITTAL 6/24/04
FIFTH CITY SUBMITTAL 07/26/04
APPROVALS
REVISIONS
A
A
A
A
A
A
A
A
o
A
JOB 140.
ti0DSCApe
P
A. OL 89
�s
00-018
D�
22
18�
*
p
DAT E
SIGNATURE
Q-
�%`
Dite19-
c �F
2/15/03
CA���`
CITY OF
FONTANA
-LANDSCAPE PLANS
DMIN BY,
PATRICIA A. MARt�1� a. PARK
TITLE/SHE'T'/
AS SHOWN
DESIGNED BYs
DATE,
2/15/03
CHECKED BY,
APPROVED BYE`a
DA �
DWG. ND/
3377.:-
CITY ENGINEER V= 79
�d