HomeMy WebLinkAbout3361-2GENERAL NOTES:
1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE STANDARD
SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREENBOOK"). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION
UNLESS OTHERWISE NOTED.
2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE
PROVISIONS IN THE "GREENBOOK", THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION.
3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.
4. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO
THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN
PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610.
5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA
MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER.
6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES.
7. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM THE
CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY.
8. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE GROUND OR
OTHER APPROVED MEANS PURSUANT OT THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS
THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT.
9. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE.
10. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO
AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFORE
EXCAVATION.
11. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC,
CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS.
ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES.
12. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR
SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION -AND WATER REQUIREMENTS.
13. CURVE DATA REFERS TO THE FACE OF CURB.
14. STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE NOTED.
15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN
GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING
CONSTRUCTION.
16. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT PRIOR NOTIFICATION TO THE CITY
ENGINEER.
17. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCH MARKS, SHALL BE DONE
BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION
SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE
ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT.
18. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE
MAINTAINED AT ALL ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES.
19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE -MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES.
20. ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES EXCEED 25 MILES PER HOUR.
21. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY
ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL.
22. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR.
23. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE -WORKING
OF THAT PORTION OF THE WORK UN11L THE SPECIFIED DENSITY IS OBTAINED.
24. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE,
THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS.
25. THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE APPROVED AT THE 11ME OF CONSTRUCTION BY CITY AND SHALL CONFORM TO
THE CITY OF FONTANA STANDARD DETAILS.
26. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING CONCRETE.
27. THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE SEWER LATERAL.
28. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED.
29. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS.
30. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT.
31. PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND APPROVAL OF THE CITY ENGINEER AS DETERMINED BY SOILS
TESTS TAKEN AFTER COMPLETION OF ROUGH GRADING.
32. ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE MATERIAL FOR STRUCTURAL STREET SECTIONS SHALL BE RECOMMENDED BY A
GEOTECHNICAL REPORT AND SUBMITTED TO THE CITY OF FONTANA FOR APPROVAL UPON COMPLE11ON OF ROUGH GRADING.
33. ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON
COMPLETION OF PAVING.
34. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO
THE SATISFACTION OF THE CITY TRAFFIC ENGINEER.
35. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED BY THE CONSTRUCTION TO THE
SATISFACTION OF THE CITY ENGINEER.
36. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY
ENGINEER.
PROJECT SPECIFIC NOTES:
1. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH FONTANA WATER COMPANY FOR THE ADJUSTMENT OF ALL WATER METERS, VALVE COVERS,
AND FIRE HYDRANTS.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH SOUTHERN CALIFORNIA EDISON FOR THE ADJUSTMENT OF EDISON VAULTS.
3. FOR ALL REMOVE AND REPLACE ITEMS, CONTRACTOR SHALL REUSE THE EXISTING ITEM WHENEVER POSSIBLE, IF THE EXISTING ITEM IS NOT USABLE, THE
ITEM SHALL BE REPLACED IN-KIND.
4. A GRADED SWALE SHALL BE CONSTRUCTED NEAR THE PLACEMENT OF ALL CURB DRAINS TO ALLOW FOR PROPER DRAINAGE OF EACH PROPERTY.
5. ON-SITE GRADING WILL BE REQUIRED FOR EACH AFFECTED PROPERTY, CONSTRACTOR SHALL BE RESPONSIBLE TO REPLACE ALL LANDSCAPING AND
IRRIGATION THAT IS AFFECTED BY CONSTRUCTION.
6. ALL TREES SHALL BE PROTECTED IN PLACE WHENEVER POSSIBLE, HOWEVER IF STREET IMPROVEMENTS REQUIRE THE REMOVAL OF A TREE, REMOVAL PRICE
SHALL BE DETERMINED BY DIAMETER MEASURED TWO (2') FEET FROM THE GROUND SURFACE.
Underground Service Alert
SECTION 4216/4217 OF THE GOVERNMENT
�UORI: ro CODE REQUIRES A DIG ALERT IDENTIFICATION
Q G NUMBER BE ISSUED BEFORE A PERMIT TO
�i EXCAVATE WILL BE VALID
„ FOR YOUR DIG ALERT I.D. NUMBER CALL
UNDERGROUND SERVICE ALERT
TOLL FREE 1-800-227-2600
TWO WORKING DAYS BEFORE YOU DIG
GLItNI: Ull Ut tUNIHNA
TKE JOB #: 101-05
JA I (ZEooftD D(Zh%4,m6
REV. I REVISION DESCRIPTION
�2-as AS
DATE IENGR.
DATE
r� v SA
No.44226
Exp.6-30-05
Civi
OF raL�F
R
5' 5'-7'
I
TYPICAL SECTION:
MILLER AVENUE
MAN100 AVE TO Ker.- 3TER AYE
SCALE:
HORIZ. i"=10'
VERT. 1"=2'
EX. EX.
R/W R/W
30' 36'
5' 25' 18'
7' -�-
S�3'
0
S=20
2 •• _
7
6
D1--
TYPICAL SECTION
MANGO AVENUE
BASELJNE AVE TO V.CAU3=r- CT.
SCALE:
HORIZ. 1"=10'
VERT. 1"=2'
R%W R. EX.
44' 44'
30' 30' 5' -�- 99-------
-a-2*
'
I 12' I
I i~ 10'
IS=2.0% S,
S-2.3%3.4�
,1g
_' �Ll�
- 2 c9.
7
TKE ENGINEERING, INC.
4446 CENTRAL AVENUE
RIVERSIDE, CA 92506
(909) 680-0440
SING FAX (909) 680-0490
2I«la3
MICHAEL PATRICK THORNTON R.C.E. No. 44226
EXPIRES: 6-30-05
TYPICAL SECTION:
WALNUT VILLAGE PARKWAY
k?ANCIO AVE. TO ACACIA ANE
SCALE:
HORIZ. 1"=10'
VERT. 1"=2'
A c
R/W R/W
32 30 20' 20' 5, 5'
11 I
I5-20% S= -5.47w-5.1%
._ S=1.6%3:5%
2
TYPICAL SECTION
MANGO AVENUE
LELM AVE TO WX-CAn. CT.
SCALE:
HORIZ. 1"=10'
VERT. 1"=2'
R/W R/W R/W
36'
30'-36' 36'
�-5' --tT 5 26'-
S=2
6' S=2 090
2
TYPICAL SECTION
MANGO AVENUE
Fes+! ST TO VI►Ai..(W Vll-4C- PKVW
SCALE:
HORIZ. 1"=10'
VERT. 1"=2'
CONSTRUCTION NOTES:
O CONSTRUCT 8" CURB AND GUTTER PER CITY OF FONTANA STANDARD DETAIL NO. 1003.
@CONSTRUCT 5' SIDEWALK PER CITY OF FONTANA STANDARD DETAIL NO. 1001.
O CONSTRUCT 0.45' (B -AR -4000) ASPHALT CONCRETE OVER COMPACTED NATIVE SOIL (95%
12" MINIMUM).
O SAWCUT EXISTING ASPHALT CONCRETE PAVEMENT.
SHOULD CONSTRUCTION OF THE CITY OF FONTANA, CALIFORNIA
REQUIRED
COMMENCE WITHIN RTWOMENTS YEARSNOT OF THE STREET IMPROVEMENT PLANS
DATE OF APPROVAL SHOWN HEREON DRAWN BY: MILLER AVENUE MANGO AVENUE SCALE.
AND CARRIED FORTH IN A DILIGENT TDA AS SHOWN
MANNER, THE CITY ENGINEER MAY DESIGNED BY: MILLER AVE. TO WALNUT VILLAGE PKWY. DATE
REQUIRE REVISIONS TO THE PLANS TO Z'MR GE RA NO ICAL SECTIONS FEB. 2003
BRING THEM INTO CONFORMANCE WITH CHECKED BY: VED BY: 2' DA DRAWING NO.: 2
CONDITIONS AND STANDARDS IN EFFECT. MPT 3301
CITY ENGINEER R.C.E. o. 5 15 11