HomeMy WebLinkAbout3357-3GENERAL CONDITIONS
A. CONTRACT DOCUMENTS: Shall consist of specifications
and its general conditions and the drawings (also include
pertinent sections of the City of Fontana "Specification
Manual for Streetscapes and Parks"). The intent
of these documents is to include all labor, materials,
and services necessary for the proper execution on the
work. The documents are to be considered as one.
Whatever is called for by any parts shall be as binding
as if called for all parts.
B. VERIFICATION: The Contractor shall verify measurements
on the drawings before beginning work. In case of error
or discrepancy in the drawings or specifications or in
the work of others affecting his work, he shall notify
the Owner's Representative immediately. The Contractor
shall be held responsible for any damages or loss due to
his failure to observe these instructions.
C. MATERIALS, MACHINERY, EMPLOYEES: Except as otherwise
noted, the Contractor shall provide and pay for all
materials, labor, tools, and other items necessary and
incidental to the completion of his work.
D. SURVEYS, PERMITS, REGULATIONS: The Owner shall furnish
an adequate survey of the property. The Contractor
shall obtain and pay for all permits and comply with all
laws and ordinances bearing on the operation or conduct
of the work as drawn and specified. If the Contractor
observes that a variance exists therewith he shall
promptly notify the Owner's Representative in writing
and any necessary changes shall be adjusted as provided
in the contract for changes in the work.
E. PROTECTION OF WORK, PROPERTY AND PERSON: The
Contractor shall adequately protect the work, adjacent
property, and the public, and shall be responsible for
any damages or injury due to his act.
F. CHANGES IN THE WORK: The Owner may order changes in
the work, and the contract sum being adjusted accordingly.
All such orders and adjustments plus claims by the
Contractor for extras must' be made in writing before
executing the work involved.
G. CORRECTION OF WORK: The Contractor shall re—execute
any work that falls to conform to the requirements of
the contract and shall remedy defects due to faulty
materials or workmanship upon written notice from the
Owner's Representative for a period of ninety (90) days
from the date of completion of the contract.
H. CLARIFICATION OF DRAWINGS BEFORE BIDDING: After
reviewing the drawings thoroughly it is the Contractor's
responsibility to_ clarify with the Owner's Representative
any questions the Contractor may have regarding the
method of construction, quantities, or quality of materials
included or called out. If the Contractor cannot contact the
Owner's Representative, the Contractor must qualify his bid
or accept the interpretation of the Owner's Representative
on the questionable areas as they develop during construction.
I. SAMPLES: The Owner's Representative reserves the right to
take and analyze samples of materials for conformity to
specifications at any time. The Contractor shall furnish
samples upon request by the Owner's Representative. Rejected
materials shall be immediately removed from the site and
replaced at the Contractor's expense. The cost of testing
materials not meeting specifications shall be paid by the
Contractor.
i
J. PRE—CONSTRUCTION CONFERENCE: Schedule a pre—construction
meeting with the Owner's Representative at least seven (7)
days before beginning work. The purpose of this conference
is to review any questions the Contractor may have regarding,
the work, administrative procedures during construction and
project work schedule.
OBSTRUCTIONS BELOW GROUND:
A. CONTRACTOR'S RESPONSIBILITY: the Contractor is responsible
for verifying the location of all utility lines and other
underground obstructions so that proper precautions may be
taken not to disturb or damage such improvements. In the
CLEAN—UP:
A. GENERAL: After all installation operations have been completed,
all trash, excess soil, empty plant containers and rubbish
shall be removed from the property. All scars, ruts or other
marks in the area caused by this work shall be repaired and
the ground left in a neat and orderly condition throughout
the site. Contractor shall pick up all trash resulting from this
work no less than each Friday before leaving the site, once a
week and/or the last working day each week. All trash shall
be removed completely from the site.
B. NEATNESS: Leave the sidewalks and street in a neat and
clean condition at the end of each working day.
PROTECTION:
A. GENERAL: At all times during construction, adequate protection
shall be provided for all areas against damage of any kind,
until final acceptance by the Owner's Representative.
B. RESPONSIBILITY: the Contractor shall be held responsible for
the care and preservation of all existing buildings and
structures on the property and adjacent premises. Any part
of them injured, damaged of disturbed because of his work
shall be repaired, replaced or cleaned by the Contractor at
for any reason fail to meet the requirements of this guarantee.
Replacement shall be made with plant material as indicated or
specified from the original planting and all such replacement
materials shall be guaranteed as specified for the original
guaranteed material.
event of a conflict between such lines and plant locations,
the Contractor shall promptly notify the Owner's Representative,
who shall arrange for the relocation of one or the other.
Failing to follow this procedure, the Contractor shall at his
own expense make any and all repairs for 'damages resulting
from his work.
�O1,0DSCA
��Q pRp A. P 0(y� 9,y0
2782 y r y-5,
J, ale 03 �Q
DATE]
out
F Of- CA��F
S 1 T E i C A P E i
Landscape Architecture
and Planning
19762 Mac Arthur Blvd., Ste. 130
Irvine, CA 92612
Richard Polhamus, License CA -}2782
(949) 644-9370 (949) 476-1432 FAX
NO. REVISION
A 4/16%03
�
�
Z
O
z
z
o
W
ami
o0
0
z
3
F—i
►-�
M
Q
LT
o
�
O
¢
o
�-
Oz
�?
W
Q
t
+
U.
O
N
l
CCC
L
CL
�.T�
Z
o
w
x
<
0.
U
W
Z
Q
w
�
N
Z
z
z
o
W
ami
o0
0
z
3
a
W
o
r
v�
o
oc
W
Q
U
G\
-71cl�
PERMIT NO.
08 -02 -N -MC -0232
DATE 12-/04/02
JO`* 02-043
L3
of 3
N
Z
z
z
o
W
1-
�..I
Z
U
0
z
3
a
W
o
�
v�
PERMIT NO.
08 -02 -N -MC -0232
DATE 12-/04/02
JO`* 02-043
L3
of 3