Loading...
HomeMy WebLinkAbout3357-1rr 3 7RAh 11Z,3D My uce'U II ,MMI A Sierra Lakes Land L®M � I -r F_ c P E Ave.1156 Nm Mountain 91785- Landscape 19762 Mac Arthur Blvd. (949) 644-9370 ' Architecture Suite 130 FAX 476-1432 Irvine, CA 92612 (909) 985-0971 &Planning Richard Polhamus, License 2782 for- GENERALNOTES: City Required Notes Inspections: 1. It is the landscape Contractor's responsibility to contact the Engineering Division's Landscape inspector 48 hours Prior to desired inspection of an item at (909)350-6633. 2. Prior to release of utilities or, maintenance period commencement following inspections are required: a. Pre -construction meeting b. Inspection of irrigation system in open trench condition (prior to backfill). c. Mainline pressure test @ 150 p.s.i. for a three (3) hour period. d. Irrigation coverage tests including initial and final tests. e. Finish grade prior to planting. f. Plant materials prior to planting. g. Planting, including street trees. Contact the Parks Planning and Landscape Development section Engineering Division, for species and final locations. Compliance with approved plans h. Final Inspection. 3. The Owner's representative and landscape contractor shall be present at each inspection. Maintenance Guidelines Landscape shall be maintained in a neat, clean, weed free and healthy condition. This shall include but not be limited to: 1. Cultivation of planted beds at intervals not to exceed ten (10) days. 2. Regular mowing to maintain lawn height not to exceed two (2) inches (will vary with species). 3. Regular pruning of plants as necessary to control and direct growth 4. Scheduled maintenance of irrigation controller to assure proper application rate of water necessary for proper plant growth. Drip irrigation may require specialized landscape maintenance care. 5. Immediate replacement of irrigation materials as needed to maintain good working condition. 6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper plant growth. 7. Immediate repair or replacement of irrigation materials as needed to maintain good working condition. 8. Stakes, guys, and ties on trees shall be checked regularly for correct function. Ties are to be adjusted to avoid abrasions or girdling of trunk or branches. 9. Upon completion of three (3) month (90 day) contract maintenance period, an inspection shall be made by the Community Development Department Engineering division Landscape Inspection Staff. The landscape shall be maintained in accordance with these landscape maintenance standards. 10. The Developer/Builder is responsible to contact the City and schedule the maintenance inspection. CALTRANS All work within State right of way shall be completed in accordance with the current State of California Department of Transportation Specifications. Should a conflict arise between the contract plans, specifications and/or detailsprepared by the permittee, the State's Standard Specifications shall govern as determined by the State's representative. VICINITY MAP V.--,RIVERSIDE AVENUE SITE LOCATION SHEET INDEX L-1 TITLE SHEET L-2 CONSTRUCTION PLAN L-3 SPECIFICATIONS SITESCAPES, INC. HEREBY CERTIFIES THAT THE DESIGN, DETAILS AND SPECIFICATIONS AS REPRESENTED HEREIN MEET PROFESSIONAL LANDSCAPE ARCHITECTURAL STANDARDS. SITESCAPES, INC. CANNOT GUARANTY THE QUALITY OF CONSTRUCTION, INSTALLATION OR MAINTENANCE OF IMPROVEMENTS AS DESIGNED AND/OR SPECIFIED HEREIN AND DISCLAIMS ANY FUTURE LIABILITY RESULTING IN PERSONAL INJURY AND/OR PROPERTY DAMAGE RESULTING FROM DEVIATIONS. SITESCAPES, INC. IS NOT RESPONSIBLE FOR THE AMOUNT OR FREQUENCY OF IRRIGATION WATER APPLIED TO THE PROJECT DURING CONSTRUCTION OR THEREAFTER. SUBMITTALS 12/4/02 1 st SUBMITTAL 04/16/03 2nd SUBMITTAL C9 W REVISIONS 0 0 � O 0 0 0 0 A 0 0 0 0 W: JOB NO. 02-043 DATE 12/4/02 Z z W W > a CITY Q OF CITY FONTANA DUNCAN CYN. RD. OF RIALTO V) Z W U Q V) O 0 SUMMIT AVENUE PROJECT CURTIS SITE wAVE � U U HIGHLAND AVENUE W J J •rALNUT AVE. SITE LOCATION SHEET INDEX L-1 TITLE SHEET L-2 CONSTRUCTION PLAN L-3 SPECIFICATIONS SITESCAPES, INC. HEREBY CERTIFIES THAT THE DESIGN, DETAILS AND SPECIFICATIONS AS REPRESENTED HEREIN MEET PROFESSIONAL LANDSCAPE ARCHITECTURAL STANDARDS. SITESCAPES, INC. CANNOT GUARANTY THE QUALITY OF CONSTRUCTION, INSTALLATION OR MAINTENANCE OF IMPROVEMENTS AS DESIGNED AND/OR SPECIFIED HEREIN AND DISCLAIMS ANY FUTURE LIABILITY RESULTING IN PERSONAL INJURY AND/OR PROPERTY DAMAGE RESULTING FROM DEVIATIONS. SITESCAPES, INC. IS NOT RESPONSIBLE FOR THE AMOUNT OR FREQUENCY OF IRRIGATION WATER APPLIED TO THE PROJECT DURING CONSTRUCTION OR THEREAFTER. SUBMITTALS 12/4/02 1 st SUBMITTAL 04/16/03 2nd SUBMITTAL APPROVALS REVISIONS 0 0 � O 0 0 0 0 A 0 0 0 0 SDs 0(84 9,p� 27s2 ��s-� * * JOB NO. 02-043 DATE 12/4/02 SIGNATURE -Z-1 DATE OF Cp,�\F PERMIT NO. 08-02—N—MC-0232 DATE 12/04/02 JOB * 02-043 Ll of 3