Loading...
HomeMy WebLinkAbout3230-1—ir//1i r:■�rr CH \ ITECTURAL r _ r777 -77 ._.. _ 77;) (7� /{ ry y77777-1 : f t '�q I { } i i 33 i 'LIF i�"�ONTANA, C AP* j ..,�'"�l� : r SCALE: N.T.S. INSPECTIONS: MAINTENANCE GUIDELINES: 1 It is the Landscape Contractor's responsibility to contact the Engineering Division's Landscape shall be maintained in a neat, clean, weed -free and healthy condition. This shall prior to desired inspection of an item at 909 350-6649. include but not be limited to Landscape Inspector 48 hours p p ( ) 2 Prior to release of utilities or maintenance period commencement, the following 1. Cultivation of planted beds at intervals not to exceed ten (10) days. inspections are required: 2. Regular mowing to maintain lawn height not to exceed two (2) inches (will vary with species). Pre -Construction Meeting = 3. Regular pruning of plants as necessary to control and direct growth. Inspection of irrigation system in open trench condition (prior to backfill). Mainline 4. Scheduled maintenance of irrigation controller to assure proper application rate of pressure test @ 150 P.S.I. for a three (3) hour continuous period. water necessary for proper plant growth. Drip irrigation may require specialized landscape maintenance care. Irrigation coverage tests including initial and final tests.. 5. Immediate replacement of irrigation materials as needed to maintain good working conditions. Finish grade prior to planting. 6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper Plant materials prior to planting and soil preparation. � plant growth. including street trees, Contact the Parks Planning & Landscape Development 7• Immediate repair or replacement of irrigation materials as needed to maintain good Planting, n g g p p 9 Section, Engineering Division, for species and final locations. working conditions. 77777�, r _71 ..3 .w. .a 4 L7 F 0 P E A L a' ea"e"11 0 i,, M- S A. B. Anchor Bolt Int. Integral T-1 TITLE SHEET MASTER A.C. Asphaltic Concrete J. Box Junction BoxWM-1 WATPLAN Adj. Adjacent Jts. Joints Alt. Alternate L.A. Landscape Architect 32 Arch. Architect Lic. Licensed C..1CONSTRUCTION PLAN Auto, Automatic L,P. Low Point Bldg. Building Max. Maximum Blk, Black M. B. Machine Bolt C-2 CONSTRUCTION PLAN B. M. Bench Mark Mech. Mechanical B. S. Bottom of Steps Med. Medium C. B. Catch Basin Min. Minimum C-3 CONSTRUCTIO PLAN C. F. Cubic Foot M. H. Manhole C.1Cast Iron Multi. Multi -branched CONSTRUCTION PLAN C.1. P. Cast Iron Pipe Nat, Natural C-4 3 C.J. Cold Joint N.I.C. Not in Contract CCenter Line 0. C. On Center CONSTRUCTION UETAILS Clr, Clearance O.D. Outside Diameter ®■• � C.0. Clean Out P.A. Planting Area C.M.P. Corrugated Metal Pipe Perf. Perforated I 1 IRRIGATION LComp. Compacted P.O.C. Point of Connection -� Con: Concrete P.S.I. Pounds Per Square Gond. Condition P.T. Pressure Treated 1-2 IITI PLAN Cont. Continuous P.V,C. Poly Vinyl Chloride _2 7 Ct. Center R. Radius Ctr, Sink Counter Sink R.C, P. Reinforced Concrete 1-3 IRRIGATION -.- D.D. Deck Drain -- - _-_ Rebar Reinforcing Bar D, F. Douglas Fir Rein. Reinforcing PLAN D.G. Decomposed Granite Req'd, Required 1-4 I Dia. Diameter Ret, Retardant Dim. Dimension Rgh. Rough Dtl, Detail R.S. Rough Sawn U••2 IRRIGATION � Ea. Each R.S.R, Rough Sawn Redwood _ E. J. Expansion Joint Rwd. Redwood L NTING 1 � PLElec. Electric Sch. Schedule P-1 Elev. Elevation S. F. Square Foot Eng. Engineer Sht. Sheet P-2 P PLAN Esp: Espalier Sht. Md. Sheet Metal Eq. Equal Sim. Similar E.W. Each Way SSco PLANTING PL I E.W.W.M: Electric Welded Wire Mash Smth. Smoothoth P-3 Ex, Existing Specs. Specifications Lf� Exp. Exposed Sq. Square F. F. Finish Floor Elevation Stl, Steel P-4 P L T I I� 1 F.G. Finish Grade T.A.D. Top of Area Drain P IIT Ih'G U ET ILS F.H. Fire Hydrant T & B Top and Bottom Fin Finish T. B. Top of Berm D-3 F.L. Flt. Flow Line Flat T.C. Tex. Top of Curb Textured ^ ®1 *� CONSTRUCTIOi\j PECS. F. S. Ftg. Finish Surface Footing T, G. T.G.D. Thk: Top of Grate Top of Grate Drain ThickA S-2 �' IFtn. L.J PL J, I T I I �" G SP,�C . Fountain ■ _'L Jou Ga. Gauge Galvanized T. P. T.P.C. T.S. Top of Paving Top of Poll Louping Top of Steps D-4 PROTO 11 DETAILSG.C, &C. Ground Cover EOM EC ST HOMES w G.1. Galvanized Iron T. W. Top of Wall H.B. Hose Bib TWI. Trowel a Hdr. Brd. Header Board TO. Typical TML:(1001) X483-1320 Horiz. Horizontal Vert, Vertical CONTACT FE95ON : BRIAN NEBEL H.P. High Point W/ With Id�TW SUBMITTAL Hgt, Height W/0 Without 1. D. Inside Diameter W.S. Water Surface Inv. Invert ■ _'L Jou .® FIRST SUBMITTAL - EOM EC ST HOMES w GON(:oOURS ST., SUITS 100 11lD S�-1SIL�lTTA ONTAr-10, CALIFORNIA Ci 11 G -4 a �- TML:(1001) X483-1320 °CFnl _ , .SUBMITTA CONTACT FE95ON : BRIAN NEBEL UJ Id�TW SUBMITTAL in SAN BERNARDINO FWY LOVER AVENUE DSCAAF PREPARED UNDER THE SUPERVISION OF: CIS r,0C , C LI '`' IIIA SHOULD CONSTRUCTION OF THE REQUIRED �,Xrumw;eag9�, Z IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN a ►� y w m , : c� '' W DRAWN BY: KPF SYCAMORE HILLS SCALE: SCA ANA AVE. w SANTA ANA AVE. T IN A DILIGENT HEREON AND CARRIED FORTH MANNER THE CITY ENGINEER MAY REQUIRE =' `V DESIGNED BY: TR ACT. 's 16074 & 16232 COMMUNITY QAC CITIES DISTRICT DATE: Signature * SANTA D r REVISIONS TO THE PLANS TO BRING THEM INTO �- 11) 1 KPF 6/20/02 W t CONFORMANCE WITH CONDITIONS AND `��qr ' , CHECKED BY: APPROVED BY: ; DATE: 00. Dwe. NO.: 1 .. NDERwo op UR. STANDARDS IN EFFECT. F of Ca��� DATE RWK .� ENGINEER R.C.E. 51152 EXP. DATE 12/31/02 3230 19 � t� >� v : ■ f , cc W AV JURUR_ ENUE � � � .. 0015-5 - �wxAi1Zizxr-_.aA,-nc%t4 ?Mco&D m�&a,ys -,_ LANDSCAP CHITECTURE ,... .