FRONT ELEVATION
4N DIA PLUMBING VENT PIPE
EXHAUST FANS
(TYP 2 PLCS)
1'-6"
PRI❑R TO PLACEMENT OF BUILDING, SUBGRADE SHALL BE PROPERLY PREPARED.—/
AT A MINIMUM, 6" OF CRUSHED 3/4" MINUS MATERIAL SHALL BE PROVIDED, CRUSHED BASE
SHALL BE COMPACTED TO 95% OF OPTIMUM DENSITY IN ACCORDANCE WITH ASTM D 1557,
(GRAVEL PAD NOT BY CXT)
i
REAR ELEVATION
SUB -GRADE PREPARATION
2'-4"x10" LEXAN WINDOWS
(TYP 12 PLCS)
0
CD
i
cu
THE 5 INCH THICK FLOOR SLAB OF THE CXT TAOS RESTROOM IS CONSTRUCTED OUT OF 5,000 PSI STEEL REINFORCED
CONCRETE. THE SUB—GRADE UNDER THE SLAB SHALL CONSIST OF A 6—INCH GRAVEL BASE WITH A 1 INCH PLASTER SAND
LEVELING COURSE. THE GRAVEL SHALL BE THREE—QUARTER INCH MINUS ROAD—BASE MATERIAL. THE SOIL UNDER THE GRAVEL BED
AND THE GRAVEL BED SHALL BOTH BE COMPACTED TO 95% RELATIVE COMPACTION. THE GRAVEL SHALL BE PLACED IN TWO
THREE—INCH LIFTS, WITH EACH COURSE AND THE SAND LEVELING COURSE BEING COMPACTED TO THE REQUIRED COMPACTION
LIMIT. THE CONTRACTOR SHALL EXCAVATE THE SUB—GRADES TO THE PROPER GRADE, SO THAT THE FINISH FLOOR ELEVATION OF
THE TAOS RESTROOM WILL BE AS SHOWN ON THE PLANS.
THE WATER, SEWER, AND ELECTRICAL UTILITY LINES, ALONG WITH THE FLOOR DRAINS, NEED TO BE LOCATED WITHIN THE
COMPACTED GRAVEL PAD, IN PLACES THAT CORRESPOND WITH THE OPENINGS CAST INTO THE FLOOR OF THE FACILITY FOR THAT
PURPOSE. A SET OF ENGINEERED AND STAMPED PAD DETAILS WILL SHOW WHERE EACH OF THESE UTILITY LINES SHOULD BE
LOCATED,
THE TAOS RESTROOM FACILITY CONSTRUCTED IN THE ABOVE MANNER WILL EXERT AN OVERALL LOAD OF APPROXIMATELY 280
POUNDS PER SQUARE FOOT. THE CXT ENGINEERING GROUP WILL SUPPLY CLAIFORNAI STATE STAMPED DRAWINGS AND
CALCULATIONS THAT CERTIFY THAT THE TAOS RESTROOM MEETS ALL CALIFORNIA CODES AND THE ANTICIPATED WIND AND
EARTHQUAKE LOADS FOR THE FONTANA AREA.
4649 Brockton Avenue O REV.
Riverside, CA 92506
(951) 369-0700
Fax (951) 369-4039 DIA L
'
"" TWD WORKING e-mail: comwork50pe.net BEFORE DAYS BEFORE
YOU DIG YOU DIG
r // A http:/Iwww.comworksdg.com TOLL FREE 1-800-227- 2600
01S I � M V ROUP A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT
n n
RH SIDE ELEVATION
n n
SMOOTH TEXTURE R❑❑E
i
US
I
I
1
RH SIDE ELEVATION
n n
SMOOTH TEXTURE R❑❑E
REVISION DESCRIPTION DATE ENGR. CITY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT
COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL
i,
i
SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER,
THE CITY OF FONTANA MAY REQUIRE REVISIONS TO THE PLANS TO
BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
STANDARDS IN EFFECT.
LH SIDE ELEVATION.
NORTH
1'-6"
1'-6"
Prepared Under The Supervision Of ; CITY OF FONTANA, CALIFORNIA SCALE:
FLOOR PLAN DATE:
12/7/04
DRAWN BY:
RDW JACK JACK B PARK
DESIGNED BY. LA -4.
Cx E 2
Date : CHECKED BY: APPR D BY. DRAWING NO.: 73/1 CWDG JOB NUMBER: 010320 CXT 3174
NGIN RC.E. 51152 DATE:
all
u
1 1
1
1
1
_
REVISION DESCRIPTION DATE ENGR. CITY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT
COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL
i,
i
SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER,
THE CITY OF FONTANA MAY REQUIRE REVISIONS TO THE PLANS TO
BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
STANDARDS IN EFFECT.
LH SIDE ELEVATION.
NORTH
1'-6"
1'-6"
Prepared Under The Supervision Of ; CITY OF FONTANA, CALIFORNIA SCALE:
FLOOR PLAN DATE:
12/7/04
DRAWN BY:
RDW JACK JACK B PARK
DESIGNED BY. LA -4.
Cx E 2
Date : CHECKED BY: APPR D BY. DRAWING NO.: 73/1 CWDG JOB NUMBER: 010320 CXT 3174
NGIN RC.E. 51152 DATE: