Loading...
HomeMy WebLinkAbout3171-59JACK B ULIK -- AREA PLAN RANDALL AVENUE W Z W Ln V F— U SAN BERNARDINO AVENUE JACK B ULI K - VICINITY MAP DS 02 11! ignature ac tit --i t� Date Q. 4F CAt-�F U VALLEY BLVD, 10 NORTH INSPECTIONS 1. IT IS THE LANDSCAPE CONTRACTORS RESPONSIBILITY TO CONTACT THE ENGINEERING DIVISION'S LANDSCAPE INSPECTOR 48 HOURS PRIOR TO DESIRED INSPECTION OF AN ITEM AT (909) 350-6633. 2. PRIOR TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD COMMENCEMENT, THE FOLLOWING INSPECTIONS ARE REQUIRED: PRE CONSTRUCTION MEETING INSPECTION OF IRRIGATION SYSTEM IN OPEN TRENCH CONDITION (PRIOR TO BACKFILL. MAINLINE PRESSURE TEST @ 150 PSI FOR A THREE HOUR CONTINUOUS PERIOD. IRRIGATION COVERAGE TESTS INCLUDING INITIAL AND FINAL TESTS. PLANT MATERIALS PRIOR TO PLANTING AND SOIL PREPARATION PLANTING, INCLUDING STREET TREES. CONTACT THE PARKS PLANNING AND LANDSCAPE DEVELOPMENT SECTION, ENGINEERING DIVISION, FOR SPECIES AND FINAL LOCATIONS COMPLIANCE WITH APPROVED PLANS FINAL INSPECTION 3, THE OWNER'S REPRESENTATIVE AND LANDSCAPE CONTRACTOR SHALL BE PRESENT AT EACH INSPECTION. DATE ENGR. CITY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT 04 G 1i1aCOMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND NORTH STANDARDS IN EFFECT. PRO) ECT: PREPARED FOR: 11131110� AGENCY SUBMITTAL: JACK 8ULll< PARK PHASE 1--A CITY oFFONTANA CITY OF FONTANA 8353 SIERRA AVENUE FONTANA, CA. 92335 PHONE: (909)350-6703 FAX: (909)3 50-6618 CONTACT: PAUL BURTON DRA WING DE5CRI PTION T- f LC -1A f H--1 HOCKEY RINK - SURFACE H--2 1 H-3 HOCKEY RINK - LAYOUT H--4 HOCKEY RINK - V ETAI L5 I HOCKEY RINK - DETAILS H--6 HOCKEY RINK - 5TR1 PI NG H5--1 HOCKEY 5TR UCTURE H5--2 HOCKEY 5TR UCTURE 145--3 HOCKEY 5TR UCTURE H5-4 HOCKEY 5TR UCTURE JACK B ULIK -- AREA PLAN RANDALL AVENUE W Z W Ln V F— U SAN BERNARDINO AVENUE JACK B ULI K - VICINITY MAP DS 02 11! ignature ac tit --i t� Date Q. 4F CAt-�F U VALLEY BLVD, 10 NORTH INSPECTIONS 1. IT IS THE LANDSCAPE CONTRACTORS RESPONSIBILITY TO CONTACT THE ENGINEERING DIVISION'S LANDSCAPE INSPECTOR 48 HOURS PRIOR TO DESIRED INSPECTION OF AN ITEM AT (909) 350-6633. 2. PRIOR TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD COMMENCEMENT, THE FOLLOWING INSPECTIONS ARE REQUIRED: PRE CONSTRUCTION MEETING INSPECTION OF IRRIGATION SYSTEM IN OPEN TRENCH CONDITION (PRIOR TO BACKFILL. MAINLINE PRESSURE TEST @ 150 PSI FOR A THREE HOUR CONTINUOUS PERIOD. IRRIGATION COVERAGE TESTS INCLUDING INITIAL AND FINAL TESTS. PLANT MATERIALS PRIOR TO PLANTING AND SOIL PREPARATION PLANTING, INCLUDING STREET TREES. CONTACT THE PARKS PLANNING AND LANDSCAPE DEVELOPMENT SECTION, ENGINEERING DIVISION, FOR SPECIES AND FINAL LOCATIONS COMPLIANCE WITH APPROVED PLANS FINAL INSPECTION 3, THE OWNER'S REPRESENTATIVE AND LANDSCAPE CONTRACTOR SHALL BE PRESENT AT EACH INSPECTION. DATE ENGR. CITY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT 04 G 1i1aCOMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND NORTH STANDARDS IN EFFECT. PRO) ECT: PREPARED FOR: 11131110� AGENCY SUBMITTAL: JACK 8ULll< PARK PHASE 1--A CITY oFFONTANA CITY OF FONTANA 8353 SIERRA AVENUE FONTANA, CA. 92335 PHONE: (909)350-6703 FAX: (909)3 50-6618 CONTACT: PAUL BURTON DRA WING DE5CRI PTION T- COVER LC -1A CON5TR UCTION PLAN H--1 HOCKEY RINK - SURFACE H--2 HOCKEY RINK - CONTROL )O1 NT5 H-3 HOCKEY RINK - LAYOUT H--4 HOCKEY RINK - V ETAI L5 H--5 HOCKEY RINK - DETAILS H--6 HOCKEY RINK - 5TR1 PI NG H5--1 HOCKEY 5TR UCTURE H5--2 HOCKEY 5TR UCTURE 145--3 HOCKEY 5TR UCTURE H5-4 HOCKEY 5TR UCTURE H5--5 HOCKEY 5TR UCTURE H5--6 HOCKEY 5TR UCTURE H5-7 HOCKEY 5TRUCTURE DEFERRED SUBMITTALS: HOCKEY 5TR UCTURE ©P CA -F 00411 G http://www.comwork5�g.com Prepared Under The Supervision Of CWDG JOB NUMBER: CITY O DRAWN BY: KCK DESIGNED BY: CCG Date : CHECKED BY: CCG 010320 T--1 SHEET 59 OF 73 F FONTANA, CALIFORNIA SCALE: N.T.S. TITLE -SHEET DATE: 9/25/02 JACK BULIK PARKT-1 PHASE 1-A BY: -2&10k9 la DRAWING NO.: 59 CITY ENGINEER R.C.E. 51152 DATE: 3171 73 2y3%^ 46+9 Brockton Avenue k,, t River5ic e, CA 92506 (909) 369--0700 �p,NDSCgp Fax (909) 369-4.039 � `' � � " SHEET TITLE •(/�• y i1: comworlk50pe.net Date ©P CA -F 00411 G http://www.comwork5�g.com Prepared Under The Supervision Of CWDG JOB NUMBER: CITY O DRAWN BY: KCK DESIGNED BY: CCG Date : CHECKED BY: CCG 010320 T--1 SHEET 59 OF 73 F FONTANA, CALIFORNIA SCALE: N.T.S. TITLE -SHEET DATE: 9/25/02 JACK BULIK PARKT-1 PHASE 1-A BY: -2&10k9 la DRAWING NO.: 59 CITY ENGINEER R.C.E. 51152 DATE: 3171 73