Loading...
HomeMy WebLinkAbout3171-48FIELDS A & B PANEL FAB 0 LCLj 41604 VA @ 25% LOCATION, IN MSA MAIN, M,L.O,/M.L,O. 42,000 ATC. TOTAL PANEL LOAD = 52005 VA BUS RATING 100/100 AMP 480/277V 30,4W MOUNTING, FLUSH LOCATIONVOLTAMPS OA I OB OC "1"' KR A B C �KR CIR 11LTAM11 OA OB OC LOCATION POLE CS 1600 0 1 2 POLE B2 FIELD 'S' 2a/ 2 2134 3200 31 /3 POLE Al FIELD 'A' 1600 3 4 2134 2Q/ 34 1600 1600 5 3 3 3 6 2134 3 36 1600 POLE C7 1600 7 20/ 2a/ 8 :3200 'POLE BI FIELD 'A' 1600 9 10 3200 - 40 - 1600 1 11 /3 73— 12 3200 421 - POLE B4 FIELD 'A' 3200 1 13 20/ 2Q/ 14 2134 POLE A4 FIELD 'A' 3200 15 16 2134 OB OC 3200 17 3 3 18 2134 1 19 - 20 - 6934- 6400 6400 .6400 OA = - SUB TOTAL 17468 7468 7468 I OC = - OA = - OB =- OC = - TOTAL CONNECTED VA = 41604 VA LCLj 41604 VA @ 25% = 10401 VA TOTAL PANEL LOAD = 52005 VA FEEDER AMPS = 62.4 AMPS] POLE Al FIELD 'B' = 41604 VA 2134 = 10401 VA 21 2 M_L.:- 2 22 44— 12134 am r POLE A2 FIELD 'B' 2134 23 24 2134 73 WN 2134 25 3 1 26 2134 0 POLE B1 FIELD 'B' 3200 27 2Q/ 2Q/ 28 3200 POLE B2 FIELD 'S' 3200 29 Z 30 3200 19 3200 31 /3 3 32 3200 OA OB OC POLE C1 1600 33 20/ 2Q/ 34 1600 POLE C2 1600 357 36 1600 : 28 43 t 1600 37 3_ 38 1600 SUB TOTAL - 39 - E3 - 40 - WA 41 - 421 - 6934 6934 6934 OB OC SUB TOTAL =6934 6934 6934- OA = - OB =- I I OC = - TOTAL CONNECTED VA = 41604 VA LCL, 41604 VA @ 25% = 10401 VA TOTAL PANEL LOAD = 52005 VA FEEDER AMPS = 62,4 AMPS] FIELDS C & D NOTESt PROVIDE SPLIT BUS PANEL 11 PANEL FCD OCATION, IN MSA BUS RATING 480/277V 30,4W MAIN, M,L,O,/M.L,O. 100/100 AMP l� MOUNTING1 FLUSH 000 AXC, LCL, VA @ 25% = VA TOTAL PANEL LOAD VA FEEDER AMPS = AMPS 7939 Palm Ave 44— 5 am r 7 8 910 WN it 12* 0 14 15 16 a 18 19 20 121 OA OB OC TOTAL CONNECTED VA VA LCL, VA @ 25% = VA TOTAL PANEL LOAD VA FEEDER AMPS = AMPS TOTAL CONNECTED VA VA LCL, VA @ 25% = 1 W4 TOTAL PANEL LOAD VA FEEDER AMPS WA 7939 Palm Ave 44— 5 am r 7 8 910 WN it 12* 0 14 15 16 a 18 19 20 121 22 23 24 25 26 ra : 28 43 t 29 SUB TOTAL OA = OB = OC WA w OA OB OC TOTAL CONNECTED VA VA LCL, VA @ 25% = VA TOTAL PANEL LOAD VA FEEDER AMPS AMPS] ZOVIDE SPLIT BUS PANEL PANEL SF LOCATION, IN MSA BUS RATING 480/277V 30,4W MAIN, M.L,O, 200 AMP 42,000 AXC, MOUNTING, FLUSH LOCATION VOLTAMPS ICIR BKR OA T_0B I OC I A B C KR CIR OLTAMPS LOCATION 41A0B—oc, VA FEEDER AMPS AMPS 7939 Palm Ave 44— 5 7 8 910 it 12* 13 14 15 16 17 � 18 19 20 121 22 23 24 25 26 27 : 28 43 t 29 SUB TOTAL OA = OB = OC TOTAL CONNECTED VA VA LCL, VA @ 257. = VA TOTAL PANEL LOAD = VA FEEDER AMPS AMPS Engineering Inc. Electrical Engineering & consulting 0 7939 Palm Ave Highland. Ca. -4 92346 17 909 864-0223 Fax 909 864-0280 0 :9 jeaeng*earthlink.net U-1 F1 ELS "A FAB -7,9,11 P C7 1 F_\ (D ff/1 y/!%� 7. FAB -14,16,18(D TO FCDO ---F �_ 1 15 17 11_� __!� 7 TO E 3 920 (6} Lb (6) 4F 4' Q� 280 &4 I__ L B-8,10,1 & 27,29,3� F 0 9 (6) (6) I 4I ON A LT #1 I 1 19 FAB -33,35,37 C1 Ep P '480 MAIN SERVICE "MSA", PANELS "FAB-, -FCD- & "SF" FAB -22,24,26 Q2 '-2 8,3 0,3 2 OFD- F C _ �f Q B2 P W L I /5 -F -F\ \noj --`FAB-34,36,38 C2 rP_j-'*" F Q N� 80 " TO SF(�9)i TO FCD 07 1 Lb ELECTRICAL RICAL FIF LD SPORTS LIGHTING PLAN REV. REMSON DESCRIP11ON DATE I ENGR. CITY DATE &�O� C__v� plecIv2f- SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL C= 2_S3 -0- ......... SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, -Y. AAA AAAAAAAAAA DIAL TWO WORKING THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BEFORE DAYS BEFORE BRING THEM INTO CONFORMANCE WITH CONDITIONS AND YOU DIG YOU DIG 4L STANDARDS IN EFFECT. TOLL FREE 1-800-227-2600 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT 1-0 TO SF 07 Prepared Under The Supervision Of : Date PLAN NOTES: 1-C., 3 #10 & 1 #10 E/G FROM PULLBOX TO MUSCO POLE BALLAST COMPARTMENT. 1 -C., 3 #8 & 1 #8 E/G. 1 1/4"C.O. 1"C., 6 #10 & 1 #10 E/G AND (1) 1-C.O. FROM PULLBOX TO MUSCO POLE BALLAST COMPARTMENT. 1 -C., 3 #6 & 1 #6 E/G. 1"C., 3 #8 & 1 #8 E/G FROM PULLBOX TO MUSCO POLE BALLAST COMPARTMENT. 1 1/2"C.O. (4) 1 1/2-C.O. (3) 1 1/2"C.O. CITY 0 DRAWN BY: FM3 DESIGNED BY: JjC CHECKED BY: JTT/JCC TO SF Ey TO SF ng North I- N rth - n F F O N TA N A, CALIFORNIA SCALE: , AS - �NOTED ELECTRICAL PLAN DATE: 5/15/02 JACK BULIK PARK E_4 PHASE 1 APPRQNU BY: DRAWING NO.: 48 317 CI ENGINEER R.C.E. 51152 DATE: 1, 731