HomeMy WebLinkAbout3171-17DSc��
y�o,pC�
CO
N1
USignature r r
t� Date
9T ?�
4649 Brockton Avenue
Riversic{e, CJS 92506
(909) 369-0700
1`4,x (909) 369-4039
4
r e-mail: comworksope.ryet
s
http://www,comwork54g.rom
MA 1 C:HL/IVL=y 5CC St -l== t LL., --J
Prepared Under The Supervision Of : CITY OF FONTANA CALIFORNIA-
----yd�
CONSTRUCTION PLAN
RAWN BY:
MA JACK BULIK PARK
DESIGNED BY:
CCG PHASE 1
Date : CHECKED BY: APPu1 .D BY:
CCG
� !o �r • e�Z.
CWDG JOB NUMBER: 010320 C TY ENGINEER R.C.E. 51152 DATE:
SCALE:
1" = 20'0"
DATE:
9/25/02
LC -2
DRAWING NO.:
;YT 3171
REV,
REVISION DESCRIPTION
DATE
ENGR.
CITY
DATE
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT
COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL
SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER,
DIAL
:f
THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO
Two WORKING
BEFORE DAYS BEFORE
YOU DIG YOU DIG
-
BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
TOLL FREE 1-800--227-2600
x
STANDARDS IN EFFECT.
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT
71Y
Prepared Under The Supervision Of : CITY OF FONTANA CALIFORNIA-
----yd�
CONSTRUCTION PLAN
RAWN BY:
MA JACK BULIK PARK
DESIGNED BY:
CCG PHASE 1
Date : CHECKED BY: APPu1 .D BY:
CCG
� !o �r • e�Z.
CWDG JOB NUMBER: 010320 C TY ENGINEER R.C.E. 51152 DATE:
SCALE:
1" = 20'0"
DATE:
9/25/02
LC -2
DRAWING NO.:
;YT 3171