HomeMy WebLinkAbout3171-1i
JACK B UL I K - SITE PLAN
LU
Z
W
X
VALLEY BLVD.
/110
INSPECTIONS
1. IT IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE ENGINEERING DIVISION'S LANDSCAPE INSPECTOR 48 HOURS
PRIOR TO DESIRED INSPECTION OF AN ITEM AT (909) 350-6633.
2. PRIOR TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD COMMENCEMENT, THE FOLLOWING INSPECTIONS ARE REQUIRED:
PRE CONSTRUCTION MEETING
INSPECTION OF IRRIGATION SYSTEM IN OPEN TRENCH CONDITION (PRIOR TO BACKFILL. MAINLINE PRESSURE TEST @ 150 PSI FOR A
THREE HOUR CONTINUOUS PERIOD.
IRRIGATION COVERAGE TESTS INCLUDING INITIAL AND FINAL TESTS.
PLANT MATERIALS PRIOR TO PLANTING AND SOIL PREPARATION
PLANTING, INCLUDING STREET TREES. CONTACT THE PARKS PLANNING AND LANDSCAPE DEVELOPMENT SECTION, ENGINEERING
DIVISION, FOR SPECIES AND FINAL LOCATIONS
COMPLIANCE WITH APPROVED PLANS
FINAL INSPECTION
3. THE OWNER'S REPRESENTATIVE AND LANDSCAPE CONTRACTOR SHALL BE PRESENT AT EACH INSPECTION.
77"4649 Brockton Avenue
' REV. REVISION DESCRIPTION
wq, Riverside, CA 92506
i a
(909) 369-0700 a
VM
z ..
Fax (909) 369-4039 ;
DIAL TWO WORK i NG , _
e-mail!comwork@pe.net BEFORE .,,.%� DAYS BEFORE
� YOU DIG YOU BIG
R http,//www.comwork�g.com �` °$
rr Q n TOLL FREE 1-800-227-2600
01510 V U h r A PUBLIC-SERVICE BY UNDERGROUND SERVICE ALERT
PREPARED FOR:
)ACi< e UL I 1<
PARK
PHASE 1
C/TY OF FONTANA
CITY OF FONTANA
8353 SIERRA AVENUE
FONTANA, CA. 92 3 3 5
PHONE: (909)350-6703
FAX: (909)350-6618
CONTACT: PAUL BURTON
AGENCY SUBMITTAL:
SHEET INDEX:
DRAWING DE5CRI PTION
T 1 COVER
DESCRIPTION
L04 DEMOLITION PLAN
ARCHITECTURE PLAN
L0-2 DEMOLITION PLAN
ARCHITECTURE PLAN
LD -3 DEMOLITION PLAN
ARCHITECTURE PLAN
C-1 ENGINEER PLAN
ARCHITECTURE PLAN
C-2 ENGINEER PLAN
ARCHITECTURE PLAN
C-3 ENGINEER PLAN
ARCHITECTURE PLAN
C-4 ENGINEER PLAN
PRE -FAB RESTROOM
C--5 ENGINEER PLAN
INTERIOR ELEVATIONS
C-6 ENGINEER PLAN
FLOOR PLAN
C--7 ENGINEER PLAN
EXTERIOR ELEVATIONS
C-8 ENGINEER PIAN
ELECTRICAL SITE PLAN
L54 57A KI NG PLAN
ELECTRICAL NOTE5
L5-2 STAKING PLAN
RESTROOM & CONCESSIONS
L5-3 STAKING PLAN
5PORT5 LIGHTING
LC -T CONSTRUCTION PLAN
ELECTRICAL DETAILS
LC -2 CONSTRUCTION PLAN
IRRIGATION PLAN
LC --3 CONSTRUCTION PLAN
IRRIGAITON PLAN
LC --4 CON57 / IRRIG. DETAILS
IRRIGATION PLAN
LC --5 CONSTRUCTION DETAILS
IRRIGATION DETAILS
LC -6 CONSTRUCTION DETAILS
PLANTING PLAN
A-1 ARCHITECTURE PLAN
PLANTING PLAN
A-2 ARCHITECTURE PLAN
PLANTING PLAN
A-3 ARCHITECTURE PLAN
TREE PLAN
A--4 ARCHITECTURE PLAN
LANDSCAPE DETAILS
A-5 ARCHITECTURE PLAN
A-6 ARCHITECTURE PLAN
A-7 ARCHITECTURE PLAN
A-8 ARCHITECTURE PLAN
A-9 ARCHITECTURE PLAN
A -1O ARCHITECTURE PLAN
A-11 ARCHITECTURE PLAN
A-1.2 ARCHITECTURE PLAN
A-13 ARCHITECTURE PLAN
AGENCY SUBMITTAL:
DEFERRED SUBMITTALS:
PREFABRICATED RESTROOM5
PICNIC SHELTERS
4649 Brockton Avenue BACK5TOP5
PLAY EQUIPMENT
FLAG POLES
Riverside, CA 51,-
(909)
2(909) 369-0700
Fax (909) 369-4039
gSHEET TITLE
1 F— na u�r/e� ,.,�
hY3 �V V
Date �
e-mail: comworksOpe.net
h-Up://www.comwork5�g.COM
T-�
SHEET OF 73
PLAN NUMBER P—
DATE ENGR. CITY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT Prepared Under The Supervision Of : CITY OF FONTANA, CALIFORNIA SCALE:
N.T.S.
COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL TITLE SHEET DATE.
9/25/0
SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, DRAWN BY:
KCK JACK BULIK PARK
THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO DESIGNED BY: T-1
CCG PHASE 1
BRING THEM INTO CONFORMANCE WITH CONDITIONS AND NORTH Date CHECKED 3Y: APPRO BY -
BRING DRAWING NO.:
CCG �""J !�
STANDARDS IN EFFECT.3171
CWDG JOB NUMBER: 010320 CTY ENGINEER R.C.E. 511,52 DATE:
i
DRA WING
DESCRIPTION
A-14
ARCHITECTURE PLAN
A-15
ARCHITECTURE PLAN
A--16
ARCHITECTURE PLAN
A--17
ARCHITECTURE PLAN
A-18
ARCHITECTURE PLAN
A--19
ARCHITECTURE PLAN
LA -1
PRE -FAB RESTROOM
LA --2
INTERIOR ELEVATIONS
LA -3
FLOOR PLAN
LA -4
EXTERIOR ELEVATIONS
E-1
ELECTRICAL SITE PLAN
E-2
ELECTRICAL NOTE5
E-3
RESTROOM & CONCESSIONS
E--4
5PORT5 LIGHTING
E-5
ELECTRICAL DETAILS
LI --T
IRRIGATION PLAN
LI -2
IRRIGAITON PLAN
LI -3
IRRIGATION PLAN
LI -d4
IRRIGATION DETAILS
LP -T
PLANTING PLAN
LP -2
PLANTING PLAN
LP -3
PLANTING PLAN
LP -4
TREE PLAN
LP -5
LANDSCAPE DETAILS
DEFERRED SUBMITTALS:
PREFABRICATED RESTROOM5
PICNIC SHELTERS
4649 Brockton Avenue BACK5TOP5
PLAY EQUIPMENT
FLAG POLES
Riverside, CA 51,-
(909)
2(909) 369-0700
Fax (909) 369-4039
gSHEET TITLE
1 F— na u�r/e� ,.,�
hY3 �V V
Date �
e-mail: comworksOpe.net
h-Up://www.comwork5�g.COM
T-�
SHEET OF 73
PLAN NUMBER P—
DATE ENGR. CITY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT Prepared Under The Supervision Of : CITY OF FONTANA, CALIFORNIA SCALE:
N.T.S.
COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL TITLE SHEET DATE.
9/25/0
SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, DRAWN BY:
KCK JACK BULIK PARK
THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO DESIGNED BY: T-1
CCG PHASE 1
BRING THEM INTO CONFORMANCE WITH CONDITIONS AND NORTH Date CHECKED 3Y: APPRO BY -
BRING DRAWING NO.:
CCG �""J !�
STANDARDS IN EFFECT.3171
CWDG JOB NUMBER: 010320 CTY ENGINEER R.C.E. 511,52 DATE:
i