HomeMy WebLinkAbout3163-1r
L
N-Ok5(CAPE I
FONTANA., . CALIFORNIA
VICINITY
PROJECT SITE
CLARK
rz
NORTH
KEY MAP
I
I
DRAWN BY:
NOT TO SCALE
SCALE:
DESIGNED BY:
ABBREVIATIONS
CHECKED BY:
A/C
ASPHALTIC CONCRETE
1
6
C.J.
COLD JOINT
¢
CENTER LINE
CL.
CLEARANCE
CITY"'Ed QUIRED NOTES:
CONC.
CONT
CONCRETE
CONTINUOUS
DIA.
DIAMETER
D.F.
DOUGLAS FIR
EA.
EACH
INSPECTIONS:
E.J.
EXPANSION JOINT
EQ.
EQUAL
EXIST.
EXISTING
1. IT IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE ENGINEERING DIVISION'S
FIG.
FOOTING
LANDSCAPE INSPECTOR 48 HOURS PRIOR TO DESIRED INSPECTION OF AN ITEM AT (909) 350-6633
GALV.
GALVANIZED
H.B.
HEADER BOARD
2. PRIOR TO RELEASE OF UTIUTIES OR MAINTENANCE PERIOD COMMENCEMENT THE FOLLOWING
M.B.
MACHINE BOLT
INSPECTIONS ARE REQUIRED:
MAX.
MAXIMUMMIN. MINIMUM
NAT.
NATURAL
PRE—CONSTRUCTION MEETING
N.I.0
NOT IN CONTRACT
N.T.S.
NOT TO SCALE
INSPECTION OF IRRIGATION SYSTEM IN OPEN TRENCH CONDITION (PRIOR TO BACKFILL).
O.C.
ON CENTER
MAINUNE PRESSURE TEST 0150 P.S.I. FOR THREE (3) HOUR CONTINUOUS PERIOD.
P.A.
PLANTING AREA
IP
PROPERTY LINE
IRRIGATION COVERAGE TESTS INCLUDING INITIAL AND FINAL TESTS.
W.
RADIUS
R.S.
RESAWN
FINISH GRADE PRIOR TO PLANTING.
R.
RISER
R.O.S.
ROUGH SAWN
PLANT MATERIALS PRIOR TO PLANTING AND SOIL PREPARTION.
RIND.
REDWOOD
SHE
SHEET
PLANTING, INCLUDING STREET TREES. CONTACT THE PARKS PLANNING AND LANDSCAPE
S.L.
SCORELINE
DEVELOPMENT SECTION, ENGINEERING DIVISION, FOR SPECIES AND FINAL LOCATIONS.
SQ.
SQUARE
S4S.
SURFACED FOUR SIDES
COMPLIANCE WITH APPROVED PLANS
STD.
STANDARD
T.F.
TOP OF FOOTING
FINAL INSPECTION.
T W
F WALL
TTOOP
TYP.
TYPICAL
3. THE OWNER'S REPRESENTATIVE AND LANDSCAPE CONTRACTOR SHALL BE PRESENT AT EACH INSPECTION.
W.I.
WROUGHT IRON
W.W.M.
WOVEN WIRE MESH
d
PENNY (NAIL SIZE)
GENERAL NOTES
HARDSCAPE
1. CONTRACTOR TO REVIEW CONSTRUCTION PLANS AND GRADING PLANS THOROUGHLY PRIOR TO BEGINNING WORK.
2. CONTRACTOR TO CONTACT LANDSCAPE ARCHITECT AND CITY INSPECTOR PRIOR TO START OF CONSTRUCTION FOR PRE
JOB MEETING. ALLOW 48 HOURS LEAD TIME.
3. CONTRACTOR TO CONTACT LANDSCAPE ARCHITECT AND CITY INSPECTOR TO REVIEW HARDSCAPE FORMING PRIOR TO
POURING. ALLOW 48 HOURS LEAD TIME.
4. CONTRACTOR SHALL NOT MAKE FIELD CHANGES TO PLANS UNLESS AUTHORIZED BY LANDSCAPE ARCHITECT AND CITY
INSPECTOR. UNAUTHORIZED CHANGES SHALL BE CORRECTED TO CONFORM TO THE PLANS AT NO ADDITIONAL COST TO
THE OWNER.
5. CONTRACTOR SHALL VERIFY LOCATION OF UNDERGROUND UTILITIES AND SERVICES PRIOR TO ANY DIGGING.
CONTRACTOR ASSUMES FULL RESPONSIBILITY FOR ALL DAMAGE CAUSED BY FAILURE TO DO SO.
6. CONTRACTOR TO PULL ALL NECESSARY BUILDING PERMITS NEEDED TO COMPLETE JOB.
IRRIGATION
1. FINAL LOCATION OF CONTROLLER TO BE DETERMINED IN THE FIELD WITH APPROVAL OF CITY AND LANDSCAPE
ARCHITECT.
2. REFER TO GENERAL IRRIGATION NOTES ON IRRIGATION PLAN.
PLANTING --
1. ALL BOX TREES ARE TO BE SELECTED BY THE LANDSCAPE ARCHITECT.
2. CONTRACTOR IS TO SPOT ALL PLANT MATERIAL AND HAVE LANDSCAPE ARCHITECT AND CITY INSPECTOR APPROVE THE
SPOTTING PRIOR TO THE EXCAVATION OF ANY PLANT PIT. ALLOW 48 HOURS LEAD TIME. ANY TREE, SHRUB OR
VINE THAT IS PLANTED WITHOUT APPROVAL OF THE LANDSCAPE ARCHITECT OR CITY INSPECTOR MAY BE MOVED AT
THE CONTRACTOR'S EXPENSE.
3. REMOVE STAKES FROM ALL ESPAUERS AND VINES AND ATTACH TO WALLS, POSTS, ETC.
4. PRIOR TO PLANTING INSTALLATION, CONTRACTOR SHALL HAVE SOIL TESTED AND SEND RESULTS TO PUBLIC WORKS
INSPECTOR. REFER TO SPECIFICATIONS FOR SOIL PREPARATION INFORMATION.
5. CONTRACTOR TO CONTACT LANDSCAPE ARCHITECT AND CITY INSPECTOR FOR FINAL INSPECTION WHEN INSTALLATION
IS COMPLETE, AND FOR A FINAL MAINTENANCE INSPECTION AT THE END OF THE MAINTENANCE PERIOD.
SHEET INDEX
COVER SHEET L-1
IRRIGATION PLAN L-2
PLANTING PLAN L-3-
CONSTRUCTION
-3.CONSTRUCTION DETAILS L-4
SPECIFICATIONS L-5, L-6
CpR,O 40/1A�.�1i�
CITY OF FONTANA, CALIFORNIA
DRAWN BY:
SCALE:
DESIGNED BY:
DATE:
CHECKED BY:
APP D BY: DATEa>' 13 •
CITY ENGINEER R.C.E. // tL EXP. DATE j. O3163
DWG. N0.
1
6
"wr
1
O
1
h�
Fri
w
O
w
w
Adz
w Z
rA COLO
O
DRAWN BY DATE
\,Ii,,[)SCAPf BIC 2/6/02
JOB NO.
�c 10/31/02 * SHEET NO.
Re n W Dat.
Op CAL\
OF (o SHTS.