HomeMy WebLinkAbout5312-3SCALE I "=20'
O 20 40 60
15ENCMMARK
SAN 13ERNARDINO COUNTY BENCHMARK, BEING A
RAILROAD SPIKE IN THE NORTH SIDE OF A POWER
POLE (NO NUMBER), 30 FEET SOUTH Of THE SOUTH
RAIL, 3G FEET WEST Of BANANA STREET EXTENSION.
ELEV. 1008.531 FT.
UNDERGROUND
SERVICE
ALERT
Call Toll Free
1-800-422-4133
Two working days before you dig
APN 23G+091 +37
N.A.P.
THATCHER ENGINEERING
& ASSOCIATES, INC.
345 5TH STREET, SUITE B
REDLAND5,CA 92374
(909) 748-7777 FAX (909) 748-7776
McMn W. Thatcher, III R.C.E. 39964
0 o. Date Prepared esigne,
0202.0' 5/29/01 M.W.T.
Dec 3 1 , 2001
Drawn By Reference
J.T.S. G0202R2
Of 3
3
APN 23G+091 +33
N.A.P.
CHIEF, TRAFFIC DIVISION
TRANSPORTATION/FLOOD
-x`01
APPROVED BY
OF TRANS
Oro_bCo.a
DATE
"PRELIMINARY SECTION. FINAL SECTION TO BE DETERMINED BY
SOILS ENGINEER.
STREET IMPROVEMENT PLANS
BANANA AVENUE
NORTH OF SANTA ANA AVENUE
STA 20+00 TO 20+98.96
CUP/W140-107/99
W.O. NO.
ROAD NO.
FILE NO.
170-108
SHEET OF
3
5312-3