Loading...
HomeMy WebLinkAbout5312-3SCALE I "=20' O 20 40 60 15ENCMMARK SAN 13ERNARDINO COUNTY BENCHMARK, BEING A RAILROAD SPIKE IN THE NORTH SIDE OF A POWER POLE (NO NUMBER), 30 FEET SOUTH Of THE SOUTH RAIL, 3G FEET WEST Of BANANA STREET EXTENSION. ELEV. 1008.531 FT. UNDERGROUND SERVICE ALERT Call Toll Free 1-800-422-4133 Two working days before you dig APN 23G+091 +37 N.A.P. THATCHER ENGINEERING & ASSOCIATES, INC. 345 5TH STREET, SUITE B REDLAND5,CA 92374 (909) 748-7777 FAX (909) 748-7776 McMn W. Thatcher, III R.C.E. 39964 0 o. Date Prepared esigne, 0202.0' 5/29/01 M.W.T. Dec 3 1 , 2001 Drawn By Reference J.T.S. G0202R2 Of 3 3 APN 23G+091 +33 N.A.P. CHIEF, TRAFFIC DIVISION TRANSPORTATION/FLOOD -x`01 APPROVED BY OF TRANS Oro_bCo.a DATE "PRELIMINARY SECTION. FINAL SECTION TO BE DETERMINED BY SOILS ENGINEER. STREET IMPROVEMENT PLANS BANANA AVENUE NORTH OF SANTA ANA AVENUE STA 20+00 TO 20+98.96 CUP/W140-107/99 W.O. NO. ROAD NO. FILE NO. 170-108 SHEET OF 3 5312-3