Loading...
HomeMy WebLinkAbout5311-1I 1+00 2+00 3+00 za 0 cn�~ �ca`O z LLJ� w H Q oca ZOILL OJ o+� ri- =� 01310 #z z- ws� u u- u au mXv �w .p nzT +v- UJ .owe + O m� mow«1HN Fl - wQ H +oc m� +w� U mL LL wM I R 8g X - obi - I EXISTN6 PGG G46 C/=W LLJ O O >i >L VIGINITY MAP NN SHIm ,, �., IQ INTERSTATE 10 SLOVER PROJEGT - SGALE:1' SURVEY DATE: 05/27/98 SAN DERNARDINO COUNTY DENGHMARK, BEING A RAILROAD 5FIKE IN THE NORTH SIDE OF A POWER POLE (NO NUMBER), 30 FEET 50UTH OF THE 50UTH RAIL, X. FEET WEST OF BANANA STREET EXTENSION. ELEV. 1008.531 FT. 4+00 ii UNDERGROUND SERVICE ALERT Cal Toll Free 1-800-422-4133 Two `o*'S days before you dg 5+00 F; GJRD RETURN GURVE DATA A -66'25'17- K-20, L-23.18 T-13.09 MELV 12/31/0 CIVIL , 6+00 LL m H n 7+00 a - 5 00'363_38'W- . _stCxi ` 7 DIRT D/W 1 GATE J u- H N- 8 GON5TRUGTION NOTES/ESTIMATE OF QUANTITIES �I GON5TRUCT 6' AG OVER COMPACTED NATIVE ..... 412 -TONS AG* Q GON5TKUGT 8' PGG CURD AND GUTTER PER GNTY 5TD 115 ........:............. ...... ------ _LF Q GON5TRUGT PGG SIDEWALK PER GNTY 57D 109 TYPES 2400 5F_(15,0Tit 5jwe:e%S) GON5TKUGT DRIVEWAY PER GNTY 5TD 1298 ..... -- 1500 ___SF (5 5AWGUT EXISTING AG PAVEMENT ............ ---- 610LF © REMOVE EXISTING AG PAVEMENT ............ 610 5F 07 POWER POLE TO DE RELOCATED DY OTHEK5..._ 5 ___EA ® INSTALL UNDER5IDEWALK DRAIN PER COUNTY STD 210..__1 ___EA Q IN5TAL1- MIN. O.I"AG OVERLAY ...................................... 600____5F 10 INSTALL HANDICAPPED KAMP PER CO. 5TD I IOD .......... __ I ___EA * PRELIMINARY 5EGTION: FINAL 5EGTION TO BE DETERMINED BY ** 5011-5 ENGINEER ESTIMATE OF QUANTITIES 15 FOR PERMIT PUFP05E5 ONLY CONTRACTOR 15 FE51`01\15151--E FOR OWN QUANTITIES. THATCHER ENGINEERING FIELD BOOK RE A ASSOCIATES, INC. $45SO COUNTY UM ROAD, STE 3 YUOAPA, CA. MN (909) 79e-11419 FAX (909) 796•14! NNvN W. TnnoMr, ■ RC.e 30004 Exp. Deo 31, 2001 Jeb Rw I Date Prepared I De4100e0 By Dram By Reforeeu )604.01 INOVEMBER 19981 M.W.T. p1 6060481 f I2 in EXIST. CHAIN LNK� FENCE TO DE REMOVED 9 WTF >E l` =i7 LL v w t1- Z ad 15" %NDSGAI BUFFER -AVE- I GENERAL, NOTES: I. ALL WORK 5HALL BE DONE IN ACCORDANCE WITH THI5 PLAN AND THE SAN DERNARDINO COUNTY STANDARD SPEGIFIGATION5. Z. IF A5FHALT CONCRETE IS TO DE FLAGED DIKEGTLY ON 51,J5-6RADE OF ROAD OR DRAINAGE FAGILITIE5, 5011- STERILANT KEGI5TERED DY THE E.P.A. FOR U5E UNDER AG AND PGG 5HALL DE UNIFORMLY APPLIED AT THE MANUFAGTURER'5 RECOMMENDED RATE FOR THE FULL PAVEMENT WIDTH PRIOR TO PAVING. 3. AT THE GOMPLETION OF PAVING, A MATERIALS REPORT SHALL DE SUBMITTED TO THE 5AN BEKNARDINO COUNTY TRAN5PORTATION DEPARTMENT PERMIT SEGTION LISTING ALL TEST OR DETEKMINATION5 GOMPLETED TO VERIFY A. K -VALUE, SIEVE ANALY515 AND SAND EQUIVALENT OF OF AGGREGATE DA5E5. D. 5TADILITY, OIL CONTENT AND 51EVE ANALY515 OF ASPHALT 5URFAGING. 4. A PERMIT SHALL BE OBTAINED FROM THE COUNTY TRANSPORTATION DEPARTMENT PERMIT 5EGTION PRIOR TO ANY GON5TKUGTION. 5. ALL PIPE L'1YE5 OR 5UD5TKUCTUKE5 OF ANY KIND, TELEPHONE OR POWER POLE5, WATER METERS, VALVES, HYDKANT5,ETG. SHOWN OR NOT SHOWN ON THESE PLANS, WITHIN THE LIMITS OF THI5 DEVELOPMENT OR IN ADJAGENT AFEA5 WHERE IMPROVEMENT WORK 15 TO DE DONE SHALL BE REMOVED OR RELOCATED AT THE DEVELOPER'S EXPENSE AND AT NO G05T TO THE SAN DERNARDINO COUNTY TRANSPORTATION DEPARTMENT. IT SHALL BE THE OWNER'S RE5PON51DILITY TO NOTIFY ALL AGENGIE5 CONCERNED. 6. COMPACTION TE5T5 OF EMBANKMENT GON5TRUGTION TRENCH BACKFILL, GOMPAGTING ORGINAL GROUND, AND ALL 5UD6RA1)ES SHALL DE PERFORMED AT NO 605T TO 5AN DEFNAKDINO COUNTY. A WRITTEN REPORT WITH THESE COMPACTION TE5T5 SHALL BE 5UDMITTED TO THE 5AN DERNARDINO COUNTY TRANSPORTATION DEPARTMENT PERMIT SECTION FOR APPROVAL PRIOR TO PLAGEMENT OF BASE MATERIALS AND/OR 5URFAGIN6. 7. ALL LATERAL GUTS IN COUNTY MAINTAINED ROADWAYS 5HALL BE TESTED TO VERIFY DENSIFIGATION TO 90% RELATIVE COMPACTION (KC.) AT VARYING DEPTHS TO WITHIN 0.5 FEET OF GRADING PLAN THE TOP 0.5 FEET 5HALL DE DEN5IFIED TO 95%. 8. ALL LONGITUDINAL GUTS SHALL DE TESTED IN ACCORDANCE WITH THE 5PEGIFIED LIMITS AND FREQUENCY A5 OUTLINED IN 5EGTION 6 OF 5AN DEKNAKDINO COUNTY STANDARDS AND SPEGIFIGATION5. 9. IMMEDIATELY FOLLOWING REMOVAL OF EXISTING PAVEMENT OR DIKE OR CURB AND/OR GUTTER, THE CONTRACTOR SHALL DILIGENTLY PUK5UE THI5 PORTION OF WORK UNTIL GOMPLETION. 10. AN ENCROACHMENT PERMIT MUST FIRST DE OBTAINED FROM THE COUNTY TKANSPOKTAION DEPARTMENT PERMIT 5EGTION PRIOR TO MAKING APPLIGATION AND 155UANGE OF A GRADING PERMIT OR BUILDING PERMIT. II. TRANSPORTATION DEPARTMENT APPROVAL DOES NOTINGLUDE WATER OR SEWER 5Y5TEM OR ESTIMATE OF QUANTITIES. 12. EXISTING COUNTY KOAD5 WHICH WILL REQUIRE KEGON5TKUGTION 5HALL REMAIN OPEN FOR TKAFFIG AT ALL TIME5, WITH ADEQUATE DETOURS DURING ACTUAL GONSTRUGTION. 13. AT THE COMPLETION OF ROUGH GRADING, A MATEKIAL5 REPORT AND THE PROP05E1) STFUGTUKAL 5EGTION5 SHALL DE SUBMITTED DY THE ENGINEER TO THE 5AN DERNAKDINO COUNTY TRANSPORTATION DEPARTMENT, FIELD ENGINEERING DIVISION, TRANSPORTATION PERMITS 5EGTION, FOR REVIEW AND EVALUATION DY THE PAVEMENT MANAGEMENT 5EGTION. THE SUBMITTAL SHALL INCLUDE A PLAT SHOWING THE LOCATION OF SAMPLING A TABULATION OF THE SIEVE ANAL -Y'51'5 AND THE SAND EQUIVALENT TEST KE5ULT5, A STATEMENT OF RECOMMENDED STRUG7UFA1- 5EGTION AND DATA SHEETS FOR ALL K -VALUE TE5T5 PERFORMED, INGLUDING EXPANSION PRESSURE READINGS. APPROVAL WILL DE GIVEN WHEN ALL STFUGTUKAL 5EGTION REQUIREMENTS HAVE BEEN MET. 14. IF DURING GON5TFUGTION, GROUND WATER IS ENCOUNTERED, A ** SYSTEM APPROVED BY THE 5AN DEKNARDINO COUNTY TRANSPORTATION DEPARTMENT SHALL BE INSTALLED TO DEWATER SAID AREA AT THE DIKEGTION OF THE 5011-5 ENGINEER, TRAFFIC, GONTROL-GENERAL NOTES I. ALL 516NIN6, 5TRIPIN6 AND PAVEMENT MARKINC75 5HALL BE IN GONFOKMANGE WITH THE CURRENT EDITION OF THE TRAFFIC MANUEL, PUDLI5HED DY THE STATE OF GALIFORNIA, DEPARTMENT OF TKAN51"ORTATION. 2. ALL 5TFIPING AND PAVEMENT MARKINGS SHALL DE THEKMOPLA5TIG (ALKYD BASE TYPE). 3. ALL 516N5 AND FOAD5IDE MARKERS SHALL BE OF HIGH INTEN5ITY (FHWA TYPE III) REFLECTIVE SHEETING, EXCEPT 5TOF 5I61\15 SHALL DE DIAMOND GRADE (FHWA TYPE IIIA) FEFLEGTIVE SHEETING. 4. 5161\15 5HALL BE MOUNTED ON METAL POSTS 51MILAR TO COUNTY 5TANDARD5 303(A) AND 303(8). 5, ALL GONFLIGTING STRIPING AND PAVEMENT MARKINGS NOT SHOWN ON THE PLAN5 SHALL BE REMOVED BY THE CONTRACTOR REMOVAL SHALL DE AGCOMPLI5HED BY 5ANDDLA5TIN6, GRINDING, OR A5 DIRECTED DY THE COUNTY REPRESENTATIVE. 6, ALL GONFLIGTING SI6N5 SHALL DE EITHER REMOVED, RELOGATED OF COVERED BY THE CONTRACTOR. RELOGATABLE 516N5 SHALL DE INSTALLED AS 5PEGIFIED ON THE PLAN5 OR AS DIRECTED DY COUNTY REPRESENTATIVE. 7. ALL EXISTING SIGNING, STKIPING AND PAVEMENT MAKKING5 NOT SHOWN ON PLANS, IF REMOVED / OBLITERATED, SHALL BE REPLACED / RESTORED OF SAME KIND, AND IN CONFORMANCE WITH THE CURRENT EDITION OF THE TRAFFIC MANUAL PUDLI5HED DY THE STATE OF CALIFORNIA, DEPARTMENT OF TRAN5POKTATION. 8. THE CONTRACTOR 5HALL NOTIFY COUNTY REPRESENTATIVE TO SGHEDULE WITH TRAFFIC DIVISION PERSONNEL FOR A FINAL REVIEW (WALK THROUGH) AND APPROVAL OF TRAFIG CONTROL DEVIGE5 PRIOR TO PROJEGT ACCEPTANCE. 9, ALL GONSTRUGTION SIGNS 5HALL DE DL -ACK ON ORANGE DAGKGKOUND WITH HIGH INTENSITY (FHWA TYPE IID REFLECTIVE SHEETING. 10. ALL G0N5TKUGTION SIGNING SHALL BE IN CONFORMANCE WITH THE CURRENT EDITION OF THE MANUAL OF TRAFFIC GONTFOLS FOR GON5TRUGTION AND MAINTENANCE WOKK ZONES, PUDLI5HED BY THE STATE OF GALIFOKNIA, DEPARTMENT OF TRANSPORTATION. IPGG SIDEWALK (2TEATHEF) 2.07 T ?!OMPAGTED Z PARKING `EX15 I NG AG ROADWAY AREA TYPICAL SECTION - DAN" AVE TRAN5PORTATION/PLO GONTROL, DEPARTMEI J BY I cHECKe i� APPROVED BY PRIVATE ENGINEER'S NOTES TO GONTRAGTOIZ THE EX15TENGE AND LOGATION OF ANY UNDERGROUND UTILITY PIPE5, GONDUIT5 OR 5TRUGTURE5 SHOWN ON THESE PLAN5 ARE OBTAINED DY A 5EAKGH OF THE AVAILABLE KEGOKD5. TO THE DF -5T OF OUR KNOWLEDGE, THERE ARE NO EXISTING UTILITIES EXCEPT A5 5HOWN ON THESE DKAWIN65. THE CONTRACTOR 15 REQUIRED TO TAKE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES SHOWN ON THESE DRAWIN65. THE GONTKAGTOF FURTHER A55UME5 ALL LTABILITY AND RE51"ON5113ILITY FOR UTILITY PIPE5, GONDUIT5 OR 5TRUGTURE5 SHOWN OR NOT SHOWN ON THE5E DRAWINGS. CONTRACTOR A65KEE5 THAT HE'51-IALL A55UME 50LE AND COMPLETE RESPONSIBILITY FOR JOD5ITE GONDITION5 DURING THE GOUFSE OF GON5TKUGTION OF THI5 PROJECT, INGLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT, THIS REQUIREMENT SHALL APPLY GONTINUOUSLY AND NOT BE LIMITED .TO NORMAL WORKING HOUKS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE COUNTY, THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OK ALLEGED, IN CONNECTION WITH THE PERFORMANCE OR WORK ON THI5 PROJEGT, EXGEFTING FOR LIABILITY AK151N6 FROM THE SOLE NEGLIGENCE OF THE OWNER EXP. 12/31/01 STREET IMPROVEMENT PLAN5 6ANANA AVENUE 50UTH OF SLOVEIR AVENUE A.P.N. 236-081-21 W.D. NO. ROAD NO. 152850JA FILE NO. 105-106 SHEET OF 5311-1