HomeMy WebLinkAbout5292-1j9m€
r—a. aav
x-G•-+`Fs�
d
V
14
�Gx.:sf:ls9 G� Jc',c%
PROFILE
HDRR' I"= 41y
VERT' I 4'
15
ALMOND
0 E� ev U/
3
Gd V r W ,LU F
tla pE
ttl f d Vey( 11 (1
pf Y QC,i�b Rcf m.ka e t` d U
19 y r a-m.mm- 1
It
TYPICAL SECTION — ALMOND AVENUE
I .Eos
fL. X�Guffar
0
�0
_
00
FvYulc
Tsp sf crirb
G�aCs
Le' p_{
d
V
14
�Gx.:sf:ls9 G� Jc',c%
PROFILE
HDRR' I"= 41y
VERT' I 4'
15
ALMOND
0 E� ev U/
3
Gd V r W ,LU F
tla pE
ttl f d Vey( 11 (1
pf Y QC,i�b Rcf m.ka e t` d U
19 y r a-m.mm- 1
It
TYPICAL SECTION — ALMOND AVENUE
I .Eos
fL. X�Guffar
1 �
I i
4 �
16 17 18
d
L!1
(tl$ d
1151 W �(
I x t
q e 1 n
t'' n pfd 8
0: Q�
IY V.tl.9 'i
—T
clv�rvvE. 1
Y atl
{ �tl
CONSTRUCTION NOTES
Io ---CONSTRUCT 0" CURB E GUTTER PER S.B.CO. STD. N0. 115.
3a --CONSTRUCT CROSS GUTTER E SPANDREL PER S.B.CO. STD. NO. 119.
9o --CONSTRUCT t " A.C. PAVEMENT OVER COMPACTED NATIVE MATERIAL.
0-/ INSTALL MARKERS PER S. B.CO. STD. NO. 304.
S0
0
�0
_
00
-o0
-
1
Dn
°
n
Fa�orc rR
97O RT
0o ca 6 Cii+do
C R/
1 �
I i
4 �
16 17 18
d
L!1
(tl$ d
1151 W �(
I x t
q e 1 n
t'' n pfd 8
0: Q�
IY V.tl.9 'i
—T
clv�rvvE. 1
Y atl
{ �tl
CONSTRUCTION NOTES
Io ---CONSTRUCT 0" CURB E GUTTER PER S.B.CO. STD. N0. 115.
3a --CONSTRUCT CROSS GUTTER E SPANDREL PER S.B.CO. STD. NO. 119.
9o --CONSTRUCT t " A.C. PAVEMENT OVER COMPACTED NATIVE MATERIAL.
0-/ INSTALL MARKERS PER S. B.CO. STD. NO. 304.
S0
0
�0
_
00
-o0
GENERAL NOTES
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THIS PLAN AND THE SAN
BERNARDINO COUNTY STANDARDS AND SPECIFICATIONS.
3. A PERMIT FROM THE SAN BERNARDINO COUNTY TRANSPORTATION DEPART-
MENT WILL BE REQUIRED PRIOR TO THE BEGINNING OF ANY WORK OR
CONSTRUCTION WITHIN THE COUNTY RIGHT OF WAY OR EASEMENT.
3. ALL PIPELINES OR SUBSTRUCTURES OF ANY KIND (AND TELEPHONE AND
POWER POLES, WATER METERS, VALVES, HYDRANTS, ETC.) SHOWN OR NOT
SHOWN ON THESE PLANS WITHIN THE LIMITS OF THIS DEVELOPMENT OR IN
ADJACENT AREAS WHERE IMPROVEMENT WORK IS TO BE DONE SHALL BE
REMOVED OR RELOCATED AT DEVELOPER EXPENSE, AND AT NO COST TO
THE SAN BERNARDINO COUNTY TRANSPORTATION DEPARTMENT, IT SHALL
BE THE OWNERS RESPONSIBILITY TO NOTIFY ALL AGENCIES CONCERNED.
u. ADEQUATE STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE
CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES.
5. IF ASPHALT CONCRETE IS TO BE PLACED DIRECTLY ON SUBGRADE OF
ROAD OR DRAINAGE FACILITIES, A SOILS STERILANT REGISTERED BY
THE E.P.A. FOR USE UNDER A.C. AND P.C.C. SHALL BE UNIFORMLY
APPLIED AT THE MANUFACTURER'S RECOMMENDED RATE FOR THE FULL
PAVEMENT WIDTH PRIOR TO PAVING.
6. AT THE COMPLETION OF PAVING A MATERIALS REPORT SHALL BE
SUBMITTED TO THE CONTRACTS ENGINEER OF THE SAN BERNARDINO
COUNTY TRANSPORTATION DEPT. LISTING ALL TESTS OR DETERMINATIONS
COMPLETED TO VERIFY:
AI R -VALUE
BI STABILITY
7, TRANSPORTATION DEPARTMENT APPROVAL DOES NOT INCLUDE WATER
"IBR SEWER SYSTEM OR ESTIMATE OF QUANTITIES.
B. AN ENCROACHMENT PERMIT MUST FIRST BE OBTAINED FROM THE
COUNTY TRANSPORTATION DEPT. PRIOR TO MAKING APPLICATION
AND ISSUANCE OF A GRADING PERMIT OR BUILDING PERMIT.
9. BENCH MARK: R.R. SPIKE IN POWER POLE NO. 31090E AT THE N.W. CORNER
ALMOND AVENUE AND SANTA ANA AVENUE.
ELEVATION = 965.31 YF.R 5.6. 8W -kb. 4DIf/SLd
K HWt u kh pntm% e6bRRM
xiY Ve repuvN wk uG P nl fr ,
Him PIN e
O I lllrlINMeEh.ud<w wRN' "wR ✓$' AN! Mw b 1
n, rt amyl al In
n.,.n InDfOull Engbwan
.' ®LpWlurw.ya+
5292-:
-
1
I=
tr
1
4
South
_
flJ uint15
-
S:.0
1 0 16
1
Yv✓'
g
�
w - �
1 e:r.
.. IT
• c
VICINITY
MAP
4
GENERAL NOTES
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THIS PLAN AND THE SAN
BERNARDINO COUNTY STANDARDS AND SPECIFICATIONS.
3. A PERMIT FROM THE SAN BERNARDINO COUNTY TRANSPORTATION DEPART-
MENT WILL BE REQUIRED PRIOR TO THE BEGINNING OF ANY WORK OR
CONSTRUCTION WITHIN THE COUNTY RIGHT OF WAY OR EASEMENT.
3. ALL PIPELINES OR SUBSTRUCTURES OF ANY KIND (AND TELEPHONE AND
POWER POLES, WATER METERS, VALVES, HYDRANTS, ETC.) SHOWN OR NOT
SHOWN ON THESE PLANS WITHIN THE LIMITS OF THIS DEVELOPMENT OR IN
ADJACENT AREAS WHERE IMPROVEMENT WORK IS TO BE DONE SHALL BE
REMOVED OR RELOCATED AT DEVELOPER EXPENSE, AND AT NO COST TO
THE SAN BERNARDINO COUNTY TRANSPORTATION DEPARTMENT, IT SHALL
BE THE OWNERS RESPONSIBILITY TO NOTIFY ALL AGENCIES CONCERNED.
u. ADEQUATE STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE
CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES.
5. IF ASPHALT CONCRETE IS TO BE PLACED DIRECTLY ON SUBGRADE OF
ROAD OR DRAINAGE FACILITIES, A SOILS STERILANT REGISTERED BY
THE E.P.A. FOR USE UNDER A.C. AND P.C.C. SHALL BE UNIFORMLY
APPLIED AT THE MANUFACTURER'S RECOMMENDED RATE FOR THE FULL
PAVEMENT WIDTH PRIOR TO PAVING.
6. AT THE COMPLETION OF PAVING A MATERIALS REPORT SHALL BE
SUBMITTED TO THE CONTRACTS ENGINEER OF THE SAN BERNARDINO
COUNTY TRANSPORTATION DEPT. LISTING ALL TESTS OR DETERMINATIONS
COMPLETED TO VERIFY:
AI R -VALUE
BI STABILITY
7, TRANSPORTATION DEPARTMENT APPROVAL DOES NOT INCLUDE WATER
"IBR SEWER SYSTEM OR ESTIMATE OF QUANTITIES.
B. AN ENCROACHMENT PERMIT MUST FIRST BE OBTAINED FROM THE
COUNTY TRANSPORTATION DEPT. PRIOR TO MAKING APPLICATION
AND ISSUANCE OF A GRADING PERMIT OR BUILDING PERMIT.
9. BENCH MARK: R.R. SPIKE IN POWER POLE NO. 31090E AT THE N.W. CORNER
ALMOND AVENUE AND SANTA ANA AVENUE.
ELEVATION = 965.31 YF.R 5.6. 8W -kb. 4DIf/SLd
K HWt u kh pntm% e6bRRM
xiY Ve repuvN wk uG P nl fr ,
Him PIN e
O I lllrlINMeEh.ud<w wRN' "wR ✓$' AN! Mw b 1
n, rt amyl al In
n.,.n InDfOull Engbwan
.' ®LpWlurw.ya+
5292-: